2015 IEEE REPC Engineering Analysis of

Slides:



Advertisements
Similar presentations
April 22, 2008 Board Called Public Hearing on BZA #SE , March 6, 2008 APPLICANT: T-Mobile, LLC.
Advertisements

Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Cooperative Continuity Management
MINING ROADMAP DATA: ALDOT’S EARLY EXPERIENCE 2013 SOUTHEAST REGIONAL MAINTENANCE CONFERENCE.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
National Best Practices Conference Covered Bridge Preservation Analyzing Covered Bridges for Live Loads Covered Bridge Preservation National Best Practices.
BIOMASS POWER PLANT Jo-Carroll Energy, Inc. (NFP).
South Boston Energy Project South Boston, VA
Networking the World TM 86 Leon Kempner, Jr., P.E. Bonneville Power Administration February 6, 2000 IEEE Three Second Gust Extreme Wind Speed Map, CP2363.
Rocky Mountain Power 2011 Clinic Dynamic Line Rating System Zhao Qi University of Utah.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 6 – 10, 2007 St. Louis, Missouri Trnsport User Group Trnsport Task.
Oregon Public Utility Commission Safety and Reliability Section Jerry Murray, Manager Bob Sipler, Utility Analyst What is an “Attachment”? … that’s easy!
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Experience you can trust. Hurricane Hardening Commission Staff Workshop on Electric Utility Infrastructure Richard E. Brown, PhD, PE Tallahassee,
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
2015 IEEE Rural Electric Power Conference Asheville, North Carolina.
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
Lyndonville Electric Department Feasibility Analysis Review December 2,
IEEE Standards Coordinating Committee on National Fire Protection Association Standards 2008 National Electrical Code CMP#14 SCC 18 Report on Comments.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
Experience you can trust. 1 Electric Infrastructure Hardening Rebuilding Utility Infrastructure LSU Center for Energy Studies Bill Snyder
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
2006 ANNUAL MEETING Arlington, Virginia INDUSTRY / UNIVERSITY COOPERATIVE RESEARCH CENTERS PROGRAM Pre-Session: ROLE OF EVALUATOR 8:00 - 9:00 am Thursday,
11/24/20151 Guidelines for NECA CMP Representatives National Electrical Contractors Association.
CALIFORNIA ENERGY COMMISSION Electricity Supply Adequacy in the West Daniel Nix Deputy Director California Energy Commission April 2000 Committee on Regional.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL.
The Legislative Process FLORIDA MODEL LEGISLATURE.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
The Oregon Joint Use Association A Progressive Model for Industry Cooperation Sue Vogel IEEE Standards Association
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Fall River Electric Infrastructure in Island Park Bryan Case, CEO.
Presented by Leighton Porter, EIT Monte R. Lee & Company
The House of Representatives
Application of Northern Virginia Electric Cooperative PUE
Utility Needs and Smart Grid for Major Storm Events
Code Governance Review UNC Modification Proposals
2013 Specification Implementation
Reach 4 Air Valve Replacements Award of Construction Contracts
ENGINEERING SERVICES Report National Sunroom Association
Aerial Fiber Optic Basics 101
TxDOT Utility Related Issues
Transmission Engineering
General Manager’s Report
SAFE POWER LINE WORKING DISTANCES
The Necessary Criteria for a UNC Modification Proposal
2013 Specification Implementation
Part III SALES FORCE ACTIVITIES
Changes to Part 4 – Work Rules
Unit 4 - A06 – Review Grade Criteria To get a c
Living Donor Committee
Wind Energy Permitting
NESC Update Present & Future
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

2015 IEEE REPC Engineering Analysis of Possible Effects of 2017 NESC Change Proposal To Modify or Remove 60’ Exemption April 20, 2015 Robert W. Harris, PE and Shawn M. Higbe, PE

Background Debate on validity of Rule 250B and 60’ Exclusion began nearly 20 years ago. After 2012 Code Cycle, some thought the issue settled. Hurricane Sandy breathed new life into the issue.

