STEP for Electronics Boeing Space & Communications Group Gregory L. Smith ISTPED Workshop July 17th, 2000.

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

ISO Implementation and Processor Validation Keith Hunten, P.E. Lockheed Martin Aeronautics April, 2002 ESA-NASA Workshop
Software Configuration Management
DCS Architecture Bob Krzaczek. Key Design Requirement Distilled from the DCS Mission statement and the results of the Conceptual Design Review (June 1999):
CAD/CAM Design Process and the role of CAD. Design Process Engineering and manufacturing together form largest single economic activity of western civilization.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Supplement 02CASE Tools1 Supplement 02 - Case Tools And Franchise Colleges By MANSHA NAWAZ.
Product Lifecycle Management: Meeting the Needs of Collaboration
Configuration Management
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Computer Aided Design, Manufacturing & Measurement Integration August Coordinate Measurement System Committee Albuquerque, New Mexico Richey-McIvor-Sandwith.
Automating your Business Processes Using Oracle Workflow Therron Hofsetz Logical Apps, Inc.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
Automotive Warranty System 1.  Challenges faced by CIO  Our Solution  Our Methodology  Cloud Based Architecture  Clientele  Highly customizable.
Effective Methods for Software and Systems Integration
Complete and Integrated Lifecycle Management. Challenges 1.
Copyright PDES, Inc. R ISO/IEC Capabilities for Power Electronics Roanoke, Virginia July 19, 2000 Thomas R. Thurman Rockwell Collins.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Standards for CAD Data Exchange. The CAD data is of four types Shape Non shape Design Manufacturing data.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
R NASA STEP for Aerospace Workshop at Jet Propulsion Laboratory January 27, 2000 Thomas Thurman Rockwell Collins Inc. AP 210 Foundations for Electrical-Mechanical.
16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 1 ECSS Working Group “Exchange of Product Data” and related work Hans Peter de Koning (ESA/ESTEC/TOS-MCV)
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
material assembled from the web pages at
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Configuration Management (CM)
Copyright PDES, Inc. R ISO-IEC Overview for Supply Chain Support NASA STEP for Aerospace Workshop at Jet Propulsion Laboratory, Pasadena,
1 Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Proposed PLCS TC Organization and Functional Responsibilities.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
© 2009 Rockwell Collins, Inc. All rights reserved. From Paper Based Analysis to Model Based Analysis: Applications of AP 210 at Rockwell Collins April.
Notes of Rational Related cyt. 2 Outline 3 Capturing business requirements using use cases Practical principles  Find the right boundaries for your.
Introduction to Design Engineer Analysis
STEP Tools, Inc. 216 River Street / Troy, New York Voice: (518) / Fax: (518) The STEP.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
The principles of an object oriented software development process Week 04 1.
Copyright 2002 Prentice-Hall, Inc. Chapter 4 Automated Tools for Systems Development 4.1 Modern Systems Analysis and Design.
STEP and OMG Standards Interoperability Doug Cheney Senior Software Engineer International TechneGroup Incorporated.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
R NASA STEP for Aerospace Workshop at Jet Propulsion Laboratory January 27, 2000 Thomas Thurman Rockwell Collins Inc. PDES Inc. Electro-mechanical Pilot.
SNOMED CT Vendor Introduction 27 th October :30 (CET) Implementation Special Interest Group Tom Seabury IHTSDO.
22 Nov'08Slide 1 Concadd 2D Draughting-Detailing Concadd (A decade of innovation)‏
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
AN OVERVIEW OF COMPUTER AIDED ENGINEERING/DESIGN (CAE/D) SYSTEMS AND DATA ROBERT E. FULTON PROFESSOR OF MECHANICAL ENGINEERING DIRECTOR ATLANTA ELECTRONIC.
1 Copyright © 2008, Oracle. All rights reserved. Repository Basics.
York Laboratory Information Systems Restructuring Proposal IEM 5303 Term Paper Fall 2000 Chris M. Forth Senior Project Engineer York International.
The New Generation of CAD Tools
Software Configuration Management
Software Project Configuration Management
Theorem CADverter for STEP AP242
Identify the Risk of Not Doing BA
Computer Aided Software Engineering (CASE)
Modern Systems Analysis and Design Third Edition
Object Oriented Analysis and Design
Chapter 13 Quality Management
Dave Hurlburt March 27, 2018 Design True DFx Dave Hurlburt March 27, 2018.
SESSION 5: Cadence / EMA / Moog Workshop: Derived Outputs, Legacy ECAD Tool Conversion, and Constraint Manager for OrCAD Thu, Oct 18, :00 AM -
Metadata The metadata contains
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Modern Systems Analysis and Design Third Edition
Computer-Aided Design (CAD)
Presentation transcript:

