JEAN-LUC STALON DEPUTY COUNTRY DIRECTOR (PROGRAMME)/ CO-CHAIR ERWG UNDP, PAKISTAN Strategic Early Recovery Action Plan – at a glance.

Slides:



Advertisements
Similar presentations
GP-DRR Parallel Meeting Disaster Preparedness M C. Oxley 4 th June 2007 Purpose: To stimulate substantive discussion on disaster preparedness in support.
Advertisements

Challenge of Bam Earthquake –
Global Gender and Climate Aliance CLIMATE CHANGE ADAPTATION Reducing the vulnerability to extreme events through prevention.
Human Development Recovery Needs Assessments (HRNA) United Nations Development Programme Bureau for Crisis Prevention & Recovery Bangkok, Thailand November.
Workshop on Sector Approaches in the Context of EU Integration Sarajevo, Bosnia and Herzegovina March 2010 Debriefing of the Workshop on Sector Approaches.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
Early Recovery (ER) Coordination Yemen.. What is Early Recovery “Is a multidimensional process of recovery, from a man made or natural disaster, that.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
Bosnia and Herzegovina: From food assistance to economic development strategies.
Trinity International Development Initiative Annual Development Research Week November 7 th, 2011 The Micro-foundations of Development: an Exploration.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
IOM Pakistan- One Room Shelter Program. The Program  The IOM ORS program is a shelter assistance program aimed at providing permanent shelter to the.
NATIONAL DISASTER RECOVERY FRAMEWORK INDIA ANNUAL CONFERENCE OF RELIEF COMISSIONERS VIGYAN BHAVAN, NEW DELHI 27 MAY 2014 MINISTRY OF HOME AFFAIRS, GOVERNMENT.
IPC Acute district level analysis of Badakhshan Region November 2014.
Resiliency of Public Services in Social Sectors Kenichi Yokoyama, ADB Country Director, Nepal.
Promoting child rights to end child poverty Plan International Typhoon Haiyan Emergency Response Phases November
Results Monitoring – Second Sudan Consortium Government of National Unity, Northern States, Three areas. 1. Establishing core capacity  Basic financial.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
H umanitarian R esponse in S indh Update as of: 9 March 2011.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Shelter Cluster Donors and Heads of Agencies Strategic Meeting 17:00, Nov 21 st, 2013.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This session will look at the impacts on response of climatic.
SOCIO-ECONOMIC IMPACT OF DROUGHT IN INDONESIA 2003 AND ITS HANDLING IN ACCORDANCE WITH POVERTY ALLEVIATION APPROACHES NATIONAL COORDINATING BOARD FOR.
South Asia Earthquake: Transition from Relief to Development Joint Executive Board of UNDP, UNFPA, UNICEF and WFP New York, 20 January 2006 Presented by:
7 th November SC Agenda – 7 th November 2012 Opening & Introductions Minutes of the meeting 3 rd October, including action.
World Vision Azerbaijan WV AZ office was opened in June 1994 in response to the humanitarian crisis as a result of military conflict with Armenia over.
The IASC Humanitarian Cluster Approach Angelika Planitz UNDP BCPR Developing Surge Capacity for Early Recovery March 2006.
Challenges and Opportunities in Post Disaster Interventions: the Role of Academic Institutions in Disaster Management Bahadar Nawab, PhD, Associate Professor.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Mapping and Gap Analysis Summarised Preliminary Results.
29 th August SC Agenda – 29 th Aug 2012 AGENDA Opening & Introductions Minutes of the meeting 18 th July, including action.
From relief to development Geneva, Transforming crisis into opportunities for sustainable development UN-HABITAT.
RS/GIS Techniques for Rehabilitation /Reconstruction.
The Early Recovery and Reconstruction Cluster in Pakistan - From saving lives to restoring livelihoods - Angelika Planitz UNDP BCPR Shelter Meeting May.
DEPARTMENT of AGRICULTURE, FORESTRY and FISHERIES Water Sector Leadership Group Meeting November 2009.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
Midterm Review of Housing and Shelter Sector 22 – 23 June 2009, Baghdad.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
The World Bank’s Role in Disaster Mitigation Financing the Risks of Natural Disasters June 3, 2003 Alcira Kreimer Manager, Disaster Management Facility.
NATIONAL INDABA 2015 Breakaway 3: Socio-economic impact of the lottery businesses on the South African economy.
28 th November SC Agenda – 28 nd November 2012 Opening & Introductions Minutes of the meeting 7 th November, including action.
United Nations Office for the Coordination of Humanitarian Affairs (OCHA) 4 May 2011.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
H umanitarian R esponse in P akistan Humanitarian Response in Pakistan 18 March 2011.
IDPs Hosting Areas and Functional Camps Beginning of Monsoon And Monsoon Contingency Plan.
Cluster 30 – 31 October 2013 Jakarta- Indonesia. 652,000 sqkm Indian Sub- continent (east); Central Asia (north), Middle East (west) Mostly mountainous.
The Story Line.. Building the resilience of the Indus Basin Irrigation System and agriculture so that it can be assured for generations to come.
Development Challenges in Indus Basin. Indus Basin Irrigated Areas.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
1 The UN Perspective UNAIDS Trinidad & Tobago Tenth PANCAP Annual General Meeting, November 2, 2010 The AIDS Response in the Post-Earthquake Reconstruction.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
WASH Cluster Update 7/12/11 WASH CLUSTER PAKISTAN.
2012 Monsoon Floods Assessment, Impact and Response Photo: OCHA.
ACCRA Who we are, what we do and where we work. Why should you be interested? How can you contribute?
Early Recovery Working Group for Flood Response in Pakistan 01 March, 2011.
PAKISTAN DEVELOPMENT FORUM 2010 RELIEF, EARLY RECOVERY AND DISASTER RISK REDUCTION BY LT GEN (R) NADEEM AHMED CHAIRMAN NDMA 14 NOVEMBER 2010.
HERWG Housing Early Recovery Working Group Updated Gap Analysis July 2011.
November 7th 2009, the combined effect of Hurricane IDA and low-pressure system off the Pacific Coast led to heavy rainfall (355mm in few hours) Severe.
A Presentation to the 2017 GEO Work Programme Symposium,
SC Agenda – 26th September 2012
Seki Hirano Senior Technical Advisor Shelter and Settlements
District Disaster Risk Reduction Managment Plan
Mapping and Gap Analysis
…and still actual for a post-2010 strategy!
Seasons, capacity and funding
Seasons, capacity and funding
Developing a shelter strategy
Yemen Towards early recovery
Presentation transcript:

