Research Phase, Indiana 811, Initial Notice, Verification Deborah Porter Project Engineer/Utility Coordinator Clark Dietz, Inc.

Slides:



Advertisements
Similar presentations
Utility As-Built Information Value Awareness
Advertisements

Greater Chicago Damage Prevention Council REQUESTING PERMITS Excavator Responsibilities (Contractual and Municipal) A permit is required for any excavation.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
3-1 Utility Conflict Identification and Management Lesson 3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Coordinating with Project Manager Cindy Kowalski, PMP Utility Coordinator, Parsons December 2013.
Highway Utility Engineer, INDOT
Greenfield District Utility/RR Engineer, INDOT
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
GANTT CHARTS & SCHEDULES Chris Hammond, P.E. Transportation Department Manager, United Consulting August 27, 2014.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of.
Scenic Highways The CPUC’s Role in Granting Deviations to PU Code §320 March 18th, 2008 Jack Leutza California Public Utilities Commission.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
Coordinating with Project Manager Cindy Kowalski, PMP Utility Coordinator, Parsons November 19, 2013.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Senior Utility Engineer, INDOT
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
STATE FISCAL STABILIZATION FUND 2011 Updates February 1, 2011.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Kentucky Transportation Cabinet
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Highway Utility Engineer, INDOT
When a Locate is needed South Dakota Law Chapter 49-7A requires that anyone who engages in any type of excavation provide advance notice of at least 48.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
LPA – Utility Coordination Natalie Parks, P.E. American Structurepoint, Inc. December 19, 2013.
Indiana’s Access to Public Records Act Heather Willis Neal Indiana Public Access Counselor Presented to Indiana State Department of Health August 21, 2008.
GEODETIC CONTROL MARK TYPES. Call Before You Dig Avoid Careless Damage and Accidents Digging can be dangerous and costly without knowing where underground.
UC Berkeley Extension Classroom Canvas Training
Indiana’s Public Access Laws Heather Willis Neal Indiana Public Access Counselor Indiana Association of Cities and Towns Red Flag and Sunshine Workshop.
Contractors Equipment Insurance A brief overview.
Coordinating with Project Managers Cassie Reiter, P.E., ENV SP Utility Coordinator/Project Manager CMT Engineers and Consultants June 2016.
105 IAC 13, UAP, and 10 State Lynette K. Werner, P.E. Highway Utilities & Railroad Engineer, INDOT June 21, 2016.
Construction Review LaVon M. Marshall Greenfield District Utility/RR Engineer, INDOT June 22, 2016.
Indiana Utility Regulatory Commission Electronic Filing System “EFS” Tutorial.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
A New Paradigm for Utility Coordination Kenny Franklin VP of SUE Development Blood Hound.
Establishing, Building, Organizing and Maintaining a CAN Network.
How To Read MS811 Locate Request Tickets
Pre-Construction Services
Utility Permitting Overview
Training for New District Test Coordinators
Chapter 3 Managing the Information Systems Project
Medicaid 101 Chiropractic Services
Disability Services Agencies Briefing On HIPAA
105 IAC 13, UAP.
Significant Procedural Changes to the One-Call System
Research Phase, Indiana 811, Initial Notice, Verification
Agreements & Cost Estimates
DRAFT - FOR REVIEW PURPOSES ONLY
Aschalew Aberra, P.E. Senior Utilities Engineer INDOT June 14, 2017
Driving Indiana’s Economic Growth
Construction Review.
Work Plan Development.
Understanding the Right-of-Way Process
A Paradigm for Utility Coordination
105 Indiana Administrative Code Article 13
Utility Coordination: An Overview
Project Manager / Utility Liaison
Agreements & Cost Estimates
Presentation transcript:

Research Phase, Indiana 811, Initial Notice, Verification Deborah Porter Project Engineer/Utility Coordinator Clark Dietz, Inc.

Utility Research Know how to get started: Review the project scope and intent Review the project schedule Know the UC process 105 IAC 13 Indiana Design Manual (IDM) Chapter 104 Utility Coordination Utility Accommodation Policy (UAP) INDOT Utility Coordination page

Utility Research Create the UC Schedule: INDOT’s SPMS contains most information needed to create the schedule and start the Research INDOT PM or Utility Oversight Agent Reference post information How does the schedule align with the project intent?

Utility Research

What is the product? After each Research step, record: Utility companies’ names, or no data found Name of person recording the information Date when information obtained Name of person supplying the information At conclusion of Research phase, summarize all information and submit to Designer and Oversight Agent

Utility Research Specific link to Authorized Rep ure/UtilityAddressList.htm ure/UtilityAddressList.htm Username and password needed – use the link on the page to send an to request the information Research Examples

Utility Research Permit Search

Utility Research

Design Ticket

Utility Research

Utility Initial Notice

Know who receives the Notice Include a map of the project area If no response within 30 days, follow up A project contact should be assigned

Utility Initial Notice

Utility Verification Verification Includes Obtain accurate utility locations Potential for SUE Septic systems and wells

Utility Verification Face to Face meeting Discuss complications and types of facilities Discuss design alternatives Obtain accurate utility locations Avoid utility impacts whenever feasible Ballpark estimate for relocation Establish reimbursable positions Discuss work in contract relocations

Utility Verification

Indiana 811 Indiana “Dig” Law IC IUPPS is the association An operator that has underground facilities located in Indiana must become a member of the association

Indiana 811 Locate flags must be maintained during construction Notice must be received at least 2 full working days, but not more than 20 calendar days prior to work Separate requests made if: Within incorporated area, every 1500’ In unincorporated area, every 2500’

Indiana 811 Locate markings Know your colors for different utilities Excavation responsibilities