STEP for Electronics Boeing Space & Communications Group Gregory L. Smith ISTPED Workshop July 17th, 2000

7/17/2000G.L.Smith, ISTPED Workshop Agenda AP 210 Development Past AP 210 Activities Present AP 210 Activities Future AP 210 Activities Questions & Answers

7/17/2000G.L.Smith, ISTPED Workshop Agenda

7/17/2000G.L.Smith, ISTPED Workshop Manufacturing Future AP 210 To Durability Analysis AP 210 To Producibility Analysis Mentor To/From AP 210 Design Mechanical AP 210 To/From Mechanical AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical Mentor To/From AP 210 Design Boeing - STEP for Electronics AP 210 Manufacturing Future AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical Mentor To/From AP 210 Design Manufacturing Future

7/17/2000G.L.Smith, ISTPED Workshop AP 210 Manufacturing Future Mentor To/From AP 210 Design AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical Boeing - STEP for Electronics AP 210 Boeing has been working on AP 210 since its inception. AP 210 development and pre-pilot activities.

7/17/2000G.L.Smith, ISTPED Workshop STEP AP 210 Activities Timeline US Comments Due 3/19/99 TIGER Contract 9/95 New Work Item Working Draft Committee Draft Draft International Standard International Standard 2000 DIS Ballot Begins 12/1/98 DIS Ballot Ends 4/26/99 PreAmp Contract 3/92 Internal Pilots 3/97 AP 210 Development Activities 4/91 Boeing related AP 210 activities ISO related AP 210 activities Not to any scale!

7/17/2000G.L.Smith, ISTPED Workshop Sample PWA from 777

7/17/2000G.L.Smith, ISTPED Workshop Sample LRU from 777

7/17/2000G.L.Smith, ISTPED Workshop Printed Wiring Assemblies *Figures derived from data collected from PWA industry leaders. Size of PWA activity: Number of new PWA designs/year: approximately 120 –Each design has three (3) stages: prototype unit, hardware qualification unit and unit delivered to customer. PWA design duration: weeks* PWA rework duration: weeks* PWA rework cycle cost: ~$100,000* Number of electronics items delivered/year: ~45,000 (Irving TX facility Only) Design & Manufacture within Boeing

7/17/2000G.L.Smith, ISTPED Workshop Electronics Formats / Standards

7/17/2000G.L.Smith, ISTPED Workshop STEP * A (Very) Rough Comparison of Standards EDIF GenCAM IPC-350 VHDL Gerber IDF IGES PDD PDM * Including: AP 202 Drawing AP 203 Mechanical AP 209 Analysis AP 210 PWA/PWB AP 211 Test AP 212 Schematics AP 220 Mfg Info/Plan

7/17/2000G.L.Smith, ISTPED Workshop Technology Physical Component Placement Bare Board Design Layout templates Layers non-planar, conductive & non-conductive Material product Geometrically Bounded 2-D Wireframe with Topology Surfaces Advanced BREP Solids Constructive Solid Geometry Part Functionality Analysis Support Shape 2D, 3D Package Material Product Properties Configuration Mgmt Identification Authority Effectivity Control Requirement Traceability Analytical Model Document References Product Structure/ Connectivity Functional Packaged Fabrication Design Rules Product Design Rules Requirements Design Allocation Constraints Interface Rules Geometric Dimensioning and Tolerancing Geometry Design Control AP 210 Electrical Assembly Interconnect and Packaging Design

