Virginia Radioactive Materials Program (RMP) Agreement State Transition Meetings.

Slides:



Advertisements
Similar presentations
HOME Program Tenant Based Rental Assistance
Advertisements

Radiological Health Advisory Board Meeting MAY 12, 2010.
Radiological Health Advisory Board Meeting November 9, 2011.
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Surface Mine Safety Regulation 25 PA Code Chapter 209.
Radiation Advisory Board November 10, Agenda  Call to order – Kerri Hall, M.D., M.S. Director Office of Epidemiology  Introduction of members.
What it takes to sign your contract Heather Kelley Contracts & Administrative Services Manager.
Compatibility Issues Regarding Agreement State Regulations for Portable Devices Containing RAM Sources Sean Chapel, President Presented at the 2006 Annual.
6/26/ Virtual Town Hall Meeting June 26, 2013 Announcements & Updates to Policy Changes Karen Wong, Director Public Safety Communications Office.
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
1 Department of Medical Assistance Services DD Waiver Provider Training Department of Medical Assistance Services Division.
ARPANSA Licence Holder Forum AFP College, Canberra 17 September 2010 Compliance Issues Common Non-Compliances Alex Kalaiziovski Senior Regulatory.
Written Directive “an authorized user’s written order for the administration of byproduct* material or radiation from by product material to a specific.
Presenters: Promoting Regulatory Excellence Sandra Whitley Ryals, Director Commonwealth of Virginia Department of Health Professions Impaired Practitioner.
1 NRC Export/Import Licensing Requirements and Procedures Jill Shepherd, Licensing Officer Export Controls and International Organizations Office of International.
LABORATORY RECORDS AND DOCUMENTATION Part III. Records in support of the requirements described in the 2003 RSM must be maintained in the laboratory.
SECURITY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS IN THE UNITED STATES.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Licensing of Nuclear Power Plants in Pakistan
REGULATORY INFRASTRUCTURE IN TURKIYE (Industrial Radiography)
Radiation Advisory Board July 10, 2006 State Emergency Operations Center.
Radiological Health Advisory Board Meeting May 25, 2011.
1 INDUSTRIAL RADIOGRAPHER CERTIFICATION Bridget D. Stephens Department of State Health Services August 2011.
NRC Operator Examination Panel Presentation Johnny Eads Paul Doyle Patrick Isaac Phillip Young.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Consideration of Michigan Pursuing an NRC Agreement A Discussion with Stakeholders March 2, 2007.
NSTS Current State of Things Cliff Harris, PhD NC Radioactive Materials Branch.
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
Radioactive Materials Inspections - What To Expect.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
Thank you for joining us today. Please ensure you also call into the conference call number at The pass code is We will begin shortly.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.10 Documents to be Submitted to the Regulatory Body.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste Gregory Suber, Branch Chief Environmental Protection & Performance Assessment.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Consideration of Michigan Pursuing an NRC Agreement A Discussion with Licensees and Stakeholders August 8, 2007.
An Introduction to Lodging Establishment Inspections.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
Jim Grice, Licensing Lead April 12, Topics of Discussion  Who we are  What we do  Recent Statutory and Regulatory Changes  Energy Fuels Uranium.
STRENGTHENING NATIONAL INFRASTRUCTURES FOR THE CONTROL OF RADIATION SOURCES RER/9/096 REGIONAL PLANNING MEETING ARMENIA ASHOT MNATSAKANYAN Head of Radiation.
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Radiation safety in Industrial Radiography Regulatory Infrastructure (ARSN) 25/06/2014 Presentation of Burkina Faso : M. Seydou SAWADOGO Head of Reglementory.
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 NC DOL Mine & Quarry Bureau Mine Safety & Health Training Revised 2010.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Final Rule on OTI Licenses - Docket NCBFAA Conference, Tucson AZ – April 19, 2016.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Utah Division of Radiation Control
Utah Division of Waste Management and Radiation Control
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
THE BAHAMAS RADIATION PROTECTION AND NUCLEAR SAFETY BILL, 2016
Updating the NRC’s Alternative Disposal Request Guidance Document
NRC Export and Import Licensing 10 CFR Part 110
NRC’s LLW Regulatory Program: Update of Emerging Issues
Overview of NRC Low-Level Waste Activities and Initiatives
Disability Services Agencies Briefing On HIPAA
Groundwater and Waste Management Committee November 9, 2016
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Research and Test Reactor Decommissioning Inspections
Julie Woosley, Division of Waste Management
TRTR Briefing September 2013
Module 5 RASP Regulations.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Virginia Radioactive Materials Program (RMP) Agreement State Transition Meetings

Introduction Welcome Welcome Purpose of meeting Purpose of meeting Facilities Facilities Completed by 12 pm? Completed by 12 pm?

