Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

A Short Course in Project Management
AACEI Contingency Forum Contingency Management
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
4.5 Multimedia Production
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Project Cost Management Estimation Budget Cost Control
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
1 Technology Implementation Dr. Khaled Bubshait. 2 Dr. Khaled Ahmed Bubshait Khaled Bubshait is a Professor of project/operations Management at King Fahd.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Project Management Session 7
Chapter 3: The Project Management Process Groups
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Project Management and Scheduling
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Management Lecture 5+6 MS Saba Sahar.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
GE404 Engineering Management Topic1. INTRODUCTION.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Introduction to Project Management
GE404 Engineering Management Topic1. INTRODUCTION 1.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
PLANNING AND SCHEDULING
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Project Management. Lecture 5-2 Introduction This lecture discusses the key components of project management, role of project manager and techniques to.
Specification & Quantities Estimating
Topic1b: Project Life Cycle
1 COST ESTIMATING. 2 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility.
SacProNet An Overview of Project Management Techniques.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
The Proposal Presented by RAR Consulting, LLC Copyright © 2011 RAR Consulting, LLC ● Benicia, California ● PH:
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Develop Project Charter
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Project Management Inspections and Reviews 1 February.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
What is project management?
Project Management.
Development of a project. Initial concept  Market survey  Economic feasibility  Selection of process and site location  (For small plans issue enquiry)
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
WEEK 3 Project Planning.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
California Energy Commission 1 TECHNICAL SUPPORT FOR INCREASING ENERGY EFFICIENCY IN EXISTING BUILDINGS California Energy Commission Request for Proposals.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Camera PDR/CD1 Planning 19 September 2008
GE404 Engineering Management
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Implementation Strategy July 2002
Terry Ring Chemical Engineering University of Utah
Designers’ Manual Overview and Chapter Contents
DEFINING THE PROJECT CHAPTER 4.
Project Management.
MODULE 2 – Project Introduction
CIS12-3 IT Project Management
Project Integration Management
Project Integration Management
Project Overview.
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management

2 Why we want to consider Project Management?

3 WHAT IS THE HEIGHT OF THE BUILDING ?

4

5

6 WORRY TIME DEADLINE

7

8

9 TOP MANAGEMENT ENG. UTILITIES OPERATIONS MANAGEMENT M I DDLEDDLE MANAGEMENT CONSTRUCTION MAINTENANCE ADMINISTRATION R&D

10 PROPOSAL PLAN CONTROL ANALYSIS DECISION PROJECT MANAGEMENT CYCLE

11 PROPOSAL PLAN CONTROL ANALYSIS DECISION PROJECT MANAGEMENT MODEL

12 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility Study Change of Objectives New Product Development Proposal Development Conceptual Estimate Paper Design basis Paper Full Proposal Proposal Project Plan Project Control Analysis Corrective Actions Commissioning Project Meeting Project Status Report Progress Measure Procurement Contractual Conditions Contractor Productivity Procurement Deadlines Manpower Loading Claim Request Change Orders Time/Cost Analysis Project Management Systems

13 PROJECT LIFE CYCLE PB DPF.P. CLIENT. APP. COST ESTIMATE PROJ PLAN LLIP PROJ. EXCU. COMMISSIONING PB- Conceptual Paper DP- Design Paper FP- Full Proposal

14 PROPOSAL

15 PROPOSAL - CONCEPTUAL ESTIMATE PAPER - DESIGN BASIS PAPER - PROJECT PROPOSAL

16 CONCEPTUAL ESTIMATE PAPER PURPOSE OF THE PROPOSED PROJECT DESCRIPTION OF THE PROJECT PROPOSAL MILESTONE SCHEDULE ( MAIN ACTIVITIES )

17 DESIGN BASIS PAPER - PURPOSE OF THE PROPOSED PROJECT - THE RELATIONSHIP OF THE PROJECT TO THE COMPANY CORPOATE PLAN/CURRENT SYSTEM - DESCRIPTION OF THE PROJECT PROPOSAL - REVIEW OF ALTERNATIVE STUDIES - AN ORDER OF MAGNITUDE ESTIMATE ( -30,+30%) - THE SCHEDULE DATES FOR MAJOR MILESTONES INCORPORATES

18 PROJECT PROPOSAL 1. OBJECTIVES 2. DISCUSSION OF THE PROBLEM 3. DESCRIPTION OF THE PROBLEM 4. STATEMENT OF WORK 5. DELIVERABLE ITEMS 6. SCHEDULE 7. MANAGEMENT PLAN 8. PROJECT COORDINATION CHART 9. COST 10. RESOURCES AND FACILITIES 11. RELATED PROJECTS AND EXPERIENCE 12. SPECIAL RESOURCES AND FACILITIES 13. CONSULTANTS AND SUBCONTRACTORS 14. PROPONENT DIVISION 15. Others

19 PLAN

20 PROJECT MANAGEMENT GOALS TIME COST PERFORMANCE SAFETY

21 PROPOSAL PLAN CONTROL ANALYSIS DECISION PROJECT MANAGEMENT CYCLE

22 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility Study Change of Objectives New Product Development Proposal Development Conceptual Estimate Paper Design basis Paper Full Proposal Proposal Project Plan Project Control Analysis Corrective Actions Commissioning Project Meeting Project Status Report Progress Measure Procurement Contractual Conditions Contractor Productivity Procurement Deadlines Manpower Loading Claim Request Change Orders Time/Cost Analysis Project Management Systems

23 PM TECHNIQUES BAR CHART BAR CHART NETWORK NETWORK CPM CPM PERT PERT GERT GERT Reporting Reporting Planning Planning Uncertainty Uncertainty Simulation Simulation Handout # 1

24 ACTIVITIES TIME 4 BAR Chart TODAY

25 A B C D TODAY Activity Time PLANNED WORK ACTUAL W. PERFORMED

26 ESTABLISH PREPARE PLAN OF ACTION SCREENING REQUEST PRE CONTRACTING ACTIVITIES FINALIZE BID SLATE MGMT. APPROVAL CONTRACTORS DEVELOP RESPONSE BID SLATE MGMT. APPROVAL 1/2 321 PREPARE MGMT. SUBMITTAL MGMT. REVIEW SUBMIT PREPARE CONTRACT DRAFT REVISE CONTRACT DRAFT REVIEW CONTRACT DRAFT PREPARE JOB EX. MEETING RELEASE BID PACKAGE JOB EX. MEETING PROJECT Network

27 CONTROL

28 REPORTING METHODS MEETINGS MEETINGS REPORTS REPORTS

29 Controlling Tools Project Meeting Project Status Report Progress Measure Procurement Status Cost Variance Percent Completion Resources Leveling

30 Analysis Contractor Productivity Procurement Deadlines Claim Request Problems

31 Corrective actions Change Orders Time/Cost Estimation Manpower Evaluation

32 PLAN CONTROL ANALYSIS DECISION Re-planning

33 You should have learned trough this session, how to establish and implement a structured approach to plan, control and closing projects. Also you learned a proven "real life" methods and techniques to utilize in managing your projects. In addition, you learned how you can communicate effectively and share the responsibility of managing projects with team members, customers and management. Given this contingency, developed a comparative study between your organization/company’s project management system with the system that has been highlighted in these sessions. Then draw an recommended system that you will ready to discuss with your superior. Use the table attached for your answer. Assignment # 3

34 Stage Practice Gap Recommendations Proposal Plan control Analysis Decision