7/17/2000G.L.Smith, ISTPED Workshop PreAmp Pre Competitive Advanced Manufacturing Processes Contract Sponsor: NIST Advanced Technology Program. Timeframe: Mar Sep Members: –Rockwell Martin Marietta Boeing ADL –HughesStep Tools, Inc. DigitalBattelle –SCRA Results: –Software framework for defining and executing rules using AP 210 and AP 220 as the source of data. –Facility for defining manufacturing resources. –Mentor to AP 210 Translator. –Initial examination and analysis of AP 210. Standards Used: CD version of AP 210 WD version of AP 220

7/17/2000G.L.Smith, ISTPED Workshop TIGER Team Integrated - Electronic Response Contract Sponsor: DARPA program. Timeframe: Sep Mar Members: –Boeing (Seattle & Irving) Georgia Tech ITI –Holaday Circuits, Inc. SCRAADL Results: –Enhanced translator, rules definition and execution facilities. –Negotiation facility. –Integration with thermal analysis tools. –Web access to tools. –Methodology for rules execution (administration, data extraction, data analysis). –Encoded numerous rules to test system concepts. Standards Used: DIS WD1 version of AP 210

7/17/2000G.L.Smith, ISTPED Workshop Manufacturing Future AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical Boeing - STEP for Electronics AP 210 Mentor To/From AP 210 Design Boeing (working w/ Delco) is supporting the development of AP 210 translation. Mentor To/From AP 210

7/17/2000G.L.Smith, ISTPED Workshop Mentor to AP 210 Translator Objectives: –Achieve a seamless data flow within Printed Wiring Board and Assembly (PWB/PWA) Define/Produce processes. –Deploy a vendor independent mechanism to share PWB/PWA data within Boeing, with customers and suppliers. Approach: –Support development of the STEP AP 210 standard. –Acquire a commercial bi-directional STEP DIS AP 210 translator from International TechneGroup Incorporated (ITI): - Version A (Oct 98)- Version B (Jun 99) - Pilot (Dec 99)- Production (1Q 00) –Work with Define/Produce centers to pilot the AP 210 translator. –Involve other companies as appropriate: Delphi Delco Electronics

7/17/2000G.L.Smith, ISTPED Workshop Mentor to AP 210 Translator Data Applications Legend Board Station Application Mentor Graphics Design Tools Electrical Data Librarian Application STEP AP 210 Translator Board Station Procedural Interface (BPI) ITI Mentor Graphics ITI Translator Environment AP 210 Data AP 210 Config AP 210 Log Translator Architecture

7/17/2000G.L.Smith, ISTPED Workshop Mechanical AP 210 To/From Mechanical AP 210 To Producibility Analysis Manufacturing Future Boeing - STEP for Electronics AP 210 Mentor To/From AP 210 Design AP 210 To Durability Analysis Boeing is presently deploying AP 210 on several internal projects: Durability Analysis

7/17/2000G.L.Smith, ISTPED Workshop Durability Analysis Objectives: –Integrate the electrical PWA design and durability analysis processes to improve quality and reduce flow time. –Enable designers to introduce structural members such as ribs/stiffeners and/or covers during PWA layout for design optimization. –Develop methods for predicting fatigue life due to vibration and acoustic pressure field environments. Approach: –Use STEP AP 210 standard to transfer PWA design geometry and material definition. –Develop capabilities to assess durability of printed wiring assembly (PWA) by physics-of-failure method. –Use and modify public domain codes validated with COTS. –Provide an integrated process on the designers desktop.