Who is the RMP? The RMP is part of the Division of Radiological Health, which is part of the Office of Epidemiology. The RMP is part of the Division of Radiological Health, which is part of the Office of Epidemiology. The RMP consists of 4 radiation safety specialists, one administrative assistant and one director. The RMP consists of 4 radiation safety specialists, one administrative assistant and one director. Currently two specialists (Charles Coleman and VACANT) and the director (Mike Welling) work in the Richmond office, one specialist works out of home in Yorktown (Beth Schilke) and one specialist works out of home in Bristol (Kim Gilliam). Currently two specialists (Charles Coleman and VACANT) and the director (Mike Welling) work in the Richmond office, one specialist works out of home in Yorktown (Beth Schilke) and one specialist works out of home in Bristol (Kim Gilliam).

Contact Information Main line: , toll free: Main line: , toll free: Fax: Fax: Mike Welling: Mike Welling: Charles Coleman: Charles Coleman: Beth Schilke: Beth Schilke: Kim Gilliam: Kim Gilliam: Website: ogicalhealth/index.htm Website: ogicalhealth/index.htm ogicalhealth/index.htm ogicalhealth/index.htm Emergency (VEOC) Emergency (VEOC) ,

Status of Agreement State Application 12VAC5-481 finalized on 9/20/06 12VAC5-481 finalized on 9/20/06 12VAC5-481 revisions finalized on 6/12/08 12VAC5-481 revisions finalized on 6/12/08 The final application was delivered to the NRC on 6/16/08. The final application was delivered to the NRC on 6/16/08. 12VAC (IC and Fingerprinting) finalized on 10/3/08 12VAC (IC and Fingerprinting) finalized on 10/3/08 12VAC5-490 (Licensing fees) finalized on 3/4/09 12VAC5-490 (Licensing fees) finalized on 3/4/09 Completed documents: Completed documents: Regulatory Guides (VAREGs) Regulatory Guides (VAREGs) Applications Applications Licenses Licenses Procedures Procedures Forms Forms Agreement date is set for March 31, Agreement date is set for March 31, 2009.

12VAC5-481 Virginia Radiation Regulation Part I (General Provisions): Sections Part I (General Provisions): Sections Part III (Licensing): Sections Part III (Licensing): Sections Part IV (Standards for Protection Against Radiation): Sections Part IV (Standards for Protection Against Radiation): Sections Part V (Radiation Safety Requirements for Industrial Radiographic Operations): Sections Part V (Radiation Safety Requirements for Industrial Radiographic Operations): Sections Part VII (Use of Radionuclides in the Healing Arts): Sections Part VII (Use of Radionuclides in the Healing Arts): Sections

12VAC5-481 Virginia Radiation Regulation (cont) Part X (Notices, Instructions and Reports to Workers: Inspections): Sections Part X (Notices, Instructions and Reports to Workers: Inspections): Sections Part XII (Licensing and Radiation Safety Requirements for Irradiators): Sections Part XII (Licensing and Radiation Safety Requirements for Irradiators): Sections Part XIII (Transportation): Sections Part XIII (Transportation): Sections Part XIV (Well-Logging): Sections Part XIV (Well-Logging): Sections Part XVII (Schedules): Sections Part XVII (Schedules): Sections

VA Regs vs. NRC Regs There is virtually no difference between 12VAC and 10 CFR. Our regulations are written against a compatibility standard which the NRC reviews and comments on. There is virtually no difference between 12VAC and 10 CFR. Our regulations are written against a compatibility standard which the NRC reviews and comments on. Certain portions of 12VAC5-481 incorporate 10 CFR by reference, which means 10 CFR is the regulation licensed and inspected against. Certain portions of 12VAC5-481 incorporate 10 CFR by reference, which means 10 CFR is the regulation licensed and inspected against. IR Sections: IR Sections: Part III (Licensing) Part III (Licensing) Part IV (Standards) Part IV (Standards) Part VII (Medical) Part VII (Medical) Part XII (Irradiators) Part XII (Irradiators)

VA Regs vs. NRC Regs (cont) Agreement states have 3 years from a 10 CFR amendment to include into state regulations. Agreement states have 3 years from a 10 CFR amendment to include into state regulations. In 2011 we plan to amend 12VAC5-481 and replace the 10 CFR references with actual verbiage. In 2011 we plan to amend 12VAC5-481 and replace the 10 CFR references with actual verbiage. This revision will go through a public comment period. This revision will go through a public comment period. All revisions are on the Virginia Town Hall website at: m?BoardID=58 All revisions are on the Virginia Town Hall website at: m?BoardID=58 m?BoardID=58 m?BoardID=58

VA Regs vs. NRC Regs (cont) One major difference is with Increased Controls and Fingerprinting. Virginia has become the first state to put these requirements into their regulations instead of using a license condition or order. They can be found in 12VAC One major difference is with Increased Controls and Fingerprinting. Virginia has become the first state to put these requirements into their regulations instead of using a license condition or order. They can be found in 12VAC The NRC order and documents are no longer applicable. The NRC order and documents are no longer applicable.

