CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Images: Araquém Alcântara CONFESSIONS OF A CDM PROJECT DEVELOPER Futuro para o meio ambiente Surrey University 16th December 2010.
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Canada Climate Change Development Fund (CCCDF) Projects in support of national communications Satender Singh Department of Foreign Affairs and International.
CDM Implementation Experiences of Bhutan Sonam Yangley Director National Environment Commission.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
| Regional Workshop on CDM and NAMAs for Latin America and the Caribbean Roles and Structure of Designated National Authorities (DNAs) Bogota, Colombia.
Agricultural Technology Transfer Society (ATTA) Local Stake-Holder’s Consultation Meeting on CLEAN DEVELOPMENT MECHANISM PROJECTS For PoA Production of.
Climate Change and CDM in Thailand
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
SESSION 3: Climate Change Financing Opportunities.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
An International Fund for Greenhouse Gas Emissions from Ships INTERTANKO ISTEC & Executive Committees Dubai, January 2009 Christian BREINHOLT Director.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
3 – Clean Development Mechanism Introduction to Climate Change Wim Maaskant BGP Engineers – The Netherlands
Clean Development Mechanism June 23 th 2008Lehman Lee & Xu’s Beijing office Aldo Settimio Boni de Nobili Associate.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Regional workshop on Climate Change in south and southeast asia on 7-9 Aug 2006, Dhaka, Bangladesh Climate Change issues in Laos Immala INTHABOUALY Department.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT PRESENTATION TO ENVIRONMENTAL INITIATIVES AND UNFCCC IMPLEMENTATION IN PAKISTAN.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
CDM Development in Thailand Capacity Development for the Clean Development Mechanism Office of Natural Resources & Environmental Policy and Planning (ONEP)
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
BACKGROUND TO THE CDM By Philip M. Gwage. Structure of Presentation Background  Climate Change Convention  Kyoto Protocol The Clean Development Mechanism.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
Umwelt und Infrastruktur Regional Energy Advisory Platform – East Africa 1, November 19th, 2008 The Clean Development Mechanism (CDM) in Eastern Africa.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Introduction to the Japan Fund for the Joint Crediting Mechanism (JFJCM) 6 September 2016 Asia Pacific Carbon Forum 2016 Side Event in Jeju Island, Republic.
CDM –Functional Overview
Conference of Parties to United Nations Framework Convention for Climate Change (UNFCCC): 21st Session (COP21) H.N.K.T.Dulani Assistant Director Climate.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Development of a Solar Water Heater NAMA Concept Belize
REReP regional meeting on “Energy and climate” in South Eastern Europe
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG

December 2004 : Tunisia established their Designated National Authority (DNA) for approving CDM Projects. December 2005 : The Ministry of Industry, Energy and Small and Medium Enterprises established a CDM Task Force which aims at promoting the structuring of CDM projects in the energy and industry sectors. 107,600 millions teCO2 Since the Kyoto Protocol came into force on February 16, 2005, the Clean Development Mechanism (CDM) recorded an edifying growth on the international scene, enabling thus developing countries, notably Tunisia, to participate in climate change control by undertaking projects aimed at reducing greenhouse gases (GHG), which projects also contribute to sustainable development in countries where they are implemented.

1.SIDI DAOUD 34 MW 2.BIZERTE 190 MW Project Designation Number of projects Emissions avoided per annum (CO2 Kt) Emissions avoided over the duration of the credit (CO2 Kt) ENERGY EFFICIENCY ENERGY SUBSTITUTION OTHER ENERGY PROJECTS INDUSTRIAL PROCESSES RENEWABLE ENERGIES Solar Projects Biomass & Biofuel Projects Wind Power Projects

The Executive Board Institutional Players involved in the CDM The Designated National Authority (DNA): set up by the host country, upon ratification of the Protocol Designated Operational Entities (DOEs) Supervises the establishment of the CDM Registers CDM projects Issue URCEs. Determines sustainable development criteria specific to the country Controls the of project approval process. Check and validate CDM projects Inform the public.