7/17/2000G.L.Smith, ISTPED Workshop Durability Analysis Durability Analysis Process for Environment Modeling Low-cycle fatigue High-cycle fatigue Acoustic pressure Start CAD PWA design Create AP 210 STEP files Merge AP 210 STEP files for core design* Create analysis files Mesh properties Manufacturing parameters Mechanical constraints Perform FEA thermal/structural Thermal environment Parts libraries Structural environment Add parts Modify design Crack initiation life prediction User defined * Core design represents a PWA comprised of a metallic plate used to conduct heat Done Multi-domain stress analysis

7/17/2000G.L.Smith, ISTPED Workshop Thermal Analysis Vibration Analysis Mode shape Failure Assessment Durability Analysis A metric to identify a failure mechanism and predict time to failure Provides assessment of vendor PWAs Reduces cost of products by concurrent engineering Integrated Tools

7/17/2000G.L.Smith, ISTPED Workshop Durability Analysis Benefits: –Error reductions, elimination of duplicate data entry. –Improved quality and flow time, reduced design iterations due to errors. –Concurrent engineering by allowing flow of data between electrical and analytical modules. Targeted Applications: –Numerous Boeing projects Technology Available: –June 1999 Expected Savings When Implemented on Target Applications: –3000 engineering hours per year* *Estimate only - Boeing is not to be contractually held to this number!

7/17/2000G.L.Smith, ISTPED Workshop AP 210 To Durability Analysis Manufacturing Future Mechanical AP 210 To/From Mechanical Boeing - STEP for Electronics AP 210 Mentor To/From AP 210 Design AP 210 To Producibility Analysis Boeing is presently Deploying AP 210 on several internal projects: Producibility Analysis

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Objectives: –Deliver a new PWA producibility review process that enables review team member interaction with on-line tools and eliminates slow paper flow times. –Improve product quality and cost by reducing first-design release rejections through identification of producibility issues earlier in the PWA development cycle. Approach: –Apply team from Define, Produce, and Information Systems groups. –Implement Manufacturing Resource Editor, Producibility Rules Facility, Negotiation Facility, and new producibility process. Validate process change results.

7/17/2000G.L.Smith, ISTPED Workshop Producibility Schematic Data Applications Legend Express to Rose AP 210 Express AP 210 Rose Schema AP 210 PowerModel Schema Express to PowerModel (Schema Converter) Performed when AP 210 Schema is Updated AP 210 Data Mentor to AP 210 Translator STEP to PowerModel (Data Converter) AP 210 PowerModel Data Producibility Analysis Results Performed when AP 210 Data is Updated

7/17/2000G.L.Smith, ISTPED Workshop What Makes PWA Designs Producible? Can be built with available: –Manufacturing equipment –Processes –Components Requires a minimum of: –Process steps –Second assembly steps Can be easily: –Tested –Installed –Repaired –Recycled/Destroyed

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis The PWA producibility review process: –Requires input from many organizations: Materials & Processes Manufacturing In-Circuit Test Design Integrated Process Team Process Engineering –Requires anywhere from 1 to 13 days to complete. –Is dependent on one or two key people. –Can generate inconsistent results. The Producibility Guidelines document is used as the reference to determine PWA producibility.

7/17/2000G.L.Smith, ISTPED Workshop Data Process Invocation Mechanism Legend Rule Results IssueTracker Producibility Guidelines Manufacturing Resources Analyze Design Submitted Design Start Analysis Design Designer Work on Design IPT Issues Producibility Analysis New Process Data Flow

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Producibility Guidelines 5. Test the New Rule. 4. Write Producibility Rule/Guideline Rule to Examine Facts and Attributes and Determine if Requirements are NOT Being Met. 3. Write Data Extraction Rule to Extract Required Data from the STEP Representation and Store as Temporary Facts and Attributes (if data is not previously available). 1. Select a Guideline or Rule. 2. Identify the Required Data. 6. Modify as Required. 7. Release the Rule. Rule Development Methodology

Producibility Analysis Rule Summary Spreadsheet

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Issue Tracker

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Issue Tracker

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Issue Tracker

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Issue Tracker

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis

7/17/2000G.L.Smith, ISTPED Workshop Prototype (3/98 - 9/98) Target: Irving Developmental AP 210 Translator Limited Issue Tracker capability Limited rule set Completed 9/30 Evaluation (12/98 - 6/99) Target: EP ITI Version A AP 210 Translator Enhanced Issue Tracker capability Enhanced rule set Initiated 12/11 Production (6/99 - ) Target: Boeing ITI Version B AP 210 Translator Full Issue Tracker capability Full rule set Extend into: Testability Analysis Design Analysis Library Verification Producibility Analysis Implementation Phases