2017 NESC Code Cycle Change Proposals submitted first half of 2013. Subcommittees met Fall 2013. Two CPs submitted on these Rules: 250B Combined Ice & Wind District 250C Extreme Wind 250D Extreme Ice & Wind

NESC Change Proposals CP 4611 Proposed Elimination of: Rule 250B 60’ Exemption for Rule 250C 60’ Exemption for Rule 250D Unanimously Rejected by SC 5

NESC Change Proposals CP 4610 Originally Proposed: Rejected by SC 5 15.5 psf for Grade C 18 psf for Grade B Only if structure <= 60’ Only for Rule 250C Rule 250D? Rejected by SC 5

NESC Change Proposals CP 4610 (Modified) Proposed: Tie Vote! 15 psf regardless of Grade Only if structure <= 60’ Only for Rule 250C Eliminating 60’ Exclusion for Rule 250D Tie Vote!

NRECA’s Role Keep up with developments which affect our members. Inform our members. Seek guidance and support, if necessary, to determine further action. T&D Engineering Committee.

NRECA T&D Committee 74 Co-Op Engineers, RUS Representatives & Consultants. Six different Subcommittees. Overhead Lines Subcommittee Kevin Jordan is a member from Horry Electric Cooperative in Conway, South Carolina.

Why South Carolina?

Study Group Ten South Carolina Distribution Co-Ops Two North Carolina Distribution Co-Ops One Distribution Co-Op Each from Florida & Georgia Two G&T Co-Ops

Shawn M. Higbe, PE McCall-Thomas Engineering Co., Inc. Orangeburg, SC

Project Details Bid Proposal from McCall-Thomas Engineering Model recently built Distribution Lines. Analyze using SpidaCalc and Partner Staking. Evaluate modification and elimination of the 60’ Exclusion. Analyze effect of Joint Use Attachments.

Line Designs 1 - #2 ACSR 1 - #1/0 ACSR 3 - #336 ACSR 3 - #477 ACSR All built to Rule 250B- Medium Load District- Grade C

Rule 250C- Extreme Wind Extreme Wind at 15 psf Grade C Existing Grade B Extreme Wind at 15 psf Grade B Extreme wind at 18 psf Grade B Extreme Wind at 90 mph Extreme Wind at 130 mph

Additional Loading Joint Use One cooperative fiber, 1’ below neutral One telephone joint user One telephone and one cable joint user One cooperative fiber, one telephone and one cable joint user

Basic Design Data (As-Built for Rule 250B) Standard RUS 25 kV construction Southern Pine CCA Poles 40’ Class 5 for 1 - 2 ACSR 40’ Class 4 for 1 - 1/0 ACSR 40’ Class 4 for all 3 base cases 45’ Class 3 for 3 lines with taps 50’ Class 3 for 3 vertical construction 55’ Class 3 for 3 vertical construction with taps

Cost Analysis Pole Height Class and Cost Data Material and installation cost of poles only.

Grade C Analysis 1 - #2 ACSR - Power 19 Poles Case Description Change-Out Requirement Cost Increase Extreme Wind, 15 psf None NA Extreme Wind, 15.5 psf Extreme Wind, 90 mph Extreme Wind, 130 mph 2 poles 1.78%

Grade C Analysis 3 - #336 ACSR - Power 22 Poles Case Description Change-Out Requirement Cost Increase Extreme Wind, 15 psf None NA Extreme Wind, 15.5 psf 1 pole 0.17% Extreme Wind, 90 mph 4 poles 0.94% Extreme Wind, 130 mph 19 poles 14.15%

