M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004.

Slides:



Advertisements
Similar presentations
Android Enabled Camera Positioning system Design Team 3 Chris Sigler Yan Sidronio Ryan Popa Jeremy Iamurri Austin Fletcher Facilitator: Dr. Oweiss Sponsor:
Advertisements

Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
ENGR-1101 Introduction to Engineering John J. Helferty (ECE) ECEDHA 9/15/2012.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Blake Davis: Electrical Engineering Luke Haberkern: Electrical and Computer Engineering Brian Hacsi: Electrical and Computer Engineering Chris Kircher:
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
GLYN High-Tech Distribution Your High-Tech Solutions Provider.
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
UNC ROVERSAT IV University of Northern Colorado Critical Design Review Friday, June
DemoSat III Launch Readiness Review - July 29, 2005 Presented by: David Gooding Erik Andersen Anna Vigil Matt Elsner Al Crawley.
PDR – GPS Rover Travis Gruber Matthew Kennedy Marcin Skirucha Phill Treddenick.
Wireless Ethernet AT-Rover Group 1 Beau Cook, Barry Greenwood, Danny Martin, Matt Patella, Ian Petrie.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Launch Readiness Review 4/21/06 -David Gooding -Erik Andersen -Anna Vigil -Matt Elsner -Augustine Trujillo DemoSat IV.
Team GPS Rover Critical Design Review Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Mars Rover TEAM CPNE Crossen Davis Peter Ramer Nancy Robinson Eric Rodriguez.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
Critical Design Review Colorado State University - Pueblo April 15, 2005.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Engineering 1040: Mechanisms & Electric Circuits Fall 2011 Introduction to Embedded Systems.
Dr. Jennifer Rochlis. Overview Build a technology testbed for future rover concepts Develop and demonstrate operations and mission concepts.
DemoSat V: The Mousetrap August 03, 2007 Matt Hoffman –Team captain, LandSAT construction Devlin Thyne – FieldSAT/GPS SAT construction, testing David Fifield.
DemoSat IV Critical Design Review Metropolitan State College of Denver April 21, 2006.
o Portable low-cost aerial drone that can be used for reconnaissance o Relay real-time video and data, like location, heading, battery life o Take high-resolution.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Critical Design Review Presentation Jan. 20, 2011.
Vanderbilt Aerospace Club Rocket Launched Reconnaissance UAV Design Team William Runge (ME) Kyser Miree (ME) Thomas Carroll (ME) Thomas Bowden.
High Altitude Imaging and Atmospheric Data Collection Experiment by SABRE (Scientific Aerospace and Balloon Research Engineers) Team Advisor:Atin Sinha.
Team Parro Project HUSP. Team Members Jason Rollins – Project Manager / Electrical Design Jason Rollins – Project Manager / Electrical Design Shawn Mullins.
Phong Le (EE) Josh Haley (CPE) Brandon Reeves (EE) Jerard Jose (EE)
UK Aerial Robotics Team UK IDEA Laboratory Workforce Development: The UK Aerial Robotics Team and the PAX River Student UAV Competition Dale McClure (Matt.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado Critical.
AMCOM MK66 Guidance Module Software Block Diagram Data Handler IMU ProcessingGPS ProcessingRMS Control Serial I/O Ctrl Parallel Ctrl.Actuate,
UNIT I. EMBEDDED SYSTEM It is an electrical/electro-mechanical system designed to perform a specific function. It is a combination of hardware and software.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
AIAA Student Section Meeting December 2, 2004 spacegrant.colorado.edu/ demosat Colorado Space Grant Consortium.
DemoSat IV: RedRoverSat University of Colorado at Boulder Jaime Catchen, Chris Homolac, Emily Walters August 9, 2006.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
BlackBox Sat Critical Design Review Colorado State University-Pueblo April 2, 2004 Greg Barela Jose Segovia Enrique Cornejo.
Smart Lens Robot William McCombie IMDL Spring 2007.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Group 18 Chen Zhang Client: Professor Frank Yin Sept. 30, 2015 Smart Walker Project PRELIMINARY PRESENTATION.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
Planetary Lander PDR Team Name
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Shape Memory Alloy Reusable Deployment Mechanism
RoverSat Critical Design Review UCCS Space Grant Team
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Ruggedized Camera Encoder
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
Mars Rover CDR Team Name
Presentation transcript:

M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004

Mission Description Deploy rover from the payload carrier upon landing. Image flight and landing site autonomously. Accomplish mission under strict mass limitations.

Mission Goals Design and build an autonomous rover and its carrier under strict mass limitation of 1.8 kg. Incorporate imaging system on the rover to video entire fight and the landing site. Carrier & Rover must survive: high altitude extreme cold temperatures impact forces during landing Include additional Windsat mission into Rover package

NASA Benefits Prototype development which may be used during future missions to Mars or the moon. Test existing paradigms of rover design. Explore new methods of rover design, construction, and deployment.