7/17/2000G.L.Smith, ISTPED Workshop Producibility Analysis Benefits: –Less rework –Fewer design iterations –Reduced burden on producibility reviewers Targeted Application: –Electronics Products organization –Irving & El Paso, TX PWA Facilities Technology Available: –October 1998 Expected Savings When Implemented on Target Application: –1500 to 3000 hours per year* *Estimate only - Boeing is not to be contractually held to this number!

7/17/2000G.L.Smith, ISTPED Workshop AP 210 To Durability Analysis AP 210 To Producibility Analysis Manufacturing Future Boeing - STEP for Electronics AP 210 Mentor To/From AP 210 Design Mechanical AP 210 To/From Mechanical Boeing is presently deploying AP 210 on several internal projects: Electrical Mechanical Interface

7/17/2000G.L.Smith, ISTPED Workshop Electrical Mechanical Interface Objectives: –Integrate electrical PWA design with mechanical enclosure design to improve quality and reduce flow time. –Implement a bi-directional exchange of electrical (electronic) and mechanical product and packaging information for PWAs using the STEP standard. –Establish data exchange repository and configuration management process. Approach: –Replace the existing proprietary exchange format (IDF) with a broader international standard (STEP) to allow the exchange of additional information. –Migrate mechanical and electrical converters to commercial translators. –Provide prototype to support electronic and mechanical products developed in Electronic Products design centers.

7/17/2000G.L.Smith, ISTPED Workshop Exchange of data is performed using IGES or/and IDF. IDF is company proprietary. Requirements Circuit Board Assembly Product Package ECAD MCAD Product Dumb data Board Station Outlines Board Picture Isometric Intergraph Mentor EMS DA IGES 2D IDF Smart data Mentor Version 8 Design Process Electrical Mechanical Interface

7/17/2000G.L.Smith, ISTPED Workshop Electrical Mechanical Interface Exchange format is vendor proprietary. Existing problems with IDF translators - replacing complex object with primitives, loss of data intelligence, font changes. The transfer of data back to Electrical system from Mechanical system is incomplete. No association between systems - a change on one system is not reflected in the other. No mechanism to provide configuration management. Concerns with Current Process

7/17/2000G.L.Smith, ISTPED Workshop Exchange of data independent of process or tools. Frequency controlled by unique Business needs. Exchange of intelligent data. Requirements Circuit Board Assembly Product Package ECAD MCAD Quality Product STEP Data for Exchange AP 210 AP 203/ AP 210 Proposed Design Process Electrical Mechanical Interface

7/17/2000G.L.Smith, ISTPED Workshop Mechanical Systems Electrical Systems CATIA Application AP 203 cc 2/6 Dassault (IBM) Unigraphics Application Unigraphics Solutions (Delco/Rockwell) AP 203 cc 2/6 Visula Application Zuken-Redac (Rockwell) IDF to AP 203 cc 2 Allegro Application Cadence (IBM) IDF to AP 203 cc 2 Board Station Application Mentor Graphics (Boeing/Delco) AP 210 to AP 203 cc 2 Solid Edge Application AP 203 cc 6 Unigraphics Solutions (Boeing) AP 203 cc 6 - Advanced B-Rep (AP 210 cc 17) AP 203 cc 2 - Geometrically Bounded Wireframe Models, Surface Models or Both (AP 210 cc 15) Data Transfer Between Systems Electrical Mechanical Interface Conformance challengesWorking with minor concerns

7/17/2000G.L.Smith, ISTPED Workshop Data Applications Legend Data Transfer Architecture via STEP Proposed Final Architecture Electrical Mechanical Interface Solid Edge Application Unigraphics Solutions Mechanical Data Board Station Application Mentor Graphics Electrical Data Object Repository Object Request Broker Config. Mgt. via PDM AP 210 Data STEP (210) Translator STEP (210) Translator

7/17/2000G.L.Smith, ISTPED Workshop Electrical Mechanical Interface Benefits: –Error reductions, elimination of duplicate data entry. –Improved quality and flow time, reduce design iterations due to errors. –Concurrent Engineering by allowing flow of data between electrical/mechanical systems. Targeted Application: –Numerous Boeing projects Technology Available: –June 1999 Expected Savings When Implemented on Target Application: –2000 engineering hours per year* *Estimate only - Boeing is not to be contractually held to this number!

