Summary of MAP D-PHASE Strategy and Requirements MAP D-PHASE / Olympics Project Meeting 6 February 2006 Prepared by: Ron McTaggart-Cowan.

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss D-PHASE: Demonstration of Probabilistic Hydrological and.
Targeted observations and Observing System simulation Experiments Within THORPEX Yucheng Song IMSG/EMC/NCEP/NOAA Camp Springs, MD THORPEX Review, Feb 25.
CEOS Plenary Meeting Lucca, Italy November 8-9, 2011 CEOS Systems Engineering Office (SEO) Annual Report Brian Killough NASA Agenda Item #18.
Update on the Regional Modeling System NASA Roses Meeting April 13, 2007.
Participation in MAP D-PHASE / COPS Description of MAP D-PHASE project Implementation strategy Key relevant features of GEM v3.3.0 Overview of verification.
UQAM/EC Canadian Contribution to MAP D-PHASE R. McTaggart-Cowan, M. Desgagne, J. Cote, S. Gravel, C. Girard, A. Erfani, J. Milbrandt, C. Jones University.
MAP D-PHASE COPS Workshop, April 10, 2006 Mathias Rotach Chair MD-SC.
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of D-PHASE Marco Arpagaus 4 th COPS Workshop, Hohenheim,
Department of Meteorology and Geophysics University of Vienna since 1851 since 1365 TOWARDS AN ANALYSIS ENSEMBLE FOR NWP-MODEL VERIFICATION Manfred Dorninger,
1 st UNSTABLE Science Workshop April 2007 Science Question 3: Science Question 3: Numerical Weather Prediction Aspects of Forecasting Alberta Thunderstorms.
Exploitation of Ensemble Output (and other operationally cool stuff) at NCEP HPC Peter C. Manousos NCEP HPC Science & Operations Officer
4 th COPS Workshop, Hohenheim, 25 – 26 September 2006 Modeling and assimilation efforts at IPM in preparation of COPS Hans-Stefan Bauer, Matthias Grzeschik,
Chapter 13 – Weather Analysis and Forecasting. The National Weather Service The National Weather Service (NWS) is responsible for forecasts several times.
RAINEX Real time Communications Overview NCAR, NOAA, Rest of the World Operational Products Satellite Imagery Model Products Surface Observations RECON.
EGU 2011 TIGGE, TIGGE LAM and the GIFS T. Paccagnella (1), D. Richardson (2), D. Schuster(3), R. Swinbank (4), Z. Toth (3), S.
COSMO GM2013.E.Astakhova,D.Alferov,A.Montani,etal The COSMO-based ensemble systems for the Sochi 2014 Winter Olympic Games: representation and use of EPS.
Earth Science Division National Aeronautics and Space Administration 18 January 2007 Paper 5A.4: Slide 1 American Meteorological Society 21 st Conference.
Name, Surname, Position Logo(s) Weather monitoring and forecasting over eastern Attica (Greece) in the frame of FLIRE project Vassiliki Kotroni (1), Konstantinos.
The WWRP Forecast Demonstration Project MAP D-PHASE on flood forecasting in the Alps Authors: Arpagaus, Dorninger, Hegg, Montani, Ranzi, Rotach Presentation:
A.Montani; Eurorisk-Preview COSMO meeting, Zurich, September 2005 PREVIEW in some words (PREVention, Information and Early Warning) A project funded.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Data mining in the joint D- PHASE and COPS archive Mathias.
Sea Ice Modelling and Data Assimilation at CIS Tom Carrieres.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games” General Meeting 2011.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
GLFE Status Meeting April 11-12, Presentation topics Deployment status Data quality control Data distribution NCEP meeting AirDat display work Icing.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
NHC Activities, Plans, and Needs HFIP Diagnostics Workshop August 10, 2012 NHC Team: David Zelinsky, James Franklin, Wallace Hogsett, Ed Rappaport, Richard.
THORPEX Interactive Grand Global Ensemble (TIGGE) China Meteorological Administration TIGGE-WG meeting, Boulder, June Progress on TIGGE Archive Center.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss MAP D-PHASE – a WWRP Forecast Demonstration Project Marco.
© GEO Secretariat Overall Concept What? B08FDP Forecast Demonstration Project (Nowcasting) B08RDP Research & Development Project (Ensemble Prediction Systems)
START-08/pre-HIPPO FIELD CATALOG AND DATA MANAGEMENT Steve Williams NCAR Earth Observing Laboratory (EOL) Boulder, Colorado START-08/pre-HIPPO Planning.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
ENSEMBLES RT4/RT5 Joint Meeting Paris, February 2005 Overview of the WP5.3 Activities Partners: ECMWF, METO/HC, MeteoSchweiz, KNMI, IfM, CNRM, UREAD/CGAM,
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
2006/05/15 Thanh NGO-DUC Page 1 Lab meeting Contents MM5-MSE (MM5 - Mainland South East Asia) 72-hour forecast –MM5 –Couple to TRIP GSWP2 storage GRACE.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Quantitative precipitation forecast in the Alps Verification.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
ALADIN & LACE recent and ongoing Development on LAMEPS Yong Wang ZAMG, Austria With contribution from Bellus, Hagel, Horanyi, Ivatek-Sahdan, Kann, Kertesz,
Production of a multi-model, convective- scale superensemble over western Europe as part of the SESAR project EMS Annual Conference, Sept. 13 th, 2013.
A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
5 th COPS Workshop, Hohenheim, March 2007 Real-time assimilation efforts during COPS Hans-Stefan Bauer, Matthias Grzeschik, Florian Zus, Volker Wulfmeyer,
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Philippe Steiner, MeteoSwiss COSMO General Meeting September 22th, 2005 Plans of MeteoSwiss for next year.
MAP D-PHASE Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alps June – November 2007.
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
Verification of operational seasonal forecasts at RA-VI Regional Climate Center South East European Virtual Climate Change Centre Goran Pejanović Marija.
Status of soil moisture production at DWD Interim ELDAS Data coordination meeting Martin Lange, Bodo Ritter, Reinhold Schrodin.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Plans of MeteoSwiss for 2007/ th September 2007.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
The application of Models-3 in national policy Samantha Baker Air and Environment Quality Division, Defra.
TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek, Manuel Fuentes (ECMWF)
WATER RESOURCES DEPARTMENT
D-PHASE Operations Period (DOP): 1 June – 30 November 2007
Multi-model seasonal forecast Operational systems
Winter storm forecast at 1-12 h range
Verification of COSMO-LEPS and coupling with a hydrologic model
Regional WIGOS Centre Tokyo
MOGREPS developments and TIGGE
Activities of WG7 Chiara Marsigli.
Presentation transcript:

