Memorial Complex Boiler Retrofit Project John Chapman Assistant Director of Public Works Maintenance Division.

Slides:



Advertisements
Similar presentations
Flexible Budgets and Standard Costs
Advertisements

Elements of an Effective Safety and Health Program
§ 1.10 Properties of the Real Number System. Angel, Elementary Algebra, 7ed 2 Commutative Property Commutative Property of Addition If a and b represent.
Evaluate when y = 3 a.) 8y = b.) 39 = y c.) y + (-6) = d.) 14 – 2y =
Subterranean Success: Geothermal Energy Powering Schools
1 Mobilizing Available Funds To Destroy Ozone Depleting Substances.
Results on the ground Social Infrastructure Retrofitting Project World Bank loan - $22,6 mln competed in March 2008.
The Year of…. 2 #1 Goal Make and Save Money.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
< C ² Carbon Reduction Technology Ltd A Revolution in Lighting - The e-lamp.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Addition Facts
Higher Apprenticeship in Leadership & Management 19 October 2012 Matthew Street Interim Head of Development.
Construction Engineering 221
Careers in Construction & Apprenticeship. Why Construction? Largest Industry in U.S. 1.9 million construction companies in U.S. –6 million workers In.
Building a Better Future Stretch Building Code October 15, 2009.
Some Practice Questions in Engineering Economics
Convergence Technician Survey- 22 responses Does entry-level Convergence Technician add value to your company – 73% yes 27% no Do you employ people with.
Slide 1 of 24 9/2010 4th Pre-Event Learning Point SHOW ME THE MONEY Important Consideration.
1 Software Engineering II The Business Aspects of Software Engineering.
Capital Budgeting Problems
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Teaching through metacognition An approach to show pupils the necessity to change – if they are to learn (Based upon Vygotsky and cognitive psychology)
Analyzing Transactions
Federal Reserve Bank of Boston Case Study
CALDSTEEL PRESENTATION. METALWORK INDUSTRIAL PROJECTS ASSEMBLY INDUSTRIAL.
Energy Efficiency Presentation A system that:- 1.Cuts Restaurant energy costs by 20% 2.Pays for itself between 9 and 18 months 3.Can be retrospectively.
Company Introduction…….
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Saving Energy In Schools Okehampton College - Devon.
Rhode Island Gas Energy Efficiency Filing Summary February 15, 2007 RI GHG Stakeholders Meeting.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
Replacement Analysis. Chapter 11 - Replacement Given a cash flow profile for current and replacement equipment, be able to use either the cash flow or.
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Chapter ChEn 4253 Terry A. Ring
Energy Policy some issues … Charalampos Theopemptou Commissioner for the Environment Akamas.
Sprayer Economics Gary Schnitkey University of Illinois.
FY 2009 COST SAVING MEASURES Gov. Body Meeting Oct. 14, 2008.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
What are the Education Needs of Agriculture? David Sackett Managing Director, Growth Farms 6 th June 2013.
Addition 1’s to 20.
End Simplify A. 13B. 147 C. 17D – 2(5)+7.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Week 1.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
Calculating Efficiency Opportunities in Insulation Workgroup Meeting May 2014 Charlie Schreier, PE Engineer.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
De Anza ES 69 Intro to Energy Management Technology Energy Economics Scott Gould Energy Engineer Stanford University.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
This year 315 students are learning automobile mechanics and automobile electrician specialties in Transport department. Student’s qualification - automobile.
Architecture & Construction PREPARING FOR COLLEGE, CAREER AND CITIZENSHIP
Electrical Installation -What does a electrical installation contractor sell? _____________________________________________________________________ -Who.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Negotiations for Technology Transfers Getting access to new technology.
Assessing Electric Utility Incentives and Support Fred Yebra, P.E. Energy Engineer State Energy Conservation Office July 28, 2015 Presentation to the Association.
THE FINANCING OF ENERGY CONSERVATION MEASURES BY ARKANSAS SCHOOL DISTRICTS Presented by: Heartsill Ragon III.
 Hourly Rate: $13.92-$36.25 mean: $23.24  Annual pay mean: $48,300  Current job openings: 260  Qualifications: understand the workings of a air.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016.
Energy Conservation Building Upgrades Alma School District.
Agricultural Mechanics Industry Careers Agricultural Engineer –Designs tractors and agricultural machines.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
People. purpose. performance. Todd County Schools October 30th, 2013.
City of Gainesville Facilities Management Department Citizen’s Academy April, 2016.
January 12, 2017.
Abbas Shirian, PE Certified GeoExchange Designer
The Engineering and Maintenance Division
Pros of using AC and Appliance Repair Company Services.
Presentation transcript:

Memorial Complex Boiler Retrofit Project John Chapman Assistant Director of Public Works Maintenance Division

WHY? TO PROVIDE HEAT IN THE UNHEATED AREAS OF THE MEMORIAL COMPLEX TO PROVIDE FREEZE PROTECTION TO BE BETTER PREPARED FOR POTENTIAL TENNANTS.

TO BE MORE ENERGY EFFICEINT. TO SAVE MAINTENANCE TIME AND COSTS.

HOW?

WHO? EXISTING STAFF – Rick Booth – Master HVAC with 37 years experience. - Terry Boutwell – 43 years experience as an electrician. - Greg Snyder – 15+ years experience as an electrician. - Josh Skidmore – 5+ years experience as an electrician.

2 CONTRACTUAL WORKERS FOR THE DURATION OF THE PROJECT ESTIMATED AT 350 HOURS (8-9 WEEKS) PAY RANGE $15 - $20 PER HOUR (BASED ON QUALIFICATIONS) $10,500 - $14,000

AIRCON – Jason Pannone - Licensed PE - assistance in project management. - engineered the project. - assist with technical aspects of the project.

WHEN? AS SOON AS POSSIBLE. OTHER PROJECTS WILL BE PUT ON HOLD. OTHER MAINTENANCE REPAIRS BE PUT ON HOLD IF NOT CRITICAL.

OTHER PROJECT POINTS SELL THE OLD BOILERS AND RELATED EQUIPMENT. SCRAP METAL AND SALVAGE PIPE. ENERGY CREDITS FOR MORE EFFICIENT EQUIPMENT.

QUESTIONS?