CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
DPNC Yannick FAVRE Electronics Highlights /12/ Electronics Highlights2 Electronics group  3 Engineers  Daniel La Marra  Stéphane Débieux.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
LHCb Outer Tracker Electronics 40MHz Upgrade
Work on Muon System TDR - in progress Word -> Latex ?
Jean-Sebastien Graulich, Geneva
Power pulsing of AFTER in magnetic field
R&D of MPPC for T2K experiment
The CMS Tracking Readout and Front End Driver Testing
Limited Streamer Tube Project Summary
Presentation transcript:

CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich, Geneva

EMR: Electron Muon Ranger  This report is about a team work Como/Trieste: Michela Prest, Erik Vallazza, Daniela Lietti, Davide Bolognini University of Geneva: Franck Cadoux, Florian Maschiotti, Laurent Nicola, Coralie Husi Pierre Bene, Stephane Debieux Havard Wisting, Kaspar Rothenfusser Ghislain Grégoire  A lot happened, trying to summarize Refer to previous presentations for more details EMR talk at CM25 EMR Construction Status at VC128 EMR Cosmic Tests at VC129 EMR Installation talk at CM2 CM26 March 2010Slide 2

CM26 March 2010Slide 3 Daniela Lietti CM25

Construction  Main Steps Cutting to length – done Gluing fibers (up to 20 per day) Layer Assembly Module Assembly CM26 March 2010Slide 4

Integration  Extremely compact assembly CM26 March 2010Slide 5 Outer Box  Difficult access to PMT and electronics after Assembly  Just enough room for local shielding  Heating of electronics (FPGA, HV dividers, etc FEB Flex connector The PMT is attached to the board Shielding not shown

Magnetic Shielding Issue  Situation looked difficult Impossible to shield locally CM26 March 2010Slide 6 3D model from Ghislain (OPERA 3D) EMR thickness Plot Field vs PMT location

Magnetic Shielding Solution  First: Global shield 50 mm thick iron plate EMR is moved back (reduce acceptance)  Second: Local shield on PMT CM26 March 2010Slide 7 EMR PMT axis

CM26 March 2010Slide 8

Magnetic Shielding Summary  The problem was more serious than originally thought  We have now a satisfactory design Large iron reflector between KL and EMR EMR is moved back by 50 mm Local shielding (1m) around each PMT  We had to stop detector production 2 months delay  The PMT-Fiber coupling had to be modified  We are ready to resume production CM26 March 2010Slide 9

Electronics  Each bar is read out on both side but with independent chains  Digital readout Each bar is connected to one pixel of a 64 channels MultiAnode PMT The PMT is connected to a Front End Board (FEB) where the signal is amplified and discriminated The logic signal from the FEB is sampled by a Digitizer and Buffer Card (DBC) The DBC stores the data for the entire duration of the spill The DBC is read out through a VME Controller card at the end of the spill  Analog readout On the other side All the fibers from each are bunched together and coupled to a single 1” PMT The output of the PMT is connected to one channel of a 500 MHz sampling ADC (CAEN V1731) The data is buffered in the ADC and readout at the end of the spill CM26 March 2010Slide 10

CM26 March 2010Slide 11

Electronics Status  FEB Designed and produced by Trieste/Como Based on existing FEB for another experiment AD) Recently modified and tested to use the MAROC amplifier/discriminator chip (instead of Gamma Medica/Ideas VA64TAP)  Digitizer and Buffer Card Design in progress in Geneva  VME Controller Based on general purpose VME board provided by Trieste/Como  Clock and Trigger distribution Under discussion  Sampling ADCs In hand in Geneva CM26 March 2010Slide 12

Cosmics Test  One full module (2 layers) operational in Geneva  DAQ provided by Como/Trieste  Many Thanks to Daniela Lietti and Davide Bolognini CM26 March 2010Slide 13 2 X-Y Silicon strip detectors 10x10 cm 2 Trigger Scintillator 10x10 cm 2 2 EMR Layers

The first EMR Module CM26 March 2010Slide 14 X Y Single anode PMT All fibers bunched FEB Multi-anode PMT coupled to FEB

Analysis – Prerequisite  Using the prototype Front-End Board based on the VA64TAP chip Need to scan the sampling time to determine our working point CM26 March 2010Slide 15

Efficiency Standard PMT Efficiency ~93 % Green Enhanced PMT Efficiency ~98 %  Testing different configurations High Voltage scan With/Without Optical grease Standard/Green enhanced PMT  Two independent analysis Trieste/Como : Michela Prest and Davide Bolognini Geneva: Havard Wisting

Cross talk  Obvious cross talk between channels Between anodes Partially due to the PMT alignment Not only ! Between fibers ? Can improve fiber isolation… CM26 March 2010Slide 17

Cosmics test Summary  Currently taking data at about 3 Hz  Efficiency Measurement consistent with First prototype results: ~97.5 %  Cross talk is a serious issue  Next Steps Integrate the single PMT readout in the DAQ Need to migrate from SBS Bit3 to CAEN VME-PCi interface first Test with the first production module 1.2 mm fibers More precise PMT lodging Define automatic test procedure for QA during production CM26 March 2010Slide 18

Project Plan  Running full speed, we need 6 working days to produce 1 module (2 layers) => Production time: 7 months  EMR production should end in October 2010  Digitalization and Buffer card design test and production Estimated to 6 months  We are considering a partial delivery to RAL this summer in order to have an early test of integration in the DAQ  We also depend on other experiment pressure on our Engineer/Technician staff CM26 March 2010Slide 19