Summary of MAP D-PHASE Strategy and Requirements MAP D-PHASE / Olympics Project Meeting 6 February 2006 Prepared by: Ron McTaggart-Cowan

Outline ● Summary of 1 st MAP D-PHASE Science Meeting (November 2006, Vienna, Austria) ● Deliverables for MAP D-PHASE – Test Period (Feb 2007) – DOP (1 June - 30 November 2007) ● Status of EC contribution to MAP D-PHASE ● Relationship to Olympics Project ● Status of Olympics Project

Summary of MAP D-PHASE ● MAP Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the alpine region ● A Forecast Demonstration Project of the WWRP ● Organized by MeteoSwiss with collaboration from many European centers and universities ● Coordinates with COPS IOP ● Overlap with E-TReC 2007 MAP D-PHASE

Summary of MAP D-PHASE MAP D-PHASE and COPS output domains for 2007 DOP MAP D-PHASE

Summary of MAP D-PHASE ● Both deterministic and low/high resolution ensembles will be run by various centers: – Ensembles: MOGREPS (UKMet), INM Multi- model (Spain), COSMO-LEPS (ECMWF), MICRO-PEPS (DWD) – Deteministic: GEM (Canada), MOLOCH (Italy), AROME (France), MM5 (Universities) ● Numerous hydrological models will be run either coupled or in offline mode MAP D-PHASE

Summary of MAP D-PHASE ● Preliminary verification strategies: – (real time) subjective evaluation by MAP D- PHASE forecasters from MeteoSwiss – (offline) from data archive by researchers in Austria using the Vienna enhanced resolution analysis (VERA) technique ● The key predictors will be related to flood forecasting, so the focus in on QPF MAP D-PHASE

Deliverables MAP D-PHASE (Test Period, 26 Feb – 2 March 2007) ● High resolution models (mesh size 1-3 km)run between 1 and 4 times daily ● Outputs are requested hourly for 41 surface fields, and a total of 134 upper air fields (mix of model level and pressure outputs) ● Gridded GRIB data will be interpolated to the D-PHASE domain and uploaded to the University of Hamburg ● Generated images will be sent to the Operations Centre MAP D-PHASE

Deliverables MAP D-PHASE (DOP, 1 June – 30 November 2007) ● In addition to the D-PHASE domain fields, all 41 surface fields, and a total of 134 upper air fields are requested at 15 minute intervals for the COPS domain from June to August ● Gridded GRIB data will be interpolated to the D-PHASE and COPS domains and uploaded to the University of Hamburg ● Generated images will be sent to the Operations Centre MAP D-PHASE

Status of EC Contribution ● Intention for twice-daily nested (10, 2.5 km) runs over the Test Period and DOP have been presented to the MAP collaborators ● Preliminary domains have been constructed ● Work has begun on postprocessing: – interpolation to final grids and GRIB generation – GrADS image generation ● No automation or operational consideration has been made MAP D-PHASE

Status of EC Contribution Timeline for tasks involved with completing EC contribution to MAP D-PHASE project. Green – started; Yellow – in planning stage; Red – not planned MAP D-PHASE

Status of EC Contribution ● Specific items that need to be discussed: – Model domain and configuration – Software requirements (GRIB, GrADS) – Storage requirements (temporary / long term) – User account / special account / operational – Host machine for real-time runs – Verification / model improvement strategy (identify collaborators) MAP D-PHASE

Relationship to Olympics Project ● Beijing 2008 is a WWRP Forecast Demonstration Project (B08FDP) ● Both the status of the Beijing planning and the Australian support (based on Sydney 2000 experience) were presented in Vienna ● Both are end-to-end systems focused on high impact events using deterministic and ensemble approaches ● Offers of support were received from several European centres Olympics Project

Status of the Olympics Project ? Olympics Project

Next Steps for Olympics Project ● Define the current status of the project ● Establish a rough timeline ● Meet with involved / interested parties to finalize timeline ● Begin development ● [Based on the Australian experience, we should have a basic system ready for operational testing sometime in 2008] Olympics Project

Additional Information ● MAP D-PHASE Links: – MeteoSwiss MAP homepage doc/dphase/dphase_info.htm doc/dphase/dphase_info.htm – EC Contribution Presentation