BCT 100 Overview of the Construction Industry. The Construction Industry What is the ‘Construction Industry’? Who works in this industry? Why is it important?

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Organization of Primary Entities
Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
THE PARTIES TO CONSTRUCTION-RELATED PRIME CONTRACTS Construction-related prime contracts involve owners, architect/engineers, construction managers, and.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
I-THE OWNER’S PERSPECTIVE
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Genesis Solar Module Brochure ™
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Careers in Construction Unit 1. Construction Industry One of the largest industries in America Divided into four major divisions –Residential Light construction.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CONSTFUNDAMENTALSCONSTFUNDAMENTALS Overview of the Construction Industry, Chapter 2.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Construction Contracts and Project Delivery Methods
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Management Approaches. Construction Management Customer appoints Design team and Management team.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Class #1 Contract Delivery Systems
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
PROJECT MANAGEMENT 2 Chu Eu Ho
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Careers in Architecture & Construction
Overview of the Construction Industry
PROJECT DELIVERY METHODS
Introduction DEFINATION :-
Careers in Architecture & Construction
Chapter 2 – Review ‘construction management’
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

BCT 100 Overview of the Construction Industry

The Construction Industry What is the ‘Construction Industry’? Who works in this industry? Why is it important?

Construction…. Is misunderstood by the average person Accounts for 16% of the GNP in the US Is an ever evolving industry

Construction is influenced by: Materials Available Knowledge/Innovation of the builders Skills Available in the Labor Force Needs and Functions of the Proposed Structure Desires of the Building Owners Climate Research and Development of New Technologies

Categories of Construction Residential Buildings Nonresidential Buildings Engineering Facilities Industrial Facilities

Residential Buildings Structures which house people. Single and Multi Family structures. Apartments, Townhouses, Retirement Homes, Assisted Living, Condominiums

Residential Buildings Modern Residential Design Has Few Limits

Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical

Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical

Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical

Engineering Facilities Infrastructure (Dams, Tunnels, Bridges, Highways, Canals), Utilities, Treatment Plants, Marine Structures

Engineering Facilities Infrastructure (Dams, Tunnels, Bridges, Highways, Canals), Utilities, Treatment Plants, Marine Structures

Industrial Facilities Heavy Industry. Refineries, Chemical Plants, Power Generation Plants, Transmission Lines, Oil Rigs, Smelters

The Variables in Construction Scope of Work Cost Quality of the Construction Time to Complete

The Variables in Construction Scope of Work: How big is your project? Does the size of your project increase once on site? Who is responsible for increasing the size of the project?

The Variables in Construction Cost: What is the budget / Contract Sum? What factors can impact Cost? Who is responsible for increasing the cost of the project?

Cost (con’t) Construction spending in 1988 was estimated at 3.22 trillion dollars In 2007, construction spending was estimated to be near 4.8 trillion dollars 15% of industrial workers employed in the US work in the construction trades On average, 5% of all workers in the United States work in construction and related fields. The current economic downturn has temporarily altered this.

The Variables in Construction Quality: Do Drawings and Specifications indicate level of quality? What factors can impact Quality? Who is responsible for maintaining project quality?

The Variables in Construction Schedule: Does the contract stipulate a completion date? What factors can impact Schedule? Who is responsible for maintaining project schedule?

Schedule Unlike Cost, Scope and Quality, the Contractor may not be able to fully manage and control the project schedule Why?

Some critical items may be beyond the control of the contractor.

The Three Major Elements Engineering Construction Project Management

The Three Major Elements Engineering Includes: Architectural Services, Engineering Services including Structural, Mechanical, Civil, Geotechnical. All Design and Documentation and Specifications

The Three Major Elements Construction Includes: General Contractor, Sub- Contractors such as Plumbers, Electricians, Framers, Concrete, Masons, HVAC installers, Flooring, Tile, Cabinetry, Drywall, Insulation. All Construction and Installation, Hands- On work

The Three Major Elements Project Management Includes: Project Manager, Contract Administrator (Architect), Construction Manager, Owner. All non-construction and non-design based construction administration work, including planning in the beginning, bidding, permitting, approvals, correspondence, change orders, rfi’s, payment certif., etc.

Education – 3 Different Tracks Professional Schools – Architects and Engineers Technical / Professional Education – Project Management / Construction Specialist Hands-on Training / Apprenticeship – Union and Non-Union on the job training

Effective Work Teams “A chain is only as strong as its weakest link” Interaction with others on the team is crucial to success Everyone must be a member of some team We are all members of the ‘Construction Team’

Is There A Productivity Problem? Leibing states that the construction industry has consistently had low productivity when compared to other business sectors Business Roundtable studies What Improves Productivity Why Does Productivity Matter?

Importance of Relationships Construction Companies of all shapes and sizes Vast majority are small, owner-operated, often family run businesses

Project Delivery Systems Traditional Alternative Alternatives in project Contractual Relationships

The Traditional Delivery System

Design / Bid / Build Architect/Owner agree on Program Architectural Design and Documentation Submit to Contractors for Bid Prices Selection of Contractor Contractor Builds based upon bid set Architect oversees work is done according to the drawings and specification Changes are documented and priced as a Change Order

Pros / Cons of Design / Bid / Build Architect maintains total control over the project from inception to completion Time consuming Inefficient to design in a vacuum, bid, then revise design based upon builder input

NST: Negotiated Select Design Team and a Select Construction Team review the documents and value engineer details to agree on a contract price/design. Highest satisfaction ratings from all parties involved.

Pros / Cons of Negotiated Select Architect maintains total control over the project from inception to completion, BUT Works with Builder early to discover potential problems Need a Builder that the Owner can trust No Competitive Pricing

Alternative Delivery Systems

Construction Management Construction Manager is introduced CM represents the interests of the owner CM bridges between the Design Team and the Constructors to identify efficiencies Owner may or may not be contractually related to the Design Team and the Construction Team

Types of Construction Management Construction Manager- For Fee CM is paid a percentage of the construction cost for management services Construction Manager- At Risk CM is paid a percentage of cost, but also, Guarantees Final Maximum Price. Some argue this is a conflict of interest

Pros / Cons of Construction Management (CM) CM works directly with the Owner, representing their interests Intended to reduce supervisory requirement of Architect

Design / Build Design Team and Construction Team work for the same company Bid Phase is replaced with continual evaluation of cost throughout the design and documentation process Owner is contractually related to the Design/Build Team

Pros / Cons of Design Build Accelerates the process, by eliminating bidding Owner no longer has the Architect as an independent commentator on the construction work Design services are usually inferior

Integrated Project Delivery Architect and Constructor review the project goals BEFORE the drawings are produced, working together with the consultants and discuss the ‘Best’ methods, and materials, to achieve the Owner’s requirements, Architect’s intent while keeping an eye on Constructability, Cost, Energy Efficiency and Sustainability

What is Value Engineering? Architect and Constructor review the drawings and discuss the ‘Best’ methods, and materials, to achieve the Architect’s intent while keeping an eye on Constructability and Cost