Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.

Slides:



Advertisements
Similar presentations
Module 10 Submit.
Advertisements

Page 1 Inter-Company Cash Application By MIS Department.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
No (clock stops) Yes No Yes RXQ.2.4Models RXQ Determination of Initial Credit Limit – Process Flow Applicant Creditor (delays would add time to clock)
Document #06-4E Enrollment & Switching Process (via Uniform Electronic Transaction) Customer Supplier Distribution Company Customer authorizes enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Application Complete? ( ) No (clock stops) Yes No Yes RXQ.2.4Models RXQ Determination of Initial Credit Limit – Process Flow Applicant Creditor.
How many hours have passed from 6:00 P.M. to 9:00 P.M.? C. 3 hours B. 6 hoursA. 9 hours.
HIV Drug Resistance Training
CREATE & SUBMIT eEEMPR USING DEP ONLINE PORTAL
Child Health Reporting System (CHRS) How to Submit VHSS Data
606 CMR 14.00: Background Record Checks What you need to know!
Michigan Electronic Grants System Plus
Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.
0 - 0.
1 Reverse a Journal Find an existing journal and reverse it in either: A original period B a different period.
UTICA COLLEGE Web Time Entry Users Guide SCT 2010 For more information contact Caren Summers, Payroll Coordinator or
STUDENT RECORDS Distribution Services Supervisor Victor Parra.
FLIK International at RHQ proudly introduces 1 Available here:
SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
MBS ROAD MAP Mike Chalk, MBS Manager Phil Goble, CIO.
March 27, 2014 How to get started RMA Portal MOTOROLA SOLUTIONS 1.
Still Camera Workshop SFU Operation & Maintenance Fraser Library.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
Automated Dispatch System (ADW)
“The Honeywell Web-based Corrective Action Solution”
ECHO Test Track Pro User’s Guide
Operations to Serve You 05/17/ The Service Desk Provides an Announcement Page? The Service Desk houses a library of SOLUTIONS that are available.
SQ40i (Individual Sequin Device) Check List SQ40i (individual Sequin Device) Sunstar Precision Co.,Ltd.
Twin City Swim Conference
CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
Creating Requisitions University Of Western Ontario.
Welcome to Instructions and tips for the online application process 1 June 2012.
Brief introduction to Primary Care (GP) SOAR users Last updated: 24 th August 2012.
How to sign up for unite! To begin your registration, go to Employers and Volunteers, and click “Join Now” If you wish.
Dispatch Web (DW) Logging an Absence. 1. Logging in RCSD.ca Staff Quick links SRB web.
Online Room Sign Up (RSU) Tutorial
New Rubrics? Create Assignment and Project Templates and Send the Assignments in Tk20 Must do before you can use updated rubrics Theresa Dorn.
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
TIDE Presentation Florida Standards Assessments 1 FSA Regional Trainings Updated 02/09/15.
WebHopper, Student Timesheets, and You Students use WebHopper to submit timesheets to you electronically for approval. You will use WebHopper to approve.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
HOW TO GET STARTED RMA PORTAL
Last Updated: 05/10/ CSG Release 10 - Effective 04/22/2002.
Version 4.0 NOTE: For a more detailed description of each process step within these flows, please refer to the accompanying Inter-Service Provider LNP.
Last Updated: 07/01/ CSG Release 11 - Effective 07/01/2002.
Session #23 Hands On NSLDS for Beginners Valerie Sherrer & Andrea Wise.
Health-e Claims August © ENS Inc, an INGENIX company. 2 Introduction  To begin, you need your assigned ENS user ID, password, and organization.
User creates problem ticket on Web tool? User has Problem End user requests asst. via , phone, in person. No ticket created Helpdesk staff decides.
Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.
Meeting Deliverables Update on talk with vendor – 5’ Review call flow process – 20 ‘ – Finalize hours issues and next steps – Work to finalize call flows.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Mismatch Is end-user porting all telephone numbers? New Service Provider notifies Old Service Provider of change using Local Service Request (LSR) Old.
Mismatch NNSP sends porting LSR to ONSP to port number. End-user Contact End-user agrees to change to New Service Provider (NLSP) NLSP obtains end-user.
Open your Browser and Navigate to Your browser will redirect you to and open the.
MDS Service System. Service System Capabilities Identify products eligible for service – and whether on contract Interfaces to MDS Serial / Warranty Modules.
Automated Control System User Guide. Logging In After you have obtained your User ID number you can log on to the ACS website by typing in the address.
© 2012 CenturyLink, Inc. All Rights Reserved. Not to be distributed or reproduced by anyone other than CenturyLink entities and CenturyLink Channel Alliance.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
MTG CEMR/MEDIACC Repair System Improvements
With rosa sanchez pdr coordinator
Final Semester Grades.
October 2014 CenturyLink Design Service Repair Billing & Repair Billing Dispute Process Highlights.
How Can I Create A Gmail Account
Offer Process in PageUp
Final End of Year Grades
Health-e Claims July 2007.
Orange ASP Training Module
Presentation transcript:

Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially Mechanized 6 5 No Selection of Coordination or time specific boxes on LSR Select Coordination Box on LSR Time Specific? Yes No Select time specific box & indicate time 3 Yes No 3 B B 9 2 AT&T Complete LSR Attachment 2 Exhibit D Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops Page 9 FL 6/16/00 2 Order Type? AT&T Mechanized or Partially Mechanized AT&T Non-Mechanized Send LSR to BST via electronic interface Send LSR to BST via fax BST does system check to verify facility records BST makes physical Inspection of Facilities Records Inadequate/ unavailable? Yes No C 1 1 4

AT&T OK? BST Notify AT&T via Clarification AT&T Corrects & Issues Supp. 5 No C AT&T BST return FOC to AT&T AT&T Receives FOC Is due time different than request? Note Order Log No Yes Notify End User of due date & time Acceptable? D AT&T Update ASR Attachment 2 Exhibit D Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops Page 10 FL 6/16/00 4

D Yes No AT&T Perform internal steps to ready for cut Negotiate/request new due date & time 6 BST Places Loop Assignment info on service order BST sends service Order to CPG 7 BST Wires COSMOS Frame Wired By Plant Test Date? E E BST Test for dial tone BST Notifies AT&T via jeopardy 7 No Yes Good? Yes 8 No AT&T BST Refer no dial tone to AT&T AT&T Receives No Dial Tone Call AT&T Perform Internal Test F Page11 FL 6/16/00 Attachment 2 Exhibit D Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops

F Fixed? Yes END NoAT&T Dispatch Technician Problem fixed? Yes No END AT&T Notify BST to dispatch Technician AT&T BST to Dispatch Technician AT&T Dispatch Technician to meet BST G AT&T Fix by Due Date? Yes No END AT&T 9 Fix Problem AT&T Notifies BS & Issues SUPP BST Problem AT&T Problem Page 12 FL 6/16/00 Attachment 2 Exhibit D Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops

G AT&T Yes No AT&T Tech meets BST Tech & jointly isolate & repair trouble BST 48 hours call to AT&T BST verifies dial tone & ANI on day of cut as a precaution/ safety check OK? BST Turns up Loop as requested/agreed by AT&T BST Contact AT&T & issues jeopardy AT&T/BST negotiates new date & new time 10 H 8 H AT&T OK? No AT&T Performs Internal verification tests Yes AT&T END BST Tech calls AT&T after turn-up AT&T notifies BST of Acceptance BST Closes all associated BST Orders AT&T notifies BST of problem & Non-Acceptance BST Investigates & issues trouble ticket & resolves 11 AT&T AT&T Verify Problem Resolved Resolved? No Yes Page 13 FL 6/16/00 12 Attachment 2 Exhibit D Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops BST Tech meets AT&T Tech & jointly isolate & repair trouble