October 21, 2014 Ontario Ministry of Transportation Rob Tardif Ontario Update on Border Traffic for FHWA Planning Initiative TBWG - Trade and Traffic Data.

Slides:



Advertisements
Similar presentations
Session 6: What do I include in my PM 2.5 conformity analysis? FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
Advertisements

November Regional Perspective on the Border Niagara International Transportation Technology Coalition.
Beyond the Border Action Plan Border Infrastructure Investment Plan (BIIP) 1.
Trends in Border Crossing Volumes Steven Beningo – USDOT/RITA/BTS Presentation to the Transportation Border Working Group Niagara Falls, Ontario.
FHWA at the Border David Franklin U.S – Canadian Border Coordinator Office of Planning.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Qu é bec-New York Regional Workshop Report Ministère des Transports du Québec / New York State Dept. of Transportation TBWG Montréal, Québec October 25,
Subarea Model Development – Integration of Travel Demand across Geographical, Temporal and Modeling Frameworks Naveen Juvva AECOM.
Transportation Border Working Group Border Infrastructure update Ministère des Transports du Québec October 27 th Québec.
Border Architecture US/Mexico Presented to Border Partnership Working Group 11 January 2006.
Saint Lucia Public Transportation Pilot Study John Rosendo Kim Ianelli Sarah Corey & Thomas DeSisto.
RITA/BTS International Data Improvements Steven Beningo International Transportation Specialist USDOT/RITA/BTS Telephone Presentation to the Texas Border.
Edward R. Stollof December 14-15, 2010 Stakeholder Workshop to Solicit Feedback on LED Issues and Potential Solutions with Ice and Snow Build-Up on LED.
Beyond the Border Action Plan Border Infrastructure Investment Plan (BIIP)
US/CANADA RAIL BORDER OPERATIONS TRANSPORTATION BORDER WORKING GROUP WASHINGTON, DC APRIL 30, 2004 Jane Bachner Federal Railroad Administration US/CANADA.
Cross Border Rail Passenger Service Transportation Border Working Group Buffalo, New York – April 8, 2014.
Freight Performance Measures Crystal Jones FHWA Office of Freight Management and Operations.
TBWG Spring 2011 Meeting Minneapolis, Mn EASTERN BORDER TRANSPORTATION COALITION UPDATE.
– Toronto Alicia Nolan – Co-Chair - FHWA Allan Wilson – Co-Chair – Transport Canada Border Infrastructure Coordination Subcommittee (BICSC)
Overview of Project Main objective of study is to assess the impact of delay at border crossings and resulting changes in user benefits and broad macroeconomic.
Network Appalachia Access to Global Opportunity in the 21 st Century.
U.S. Department of Transportation Federal Highway Administration Transport Transports Canada Canada Transportation Border Working Group New York State.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
FHWA TRAVELER ANALYSIS FRAMEWORK Bus Trip Tables May 9, 2013 Don Vary, CDM Smith Krishnan Viswanathan, CDM Smith.
Multimodal Study on Freight Transportation in Québec Transportation Border Working Group Spring 2014 Meeting Buffalo, NY April 8, 2014 Claude Sirois.
Border Information Flow Architecture Pilot Project Funding Program Transportation Border Working Group, Québec October 27, 2010.
FHWA Reorganization Update Program Performance Management Standing Committee on Performance Management Meeting Detroit, MI October 14, 2011 Peter Stephanos.
FHWA Office of Operations Research and Development and American Association of State Highway and Transportation Officials (AASHTO) AASHTO National Connected.
A State Perspective on Infrastructure Challenges and Opportunities Presentation to The Council of State Governments Eastern Regional Conference Halifax,
TBWG Toronto, Ontario November 18, 2008
Transportation Border Working Group Rob Tardif Ontario Ministry of Transportation Action Plan Working Sessions: Border Data Action Plan Working Sessions:
PRECLEARANCE Progress Update 1. Preclearance at 8 major Canadian airports Pre-inspection in the rail and marine environments in British Columbia PRECLEARANCE.
Border Data Warehouse. Vancouver, BC Bellingham, WA The Cascade Gateway.
Status of Trusted-traveler & Trusted-shipper programs in the Pacific Northwest NC-BSI Workshop Bellevue, WA February 26, 2009 David Davidson, Associate.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
GPS Leader™ In-vehicle Data Collection Ben Pierce By.
Beyond the Border Action Plan Border Wait Time Measurement Technology.
Southwestern Ontario Border Wait Time Project Update Mike Barnet, P.Eng Intelligent Transportation Systems Program Ministry of Transportation of Ontario.
October April 13, 2010 – Québec City Travis Black, Co-Chair – U.S. Federal Highway Administration Daniel McGregor, Co-Chair – Transport Canada Border Infrastructure.
UPDATE TBWG MEETING – OTTAWA Kris Wisniewski November 7, 2012.
TBWG Plenary STATUS OF GSA NORTHERN BORDER PROJECTS Bill Wells Land Ports of Entry SME October 27, 2010.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
Washington D.C. Update Roger Petzold, P.E. Team Leader Border & Corridor Team Office of Planning.
April 8, 2014 Ontario Ministry of Transportation Rob Tardif Ontario Update on Border Traffic for FHWA Planning Initiative TBWG - Trade and Traffic Data.
Public-Private Partnerships at POEs Spring 2014 Transportation Border Working Group 1.
Presented to: TBWG Fall Plenary, November 2, 2011 By: Marc Aubin, Highway and Border Policy Cross-Border Passenger Bus Services Study.
BUSINESS SENSITIVE 1 Network Assignment of Highway Truck Traffic in FAF3 Maks Alam, PE Research Leader Battelle.
USDOT’s IntelliDrive Program Smart Roadside Initiative – How it Fits.
Visions of Transportation and Urban Form in the GTA Bruce McCuaig Assistant Deputy Minister Ministry of Transportation.
2013 Fall TBWG CBP Washington Updates. Field Operations Facilities Program Management Office 2 TBWG: CBP Washington Updates Agenda Historic NB Appropriations.
National Modeling TRB Transportation Planning Applications Conference May 5, 2013.
EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING THE POTHOLES – PAVING THE WAY TBWG, Niagara Falls October 24, 2006 EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING.
Safety-Based Deployment Assistance for Location of V2I Applications Carol Tan, FHWA and Kim Eccles, VHB Traffic Records Forum, 2015.
The Scottish Ferries Review Judith Ainsley Small Isles October 2009.
Technology Subcommittee November Topical Outline Technology Subcommittee Technology Subcommittee RoleRole Work PlanWork Plan ActivitiesActivities.
El Paso–Juarez Border Integration Salvador González-Ayala El Paso MPO / IMIP / ICRC.
Border Technology Update BORDER INFORMATION FLOW ARCHITECTURE WORKING GROUP Presented to Transportation Border Working Group (TBWG) 29 April 03 Washington,
TBWG – Ottawa Update Quebec City, October 28, 2010 Ted Mackay, Transport Canada.
April 28, 2009 – Chicago Alicia Nolan – Co-Chair - FHWA Daniel McGregor – Co-Chair – Transport Canada Border Infrastructure Coordination Subcommittee.
Transportation Border Working Group - Vancouver October 21 and 22, 2014 CBSA Infrastructure Project Update.
OFFICIAL PLAN 5-YEAR REVIEW & TAKE ACTION FOR SUSTAINABLE HURON.
October 22, 2013 Ontario Ministry of Transportation Transportation Planning Branch Systems Analysis and Forecasting Office Rob Tardif Ontario Update on.
ITS Session TBWG, Boston, April 13-14, 2010
STATUS OF GSA NORTHERN BORDER PROJECTS
Multi-state Corridor Pooled Fund Program
Border Crossing Best Practices Guidebook
BORDER WAIT TIME WORKING GROUP Technology Evaluation and Deployment
Beyond the Border Action Plan
Chicago to Council Bluffs-Omaha
Training timeline Train the trainer RFC 1st round RFC 3rd round
Presentation transcript:

