V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
Injection test? Mike Lamont For initial discussion.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Schedule IT General Schedule 9 th, September 09 Today.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
V. Kain AB/OP1Chamonix XV What is required to safely fill the LHC? V.Kain AB/OP Input from: B.Goddard, M.Jonker, Y.Kadi, R.Losito, V.Mertens, B.Puccio,
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
SPS extraction, transfer lines, injection
Jan Uythoven For discussion
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Safe Injection into the LHC V.Kain AB/CO
Safe Injection into the LHC V.Kain AB/CO
Thursday morning – optics correction
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Week 35 – Technical Stop and Restart
Machine Protection System Commissioning plans
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
1v1.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
IP8 aperture measurements (07:30-10:30)
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Interlocking strategy
New page for summary of test status
Presentation transcript:

V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do we need to inject? Interfaces Testing

V. Kain, G.H. Hemelsoet AB/OP2Nov 08, 2007 What do we need to inject? (1) Last 200 m of transfer line Injection Septum MSI (5 magnets, MSIB and MSIA, one power converter) Injection kicker MKI (4 magnets, 54 kV) Injection stopper TDI Mask TCDD (Auxiliary collimators TCLIA and TCLIB) Transfer line MSI Q5Q4 D2 MKI IP2 kicks in the vertical plane TDI TCDD TCLIA + TCLIB

V. Kain, G.H. Hemelsoet AB/OP3Nov 08, 2007 What do we need to inject? (2) Transfer line MSI Q5Q4 D2 MKI IP2 TDI TCDD TCLIA + TCLIB BI in the LHC –BTVs – application: Fabio For point 2: BTVSS.6L2.B1, BTVSI.C5L2.B1, BTVSI.A5L2.B1, BTVST.A4L2 –BLMs (relevant for injection tuning) – partly SPS timing, partly LHC timing –Injection acquisition for LHC BLMs: application? –5 LHC BLMs on the MSI AND 5 SPS BLMs on the MSI (the last TI2 and TI8 ones) –3 LHC BLMs on the TDI –no BLM on TCDD, but at entrance of D1 –(BLMs for TCLIA/TCLIB) –(no mention of LHC BPMs, nothing special for injection region)

V. Kain, G.H. Hemelsoet AB/OP4Nov 08, 2007 Interfaces (1) Interlocking –Supervision application for East and West Extraction in SPS will be updated to include injection BICs –MKI needs injection permit to pulse remotely ALICE ZDC unmaskable LHC beam permit unmaskable –Masking needs LHC Safe Beam Flag (SLP, timing) –Master BIC will be updated using the ‘real’ logic (next year) SMP generator box for: –Beam presence –LHC SB –SPS probe flag –SPS SB Injection BIC still missing

V. Kain, G.H. Hemelsoet AB/OP5Nov 08, 2007 Interfaces (2) RF – pre-pulse –optical fiber link to point 4 LBDS – abort gap watch dog –direct fiber link with point 6 –OASIS: injection permit BETS window watch dog window (AGK) PFN voltage circulating intensity like to have this as a fixed display Timing –“Next Injection Ring” event –Injection warning (1000 ms before injection) –SLP energy for BETS SPS example, no AGK

V. Kain, G.H. Hemelsoet AB/OP6Nov 08, 2007 Transfer lines Power converters: –Power converters including MSI: SPS MUGEFs hardware commissioned (heat run,…) settings available – SPS timing – SPS cycle interlocking via transfer line BICs (ROCS surveillance) BI: –All applications ready –All equipment already defined for logging (DB and SDDS) fixed displays dedicated applications (BTVs, BLMs, BTCs, YASP) –still missing: critical settings for BLMs TCDIs: –Only three collimators in TI 2 hardware commissioned –Not connected to BICs yet –(Two partly beam commissioned setting up methods still to be worked on) –Application available critical settings do not exist yet