7/17/2000G.L.Smith, ISTPED Workshop Manufacturing Future AP 210 To Durability Analysis AP 210 To Producibility Analysis Mentor To/From AP 210 Design Mechanical AP 210 To/From Mechanical Boeing - STEP for Electronics AP 210 Boeing is planning its future architecture around AP 210!

7/17/2000G.L.Smith, ISTPED Workshop AP 210 Modularization Supporting PDES, Inc. STEP modularization activity. Developing Statement of Work / Direction. Identifying useful areas for the module creation supporting: –Customers Design Fabrication –Other standards IDF GenCAM EDIF others as required –Ongoing internal projects Supporting interoperability with other APs.

7/17/2000G.L.Smith, ISTPED Workshop AP 210 PWA Viewer

7/17/2000G.L.Smith, ISTPED Workshop PWA/PWB Inwork Design Repository Provide seamless electrical and mechanical I/F. Provide vendor independence. Provide intelligence for cross domain analysis. Provide platform independence. MCAD Application AP 210 MCAD Translator ECAD Translator ECAD Application Manufacturing Applications (Producibility) AP 220 Manufac- turing Domain Specific Analysis AP 210Data Extraction Classes x & y AP 203 AP 210 Corba STEP Data Access Interface Cross Domain Analysis AP xxxData Extraction Entities & Attributes AP 210 AP 203 AP 220 AP202 AP 210 Schema (Express) AP 203 Schema (Express) AP 220 Schema (Express) AP 202 Schema (Express) Database Schema Generator Corba STEP Data Access Interface MCAD Database AP 203 AP 210 MCAD Translator ECAD Translator ECAD Database Manufacturing Resources AP 220 Resource Capture Analysis, Design, Requirements Criteria AP xxx Criteria Capture Object Oriented or Object Relational Database Management System PDM

7/17/2000G.L.Smith, ISTPED Workshop Implementation Data Acquisition Challenges: –Acquiring complete PWA/PWB data in the form of STEP AP 210 (many translators): CD Translator (PreAmp - 96) DIS WD1 Translator (TIGER - 97) DIS Translators, (ITI) –Expanding STEP data for end users. –Identifying what STEP data is missing. –Extracting specific STEP data. Performance Challenges: –Loading hundreds of thousands of objects into object systems (STEP AP 210 data). Challenges

7/17/2000G.L.Smith, ISTPED Workshop Implementation Cultural Challenges: –Educating the community about AP 210 and its advantages. –Enhancing the current process of human inspection with process automation analysis and information capture. Configuration Challenges: –Provide a configuration and management environment to create and modify rules. –Providing a intuitive methodology for individuals to write producibility rules: Administration rules Data Extraction/Verification rules Data Analysis rules Challenges

7/17/2000G.L.Smith, ISTPED Workshop Summary AP 210 Manufacturing Future Mentor To/From AP 210 Design AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical Boeing is supporting the development of AP 210 translation: Mentor to/from AP 210 Boeing has been working on AP 210 since its inception. Boeing is presently deploying AP 210 on several projects: Durability Analysis Producibility Analysis Electrical Mechanical Interface AP 210 Viewer Boeing has invested extensively (time and money) in AP 210 development and implementation. Boeing is planning its future architecture around AP 210. STEP for Electronics is available and a viable standard for Product Data Exchange!

7/17/2000G.L.Smith, ISTPED Workshop Questions & Answers AP 210 Manufacturing Future Mentor To/From AP 210 Design AP 210 To Durability Analysis AP 210 To Producibility Analysis Mechanical AP 210 To/From Mechanical