Project Requirements Carrier and Rover combined must meet 1.8 kg mass limitation. Rover must image the landing site. Rover must deploy at the landing site. Rover must have a drive system allowing it to maneuver on the ground at the landing site.

Mass Budget Carrier400g Camera (w/out battery)166g Drive motor/gearbox assembly200g Chassis & Electronics400g Wheels 400g WindSat addition234g Total 1800g

Rover Design Must operate in either orientation. Drive arms move to raise chassis height. Each wheel has independent motor. Chassis made of carbon fiber composite. Electronics will be insulated inside chassis.

Rover Design

Wheel Design

Rover Drive System Drive the Rover out of the carrier and around the landing site. One electric motor per wheel to get four wheel drive and steering. Operate the rover in either of two possible carrier landing orientations. Incorporate obstacle avoidance system.

Drive Components Orientation sensor. Drive motors inside each wheel. Movable side arms to raise chassis height. Obstacle avoidance system. Drive wheels.

Drive System Interfaces Orientation Sensor Obstacle Sensor Controller Drive Arms Motors

Drive System Prototyping Aluminum wheels: Machined from solid 4.25 inch diameter aluminum bar stock. Goal weight (mass) of 100 grams per wheel. Drive arms machined from ¼” x ¾” stock.

Carrier System Securely carry the Rover payload to high altitude and back. Constructed foam and carbon fiber composite. Open to allow the deployment of the Rover upon landing in correct orientation.

Carrier Components Air piston system to open carrier Foam-core with carbon fiber Carrier. Rover door latching mechanism. Rover opening mechanism.

Carrier Design

Imaging System Digital video system will be employed to document entire flight plus image landing site. Mounted to the Rover so multiple views of the landing site will be recorded upon deployment.

Imaging Components Panasonic SD mini digital video camera. MPEG4 video compression. Over 2 hr. 20 Min. of recording time. 320x240 dot/ 420 Kbps. 512 MB memory card. Solar power unit to power video camera.

Electrical Requirements Control and operate the Imaging & Drive Systems. Open the Rover carrier upon landing. Orientate the Rover and chassis. Direct rover around obstacles. Process and store in flight data.

Electrical Systems Embedded Computer Sensors Subsystem Actuators Subsystem USB Subsystem GPS Subsystem

Subsystem - Stamp (Sensors) Purpose: Read data from sensors, communicate with embedded computer Interface: SPI (Serial Peripheral Interface)

Subsystem - Stamp (Sensors) Altimeters Temp Sensors Tilt Sensors Digital Compass Wheel Encoders Arm Angle Encoders BASIC STAMP II Controllers SPI Interface Embedded Computer

Subsystem - Stamp (Actuators) Purpose: Control actuators, communicate with embedded computer Interface: SPI (Serial Peripheral Interface)

Subsystem - Stamp (Actuators) BASIC STAMP II Controllers SPI Interface Embedded Computer Parallax Servo Controller Pololu Motor Controllers Relays LCD Motors Servos

Subsystem – USB Purpose: Provide communication between embedded computer and USB Devices Interface: System Bus

Subsystem – USB TD OT243 USB Host Controller System Bus Interface Embedded Computer Flash Memory Hub Camera 3 Camera 2 Camera 1

Subsystem – GPS Purpose: receive GPS signals and communicate coordinates to embedded computer Interface: RS232 Serial

Subsystem – GPS Gamin GPS OEM RS232 Serial Interface Embedded Computer Antenna

Power Budget (incomplete)

Budget (Electronics/Software)

Prototyping (Electronics/Software) Set up development computer with compiler, dev tools, NFS. Ran simple program on embedded computer to flash LED's Tested various USB cams and software Experiences/Hardware from last year

Electronics Components Altitude sensor. Rover orientation sensor. Obstacle avoidance sensor. Micro-controller. Wiring to/from sensors, camera and drive motors. Carrier door latch servo. Onboard programming.

Project Organization Professor Keith Norwood Don Grissom Team Lead Power Oscar Matt Luke Nathan Chris Amparo Imaging Brian Don Chris Carrier Oscar Leah Walter John Electronics Luke Nathan Amparo Chassis John Walter Matt Leah Brian Don

Budget Expenses to date: Beginning total $4000 Carbon fiber materials $ 150 Camera $ 800 Motors/gearbox assy. $ 40 Wheel material $ 100 Machining tools $ 50 Carrier material $ 30 Misc. Material and Electronics $1800 subtotal $2970 Remaining Balance$1030

Schedule Construction Completed June 15 Operational testing Completed July 20 Final Construction Completed July 30 Mission Readiness Review July 30 Launch Readiness Review Aug 6 Launch Aug 7