JEAN-LUC STALON DEPUTY COUNTRY DIRECTOR (PROGRAMME)/ CO-CHAIR ERWG UNDP, PAKISTAN Strategic Early Recovery Action Plan – at a glance

Salient Features  Compiled around 8 priority sectors and 4 cross-cutting themes  Prepared by the Sector Working Groups and Thematic Groups and finalised by NDMA  Total Financial Gap US$ million  Being discussed with the GoP for finalisation

Prioritisation Criteria  Relevance to Early Recovery, precluding relief, reconstruction and development  Focus on the worst affected areas  Targeting the most vulnerable sections of the affected population  The physical and human implementation capacity available nationally  Practicability for implementation till the end of 2011

Comparison of the Quantum of Funding Gaps in Prioritised Sectors and Themes

Comparison between Flash Appeal and Strategic ER Action Plan

Indicative Province/ Region wise Break up of Financial Gap (US$ million)

Snapshot for Gap Analysis in Agriculture Aggregate Early Recovery Needs Total Intended Households: 3,087,000 Total funds needed: US$ 473 m Aggregate Early Recovery Response Households provided with Assistance: 293,000 Funds spent/ Committed/in hard pipeline: US$ 39.4 m Balochistan 105,400 HHs KP 682,700 HHs Sindh 1,317,000 HHs Punjab 773,000 HHs Balochistan 12,000 HHs KP 77,000 HHs Sindh 134,000 HHs Punjab 70,000 HHs Aggregate Gap Identification m households requiring US$ 473 m for full-fledged Early Recovery m households in urgent need of additional US$ 79 m Balochistan Beneficiaries (HHs): 15,872 Prioritised Cost: US$ 3 m KP Beneficiaries(HHs): 102,809 Prioritised Cost: US$ 19 m Sindh Beneficiaries (HHs): 198,329 Prioritised Cost: US$ 36 m Punjab Beneficiaries (HHs): 116,407 Prioritised Cost: US$ 21 m Challenges  Donors’ commitment at the early stages of Early Recovery is critical for the restoration of livelihoods  Some districts of Sindh and Balochistan remained inundated after the floods which made the efficiency for irrigated agriculture for the 2011 Kharif cropping season risky  Indebtedness in flood-affected areas, so income generation activities should be focused  Lack of long term institutional arrangements between line departments in flood affected provinces Response Strategy  First Priority Area: Five districts of Sindh and one of Balochistan still severely inundated by flood waters in November, 10 not able to plant a 2010/2011 Rabi crop  Second Priority Area: Districts of Kashmir, KP, Punjab and additional districts of Balochistan and Sindh not able to plan a 2010/2011 Rabi crop  Third Priority Area: Rehabilitation of FMWCs in all severely flood affected districts of Kashmir, KP, Punjab, Balochistan and Sindh  Fourth Priority Area: Livelihood restoration of small farmers in all severely affected districts of Kashmir, KP, Punjab, Balochistan and Sindh

Snapshot for Gap Analysis in Housing Aggregate Early Recovery Needs Total required Houses: 827,380* Total funds needed: US$ 636 million Aggregate Early Recovery Response Houses/Shelters provided: 351,980* Funds spent or in hard pipeline: US$ 271 million Balochistan 59,484 KP 116,866 Sindh 346,942 Punjab 301,211 Balochistan 40,683 KP 77,420 Sindh 109,620 Punjab 70,000 HHs Prioritised Aggregate Gap Identification 227,050 houses requiring additional US$ 175 million ( prioritised on the basis of location-based vulnerability) *Includes figures for GB and PAK Balochistan Houses: 11,500 Cost: US$ 8.8 million KP Houses: 18,572 Cost: US$ 14.3 million Sindh Houses: 111,736 Cost: US$ 85.9 million Punjab Houses: 85,243 Cost: US$ 65.6 million Challenges  The upcoming season can hinder the construction process and the monsoon rains can cause further destruction and disrupt reconstruction activities  To ensure that the commitments are actualized, that parity among the provinces in terms of commitment of the ORS is reached, and that not-registered activities also follow technical guidelines to enable “build back better”.  Local resources to rebuild are limited and knowledge on how to rebuild better against the risks of floods and earthquakes is not widely disseminated  To ensure all IDPs affected by the floods, living in temporary conditions such as camps and secondary settlements, return to their places of origin Response Strategy  Only completely destroyed (CD) houses are being targeted to provide support to people without permanent shelter  A household with a destroyed house shall be supported with an approx. 20 sq.m large One Room Shelter as a first Early Recovery core room, which will be later extended towards a house  The Transitional Shelters that do not comply with DRR shall not be promoted or supported.  Early Recovery shall be cost efficient by applying well known construction methods and the use of local materials. To promote ownership and to lower costs, beneficiaries shall participate according to their capacity. All material and labour shall be provided to extremely vulnerable households