The baseline scenario for emissions (« business as usual » scenario) which builds on a methodology approved by the Executive Board. A monitoring plan for the emissions of the project developed based on methodologies that are to be approved by the Executive Board. A project environmental impact study. The feedbacks compiled during the consultation of local stakeholders held by the project developer. Step 1: Developing the CDM Project Document The developer of a CDM project is to submit a Project Design Document (PDD) to the Executive Board for approval and it must contain: Step 2: Project Validation by the Designated Operational Entity (DOE) Upon evaluation of the project by the DOE, the latter makes the decision to validate it or not. During this validation step, the DOE is to make the project document public and subject it to comments for 30 days. In their validation report, submitted to the Executive Board, the DOE must specify the feedbacks compiled and the way they were addressed.

Following the review of the validation report, the Executive Board may determine to register the project or not as a CDM project, within 8 weeks from reception at the most. This registration will later allow the issuance of the UREC. Step 3: Final Registration of the Project Step 4: Monitoring, Verification and Issuance of URCEs The verification of project emission reduction is ensured by another DOE. The project emission monitoring report drafted by the project developer and the said DOE’s verification report must be published. Further to the verification report, the Executive Board may issue a URCE volume equivalent to the emission reductions noted. The collection of a statutory tax of 2 percent on URECs is provided for for each registered CDM project to support an adapation fund set up by the Kyoto Protocol. This fund is meant to finance climate change adaptation projects for the most vulnerable countries. The CDM projects planned in the least advanced countries are exempted from this tax. Monitoring Emissions avoided PGESEnvironnementalImpactAvifaunaNoiseSocial

34-MW SIDI DAOUD WIND FARM Step Commis sioning AG TypeNumber Unit capacity (kW) Total capacity (MW) A2000AE ,56 B2003 AE ,72 AE AE C2009AE ,32 Total capacity (MW)53,60

Carbon Credit Generation Cycle - Sidi Daoud Wind Farm 18 juin 2009 PIN to WB 04 Février Avril ENOR URCE SALE CONTRACT ENTERED INTO WITH THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT, AS TRUSTEE OF THE SPANISH CARBON FUND

Environmental impact assessment for the wind power generation plant 3rd tranche, MW, 26 windturbine Sidi Daoud Wind Power Project November 2009 EIA Report on the social and environmental management plan for the Sidi Daoud wind power generation plant and the Sidi Daoud-Menzel Temime HV line Safety and environment Directorate CDM Project for the 3rd tranche of the Sidi Daoud wind farm (34 MW) June 2013 ESMPAVIFAUNANOISE

BIZERTE WIND FARM: 190 MW METLINE KCHABTA METLINEKCHABTAEXT. METLINE EXT. KCHABTA TOTAL Number of wind turbines Unit power (MW)1.32 Installed power (MW) CommisioningMay 2013

Carbon credit generation cycle for the Bizerte wind farm 4 February 2009 April 8, V-CUK June 2008 PIN to WB URCE sale contract entered into with CDC CLIMAT ASSET MANAGEMENT acting in the name and on behalf of CDC CLIMAT, and SOCIETE DE PROMOTION ET DE PARTICIPATION POUR LA COOPERATION ECONOMIQUE

ENVIRONMENTAL IMPACT ASSSESSEMENT FOR THE WIND POWER PLANT PROJECT IN THE BIZERTE AREA DIRECTORATE OF CORPORATE MATTERS PREVENTION AND SAFETY DEPARTMENT ENVIRONMENTAL PROJECT Novembre 2008

“nationally appropriate mitigation actions by developing country Parties in the context of sustainable development, supported and enabled by technology, financing and capacity- building, in a measurable, reportable and verifiable manner.” (UNFCCC, 2008 ; paragraphe 1 b ii) Les NAMAs