Grade C Analysis 1 - #1/0 ACSR - Power/JU 10 Poles Case Description Change-Out Requirement Cost Increase Extreme Wind, 15 psf – Power Only None NA Extreme Wind, 15.5 psf – Power Only Extreme Wind, 90 mph – Power Only Extreme Wind, 130 mph – Power Only 4 poles 8.17% Extreme Wind, 15 psf – Power/JU 0 / 1 / 2 / 4 0 / 0.38 / 1.2 / 3.42% Exreme Wind, 15.5 psf – Power/JU 0 / 1 / 3 / 4 0 / 0.38 / 1.58 / 3.42% Extreme Wind, 90 mph – Power/JU 2 / 2 / 4 / 5 0.98 / 1.39 / 3.42 / 10.98% Extreme Wind, 130 mph – Power/JU 6 / 7 / 9 / 9 20.42 / 25.27 / 40.8 / 58.69%

Grade C Analysis 3 - #477 ACSR - Power/JU 27 Poles Case Description Change-Out Requirement Cost Increase Extreme Wind, 15 psf – Power Only 1 pole 0.8% Extreme Wind, 15.5 psf – Power Only Extreme Wind, 90 mph – Power Only 3 poles 1.63% Extreme Wind, 130 mph – Power Only 23 poles 10.75% Extreme Wind, 15 psf – Power/JU 2 / 4 / 5 / 5 1.3 / 2.21 / 2.54 / 5.23% Exreme Wind, 15.5 psf – Power/JU 3 / 4 / 5 / 6 1.63 / 2.21 / 3.72 / 5.56% Extreme Wind, 90 mph – Power/JU 3 / 7 / 13 / 17 3.1 / 5.21 / 8.4 / 9.62% Extreme Wind, 130 mph – Power/JU 24 / 25 / 25 / 25 33.6 / 44.9 / 51.2 / 60.8%

Grade B Analysis 1 - #2 ACSR - Power 19 Poles Case Description Change-Out Requirement Cost Increase Medium B 2 poles 0.95% Extreme Wind, 15 psf None NA Extreme Wind, 18 psf

Grade B Analysis 3 - #336 ACSR - Power 22 Poles Case Description Change-Out Requirement Cost Increase Medium B 1 pole 2.27% Extreme Wind, 15 psf 0.16% Extreme Wind, 18 psf

Grade B Analysis 1 - #1/0 ACSR - Power/JU 10 Poles Case Description Change-Out Requirement Cost Increase Medium B – Power Only 1 pole 0.83% Extreme Wind, 15 psf – Power Only None NA Extreme Wind, 18 psf – Power Only Medium B – Power/JU 0 / 2 / 3 / 5 0 / 2.02 / 3.27 / 2.54% Exreme Wind, 15 psf – Power/JU 0 / 1 / 3 / 5 0 / 0 / 0 / 1.97% Extreme Wind, 18 psf – Power/JU 0 / 1 / 3 / 3 0 / 0 / 0 / 4.2%

Grade B Analysis 3 - #477 ACSR - Power/JU 27 Poles Case Description Change-Out Requirement Cost Increase Medium B – Power Only 2 poles 0.8% Extreme Wind, 15 psf – Power Only 1 pole 0.46% Extreme Wind, 18 psf – Power Only 3 poles 1.61% Medium B – Power/JU 3 / 2 / 5 / 14 2.66 / 0.67 / 1.47 / 4.14% Exreme Wind, 15 psf – Power/JU 2 / 4 / 3 / 6 1.39 / 2.19 / 3.81 / 4.7% Extreme Wind, 18 psf – Power/JU 5 / 5 / 5 / 6 3.23 / 4.02 / 4.82 / 7.16%

Conclusion Current Change Proposal- minimal cost increases, but increases design complexity for no apparent gains. 15.5 psf and 18 psf cause more significant cost increases. Elimination of 60’ Exclusion would bring major cost increases, especially in joint use situations.

VP, Director of Electrical Engineering Division Questions? Robert W. Harris, PE Principal, Transmission & Distribution Engineering Office 703-907-5753 Cell 571-205-3189 robert.harris@nreca.coop Shawn M. Higbe, PE VP, Director of Electrical Engineering Division www.McCall-Thomas.com Office 803-534-1040, ext. 1218 shigbe@mcteng.com