October 21, 2014 Ontario Ministry of Transportation Rob Tardif Ontario Update on Border Traffic for FHWA Planning Initiative TBWG - Trade and Traffic Data Session

FHWA partnership with Ontario to develop passenger and commercial vehicle O-D databases to support infrastructure planning Ontario Ministry of Transportation products under development (2013 to 2015): Commercial and Passenger intercept surveys at Ontario’s 14 border crossings with NY, MI, MN Document time series travel trends (2000, 2006, 2013/2015) Prepare “User Guide” to effectively maximize OD survey results Prepare “How To Guide” to replicate best practices for U.S. deployment of OD survey Provide case studies to demonstrate the range of analysis potential and support model development Project Scope 2

Commercial Vehicle Survey Workshop Spring 2015, location TBD Additional workshop dates and locations TBD Model Development, base year OD Trip Tables & Traffic Assignment Undertake final round of passenger vehicle surveys in Summer 2015 New York/Ontario St. Lawrence (3 crossings) Massena, Ogdensburg, Alexandria Bay Michigan/Ontario (Detroit and Port Huron, 3 crossings) Integrate with border surveys conducted in Niagara and Northern Ontario Passenger Survey Workshops, Spring 2016 Next Steps 3

/ Border Passenger Surveys Completed 42,000 passenger vehicle intercept surveys from 8 crossings In 2014, anticipate 30,000 from 6 crossings 4