Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.

Slides:



Advertisements
Similar presentations
Please login now.
Advertisements

Project Management 6e..
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Perfect Pty Ltd Project Administrator Overview of Software.
Project Cost Management Estimation Budget Cost Control
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Defining the Project Chapter 4.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
What is a project? Project Management Institute definition
Chapter 5: Project Scope Management
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Project Management Basics
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
Project Scope Management
Planning. SDLC Planning Analysis Design Implementation.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Project Management and Scheduling
Project Management – The Project Charter
EMBA Project Scope Management J. S. Chou, P.E., PhD.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management Process Overview
IT Project Management Cheng Li, Ph.D. August 2003.
Project Management Donald Hsu, Ph.D. Dominican College
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Lecture 4 Title: The Scope Management Plan
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
FotoGazmic Software Project Plan Senior Project: CS 425 Spring 2003.
Project Life Cycle.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Develop Project Charter
Lecture 12 Managing Project Control and Closure. Project Control The process that allows monitoring and measurement of project progress and directing.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Degree and Graduation Seminar Integration Management
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
Team-Based Development ISYS321 Managing the Information Systems Project.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Class 5 – Planning IT Projects
Project Management PTM721S
Systems Analysis and Design in a Changing World, 4th Edition
Project Management Processes
Planning Phase: Project Control and Deliverables
Engineering Processes
Project Management Processes
Engineering Processes
Project Integration Management
Project Integration Management
Configuration Management
Project Overview.
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin Mills Santosh Chintakayala Project Hosting Start Page http://cs632g3t3.bu-pm.com/login.aspx Login: bupma Password: terrier Project Management Support Site http://code.google.com/p/bupma-v2/

Management Plan Software Project Management Plan Project Organization IEEE Standard for Software Project Management Plans (Std 1058.1-1987, reaffirmed in 1998) 1.1 Overview 1.2 Project deliverables 1.3 Reference materials-deliverables hosting Project Organization 2.0 Project model 2.1 Project model phase relationship diagram 2.2 Organizational structure-Skill sets review and roles \ responsibilities assignments Management Processes 3.1 WBS generated with MS Project 2007 3.3 Risk management 3.5 Staff plan

Work Packages, Schedules and Budget Resource requirements 5.1 Human resources 5.1 Material and services resources 5.1 Financial resources Budget requirements 5.2 PERT-top down WBS budget and resource allocation 5.3 Gantt chart 5.4 Meeting schedule and resources Project success criteria 6.2 Milestones 6.3 Approval process – QA & testing

Additional Components Initial project requirements 7.1 Updated project requirements Change request management 7.2 Documenting process Project plan approvals Plan project post mortem review components 9.1 Peer review 9.2 Stakeholder review 9.3 Client review rationale

Quality Plan Product Quality Testing Objective Testing scope Making sure that our site is user friendly and intuitive to use with no defects. Ensuring that specifications meet criteria established in the BUPMA Software Project Management Plan. Testing Objective To establish proper site navigation through logins, tabs, and all website functionality. Testing scope User Interface Design Santosh Chintakayala Database Design Kevin Mills Technique used for Testing For each business/functional requirement, a test scenario was created and documented on the Test Checklist. Sections including requirements/functionality are: 1.0 Basic Overview Information 2.0 Test Analysis / Common Options 3.0 Landing Page 4.0 Home Screen 5.0 About Screen 6.0 Events Screen 7.0 Jobs Section 8.0 Events Screen 9.0 Resources Section 10.0 Weblog Section 11.0 Administrative Page 12.0 Final Acceptance Summary and Conclusions 5

Start Page Login: bupma Password: terrier http://cs632g3t3. bu-pm

Subscribe to List Form

Main Home Page

Events page

Library Page

Weblog page

Quality Plan Primary Focus of Testing Login Access Registered User Login and Admin Login Tabs Home, About, Events, Library, Resources, Jobs, Weblog. Test Checklist document was created to document: Guideline for Test Results Evaluation Report Demonstrated Site Capabilities: Comparing the actual site to the requirements. System Deficiencies: Individual statement on each deficiency discovered. Recommended Improvements: Any recommendations on performance or procedures. System Acceptance: System ready for release. Issue tracking Google Code was used to log and track Issues. (http://code.google.com/p/bupma-v2/) Type (Enhancement / Task) Status (New / Accepted / Started) Owner Summary of Issue 12

Change Control Project Changes Did not have any requirement changes from initial plan. Planned to use the Change Request Form: Current Condition Proposed Justification Cost / Time Impacts

Change Control Scope Creep Schedule Pressure Never Encountered Re-evaluated resources on schedule from loss of team member Documents always on time, with milestones met

Questions? Thank You