V. Kain, G.H. Hemelsoet AB/OP7Nov 08, 2007 MKI Interlock to ring BIC –Local/remote –SIS: temperatures Interlock to injection BIC –State Settings: LSA settings and critical settings –LhcMKIstate standby, on, off –LhcMKIkick delay, length, strength (57 kV), enable/disable windows: critical settings Application in progress (Georges-Henry) BETS like MKE in SPS –uses SLP energy Logging still needs to be discussed Alarms still to be defined for OP

V. Kain, G.H. Hemelsoet AB/OP8Nov 08, 2007 TDI/TCDD - collimators Needs LSA settings and critical settings via collimator control User permit to Injection BIC – TDI needs to be in “protect” during injection User permit to Ring BIC, beam specific –TDI needs to be out after injection TCDD in IR2 moveable (in/out) –User permit to Injection BIC → needs to be closed during injection –Alarms → needs to be open otherwise Controls: collimator control TCLIA/TCLIB → collimators, Stefano, interlocking like TDI TDI ringBIC : TDI pos > TDI ringBIC TDI injBIC : TDI pos < TDI injBIC MKI standby: t 0

V. Kain, G.H. Hemelsoet AB/OP9Nov 08, 2007 Other stuff Knobs for polarity changes of experimental magnets, separation on/off, crossing on/off: –experimental magnet, correctors, compensators, MKI Orthogonal steering at MSI → YASP Injection steering: –MKI part of it? –define LSA parameter angle for MKI → kV Injection triggered acquisition!!!! Need to be able to correlate beam loss to injection event –Nothing foreseen for the BLMs –Only 1 Hz data publishing –→ BLMs on TDI: LHC BLMs!!! “Injection” logging? –to be defined –‘SDA’ – XPOC like? Fixed displays –to be defined (Injection quality check → SIS) –not an issue for start-up

V. Kain, G.H. Hemelsoet AB/OP10Nov 08, 2007 Testing…dry (1) Full testing of injection equipment requires: –Timing –LHC cycling –SLP energy distributed and generated by the LBDS BETS –LHC beam permit – closed loop (LBDS armed → LHC closed!!), closing locally? –Alice ZDC giving green light (for point 2) –LHC Safe Beam Flag distributed TDI, TCLIs, TCDIs masked –Functions defined for TDI (TCLIA/TCLIB as well) –TCDD controlled within collimator control system –Cooling (TDI, TCDD, …) –Logging defined –Sequencer: injection sequence, timing tables prepared –RF pre-pulse (simulation mode?) –LBDS synchronisation commissioned → abort gap watchdog Full testing of injection interlocking requires: –Interlock functions defined for TDI (TCLIA/TCLIB) –Interlock functions defined for TCDIs –TL pulsing – MSI FMCM, MSI PC sum fault –Real Master BIC to verify injection permit result LHC-SPS flag distribution

V. Kain, G.H. Hemelsoet AB/OP11Nov 08, 2007 Testing…dry (2) Scenario: interleaved injections: –Sequencer – injection sequencing –“Next Injection Ring” event used by MKIs to condition which one to pulse –ONE injection warning event: injection warning for charging PFNs –Pre-pulse for pulse Scenario: injection – the whole chain: injector chain → first turns in the LHC: –Sequencer – injection sequencing –Mini-conditioning of MKIs?? Uncoupled injection timing, simulated pre-pulse? –Timing table with all events –BI stuff as well: BLMs!!!??? –Injection logging

V. Kain, G.H. Hemelsoet AB/OP12Nov 08, 2007 Testing…dry (3) Scenario: inject & dump: –Sequencer… –Together with LBDS –Dump on first turn Scenario: injection finished – prepare for ramp: –Downstream TEDs in –MKI disabled –MKI standby! (before moving TDI) –Move out TDI → state transition: injection permit, no state transition: beam permit –Move out TCLIA/TCLIB → like TDI –Move out TCDD in IR2 …

V. Kain, G.H. Hemelsoet AB/OP13Nov 08, 2007 Summary Lots of stuff already there –Equipment partly already hardware commissioned –Applications either just need to be configured for the LHC or are under way Logging and alarms still need some work Triggered acquisition for BLMs during injection? Testing needs to be worked out carefully –Parallelism –Lots of details to be defined