Aleksandra RAKOWSKA Jozef LORENC Witold HOPPEL Poznań University of Technology Institute of Electrical Power Engineering DISTURBANCES IN POLISH 15 KV NETWORK.

Slides:



Advertisements
Similar presentations
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Advertisements

Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Managing Director, HVPD Ltd
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
Services System Design & CAD Drawings Full Installation to British and European Standards Property/Structural Assessments Annual Testing and Maintenance.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Electrical Power Systems
Distributed Power Systems ELCT 908
Ministry of Electricity & Energy Egyptian Electricity Holding Company
DET 310 UNDERGROUND CABLES
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
UMKC Senior SUBSTATION DESIGN TEAM
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
Interconnect Protection of Dispersed Generators
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
Roger C. Dugan Fellow, IEEE Review of the Impacts of Distributed Generation on Distribution Protection 2015 IEEE Rural Electric Power Conference Asheville,
Frankfurt (Germany), 6-9 June 2011 Gerhard Theil Technical University Vienna Institute of Energy Systems and Electric Drives
Transient Overvoltages
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
All rights reserved Surge Arrester.
Grounding, bonding, and ground fault currents
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Transformer Taking the ratio of the two equations
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Lesson 6 Voltage Do we need to MEASURE it? OR Do we need to DETECT it?
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
POWER HOUSE.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Electrical Engineering
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
SMJE 2103 Overvoltage, Electrical Insulation and Protection Devices.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Earthing in an electrical network ensures your safety.
ELECTRICAL INSTRUMENTS ( service and utilization )
GROUNDING SYSTEM OF HV/MV SUBSTATIONS FORMED THROUGH CABLE LINES WITH INSULATED METAL SHEATH.
6 Week industrial Training Presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Electricity is produced at the power station.
CHAPTER 6 SPECIAL TRANSFORMERS Electrical Machines.
Grounding And Safety Techniques Ms. Tahoora Qureshi, Asst. Professor
Interconnect Protection of Dispersed Generators
WELCOME TO ALL.
Electricity Distribution Network Design Training & Courses
Design of Electric Power Systems and Utilities
Sami Repo Tampere University of Technology FINLAND
Utilizing the ring operation mode of MV distribution feeders
Equipotential Grounding Procedures Protective Grounding Training
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
CORDLESS PHASING TESTER
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Exercise Session 11 Power systems.
Presentation transcript:

Aleksandra RAKOWSKA Jozef LORENC Witold HOPPEL Poznań University of Technology Institute of Electrical Power Engineering DISTURBANCES IN POLISH 15 KV NETWORK BY GROUND SHORT-CIRCUITS

Polish MV network contains mainly overhead lines but every year the percentage share of cables in electrical power network is increasing. This tendency can be observed especially for medium voltage system. MV power lines serviced by Utilities at the end of 2001: OHL km (76%) CL km (24%)

The percentage share of various types of cable insulation in the total length of MV cables in Polish network t o t a l l e n g t h [ % ] year

Relative failure rate for MV overhead and cable lines – data for all Utilities

Types of MV lines for 5 exemplary utilities Utility Percentage share of MV lines [%] OHL CL * Five Polish Utilities participate in survey on failures for cable ( km) and overhead ( km) lines

PAP 77% PE 10%10% XLPE 13%13% Shares of cable types installed in the MV network and cable failures for different type of insulation in 5 exemplary Utilities at the end of 2000

The first generation of design – taped screen

Utility Failure rate [%] Wu OHL Wu CL Percentage share of cable and overhead lines failure rates – total for 5 Utilities

The 90’s saw the admittance criteria, developed in the Institute of Electric Power Engineering of Poznan University of Technology become commonly operated. Large part of them are in analog technique (90’s), but for new substations - there are always digital admittance earth fault protection systems. With admittance earth fault protection systems some Utilities achieved that described protection systems allow to detect at least 95% of all earth faults.

The admittance earth fault protection systems can be divided with respect to criteria on which they rely: -excess admittance Y o >, -excess conductance G o >, -conductance-directional G ok, -susceptance-directional B ok, -comparative-admittance Y yo. Admitance criteria were described during CIRED Conference Birmingham - IEE Publication No 438, 1997

Near 80% of Polish HV/MV power substations work with neutral point, using Petersen coil (about 2000 substations). There is a need to assure proper conditions for good protection function – shunting of Petersen coil with resistor during protection operation. It is the most popular configuration. There are configurations with resistor switched on permanently, too. Transient switching on means current about A on primary winding – better service conditions for protection system. Resistor switched on permanently means also additional suppression of overvoltages (it is important especially for cable lines, with aged insulation or with first generation of extruded insulation). That’s why some Utilities use such configuration but it has to be said, that it lowers protection conditions in OH lines – risk of electric shock.

Based on service experiences – it was found that admittance earth fault protection are very effective for intermittent fault, too. In present time – for a new substation – all equipment suppliers are asked by Utilities to use the admittance earth fault protection (now foreign well-known companies have been asked to put also this element additionally to their systems).

Widely carried out research and construction works, having resulted in analogue and modern digital solutions, combined with providing professional training and expertise made admittance protections - a widely used protection system, implemented in nearly 10 thousand MV line fields in Polish distribution networks. Based on service experience achieved in the power substations we can conclude, that described protection systems allow to detect at least 95% of all earth faults.

Main aim: continuous supply of electrical energy for the CUSTOMERS