12VAC5-490 FEES The fee schedule has been approved and will be effective on March 4, The fee schedule has been approved and will be effective on March 4, The fees are all less than NRCs, some more than others. The fees are all less than NRCs, some more than others. Billing: Billing: An initial bill will be sent out on April 1, This bill will cover the period from April 1, 2009 until the month and date of your license expiration. It will be prorated at our cost and the number of days. If you have specific questions you may contact me. An initial bill will be sent out on April 1, This bill will cover the period from April 1, 2009 until the month and date of your license expiration. It will be prorated at our cost and the number of days. If you have specific questions you may contact me. Another bill will be issued 60 days prior to the expiration month of your license. This will be your annual bill which covers the next calendar year. Another bill will be issued 60 days prior to the expiration month of your license. This will be your annual bill which covers the next calendar year. Some of you will be receiving a refund from the NRC. If you have questions on your NRC billing please contact Shirley Crutchfield at or Some of you will be receiving a refund from the NRC. If you have questions on your NRC billing please contact Shirley Crutchfield at or

12VAC5-490 FEES (cont) Examples of annual license fees Examples of annual license fees Medical $3750 Medical $3750 Industrial Radiography $3000 Industrial Radiography $3000 Portable Gauge $1000 Portable Gauge $1000 XRF $250 XRF $250 Academic $1000 Academic $1000 R&D $1500 R&D $1500 No fee for amendments $0 No fee for amendments $0

LICENSES On March 31, 2009 the NRC license and file will be delivered to the RMP. This will be approximately 380 licenses. On March 31, 2009 the NRC license and file will be delivered to the RMP. This will be approximately 380 licenses. On March 31, 2009 the NRC license and Virginia license become one license. On March 31, 2009 the NRC license and Virginia license become one license. A new license with a new license number will be issued during next amendment or renewal. The expiration date will be based upon the NRC license expiration date. A new license with a new license number will be issued during next amendment or renewal. The expiration date will be based upon the NRC license expiration date.

LICENSES (cont) NARM only licensees will also be issued a new Virginia license with a new license number. There are approximately 50 NARM only licenses. NARM only licensees will also be issued a new Virginia license with a new license number. There are approximately 50 NARM only licenses. Virginia has developed specific license type applications. Each application allows for committing to procedures in the regulatory guides. Virginia has developed specific license type applications. Each application allows for committing to procedures in the regulatory guides. A regulatory guide for each license type has been created based upon the NRC NUREGs. A regulatory guide for each license type has been created based upon the NRC NUREGs.

LICENSES (cont) Renewals will be good for 5 years. Renewals will be good for 5 years. Applications and reg guides will be available on our website. Applications and reg guides will be available on our website. The NRC has asked licensees with temporary jobsite authorization if they need to split the license and maintain an NRC and Virginia license. The NRC has asked licensees with temporary jobsite authorization if they need to split the license and maintain an NRC and Virginia license.

INSPECTIONS After March 31, 2009 inspections will be performed by RMP only. After March 31, 2009 inspections will be performed by RMP only. Inspections will follow the performance based process. Inspections will follow the performance based process. The inspection timeframe will follow the NRCs, for example 1 year for radiographers, 3 years for medical and 5 years for portable gauges. The inspection timeframe will follow the NRCs, for example 1 year for radiographers, 3 years for medical and 5 years for portable gauges.

INSPECTIONS Inspections will be unannounced for routine inspections. Inspections will be unannounced for routine inspections. Special inspections, i.e.; broad scope, incident response may be announced. Special inspections, i.e.; broad scope, incident response may be announced. There will be no inspection fees. There will be no inspection fees. The inspector may make recommendations during the inspection. The inspector may make recommendations during the inspection.

EMERGENCY RESPONSE Notifications required under 12VAC5-481 should be made to the RMP Richmond office at or during normal business hours. Notifications required under 12VAC5-481 should be made to the RMP Richmond office at or during normal business hours. Notifications after hours need to call the Virginia EOC at or Notifications after hours need to call the Virginia EOC at or Written reports shall be mailed to Radioactive Materials Program, 109 Governor Street, Room 730, Richmond, VA Written reports shall be mailed to Radioactive Materials Program, 109 Governor Street, Room 730, Richmond, VA

SOUTHEAST COMPACT COMMISSION The Southeast Compact sent out letters regarding waste disposal. The Southeast Compact sent out letters regarding waste disposal. The Southeast Compact has no jurisdiction over Virginia licensees. The Southeast Compact has no jurisdiction over Virginia licensees. The Southeast Compact has jurisdiction on how waste is disposed of in our compact. The Southeast Compact has jurisdiction on how waste is disposed of in our compact. Currently there is no waste disposal site in our compact since the Barnwell facility was closed to anyone not in the Mid-Atlantic compact. Currently there is no waste disposal site in our compact since the Barnwell facility was closed to anyone not in the Mid-Atlantic compact.

QUESTIONS? Please contact us anytime if you have any questions regarding the transition and future actions. Please contact us anytime if you have any questions regarding the transition and future actions.