Presentation is loading. Please wait.

Presentation is loading. Please wait.

CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011.

Similar presentations


Presentation on theme: "CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011."— Presentation transcript:

1 CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011

2 Content Background National Climate Change Committee Participation in CDM Belize’s Greenhouse Gas Inventory Mitigation Potential in Belize

3

4 Composition of the BNCCC Membership: National Government ◦ Ministry of Natural Resources and Environment (Chair) ◦ Ministry of Finance (Vice Chair) ◦ Ministry of Economic Development (Vice Chair) ◦ Office of Prime Minister (Vice Chair)

5 Composition of the BNCCC Membership:  Policy Unit  Department of Agriculture  Fisheries Department  Forest Department  Ministry of Foreign Affairs  Ministry of Health  Belize Chamber of Commerce  Public Utilities Commission  Programme for Belize

6 MitigationVulnerabilityAdaptationPEO Forest DepartmentNMSMED Fisheries Department OPMNEMO Ministry of FinanceMinistry of Health Coastal Zone SWMABELIZE RED CROSSMinistry of FA Ministry of Education (QUADS) PUCUB Policy Unit NMS Galen University PfBCARDI DOE Agric Department NMSPfB FD Policy Unit Fisheries DepartmentFisheries Dept University of BelizeDOENEMO Coastal Zone Management Authority Agriculture DepartmentFD Coastal Zone Management Authority Ministry of Tourism Agriculture Department Programme for Belize Ministry of TourismFisheries DepartmentProgramme for Belize

7 Activities Implemented Jointly The Convention provides for Annex I Parties to implement policies and measures jointly with other Parties. In order to build experience and “learn by doing”, COP 1launched a pilot phase of activities implemented jointly (AIJ), under which Annex I Parties may implement projects in other countries that reduce emissions of greenhouse gases or enhance their removal through sinks.

8 Activities Implemented Jointly In 1995, Belize became one of the first countries to host a project under the pilot phase of Activities Implemented Jointly- the Rio Bravo Sequestration Project

9 Greenhouse Gases Energy Industrial processes and solvents Agriculture Land-Use change & Forestry Waste Gigagrams 617.528 1.735 46.4146 2,056.3650 104.700 Percentage of Total Emissions 21.8 <1 1.6 72.747 3.7 Belize Greenhouse Gas Inventory by Sector (1994)

10 Greenhouse Gases Energy Industrial processes and solvents Agriculture Land-Use change & Forestry Waste Gigagrams 1, 026.7511 1.8001 1.5846 7,117.7162 1.5141 Percentage of Total Emissions 12.6 <1 87.34 <1 Belize Greenhouse Gas Inventory by Sector (1997)

11 Greenhouse Gases Energy Industrial processes and solvents Agriculture Land-Use change & Forestry Waste Gigagrams 1,127.995 2.1972 2.0825 12,349.2819 1.9158 Percentage of Total Emissions 8.361 <1 91.593 <1 Belize Greenhouse Gas Inventory by Sector (2000)

12 Belize’s Eligibility to participate in CDM Date of Signature of the United Nations Framework Convention on Climate Change 13 th June 1992 Date of Ratification of UNFCCC 31 st October 1994 Date of Ratification of the Kyoto Protocol 26 th September 2003 Establish DNA2011

13 Mitigation Potential In Belize Methane Abatement - potential for utilizing the methane emission produced at primary solid waste disposal sites for electrical generation, as a viable and economy friendly operation  San Benito Solar Panel: pilot project -replacement of incandescent bulbs with compact fluorescent bulbs - Opportunities: Establish sustainability and continuity plan for existing and new solar systems. Important for policymakers

14 Mitigation Potential In Belize There was overall increased interest in solar systems among rural and remote communities of Toledo. Cogeneration Projects  Analysis of mitigation on GHGs Emission through hydropower generation and biomass cogeneration of electrical energy  It has the potential to manage 31.5 MW Renewable energy power plants

15 Mitigation Potential In Belize Hydromaya A Generating station is a 3.15 MW run off river plant located in Toledo District This is an independent power producing station and sells its power to Belize Electricity Limited

16 EU-UNEP Project- Capacity building project $129,000 USD- implementing agency- UNEP Risoe Centre. Policymakers in CDM-related line ministries such as Energy, Agriculture, and Environment Investment promotion agencies and local municipalities. CDM project proponents, particularly in the private sector and public -owned enterprises DNA staff and members as well as associated committee National experts such as local consultants, academics, and engineers from line ministries as well as national consultancy firms Local banks and financial institutions interested in investing in or financing CDM Projects in the country. First workshop held in August Capacity Building Project

17 Activities: ◦ Formulate the CDM Legal Framework ◦ Prepare CDM Review process ◦ Project approval ◦ Review mechanism ◦ Sustainable Development criteria ◦ Design/standardize format for PINS and submission of CDM projects First National workshop conducted to solicit inputs from stakeholders (4 & 5Nov) Establishment of DNA

18 The office of the Chief Executive Officer in the Ministry of Natural Resources and the Environment hosts the DNA The Role of DNA:  The assessment and approval of projects that is consistent with the national sustainable development of the country.  Written approval of voluntary participation including confirmation that project activities assist with the national sustainable development of the country. The Role of the CDM:  To promote Belize as a destination for CDM projects

19 Current CDM Status in Belize Institutional framework to promote CDM is being built Designated National Authority is being strengthened Legal framework for the CDM has been formulated Sustainable Development Priorities and indicators for use in CDM assessment process has been developed CDM Projects review and approval procedure has been developed

20 ◦ Development of CDM Investor’s Guide for the country in cooperation with BELTRAIDE ◦ Development a national portfolio of CDM Projects ◦ Workshops in communities impacted by CDM ◦ Raising awareness to bankers, financial institution ◦ Second National Workshop to be held in August 2011  PIN and PDD Preparation  Baseline methodologies  CDM Project financing  Approaches to Investment analysis, ◦ Third National Workshop – Verification and validation process ◦ Present PINs and PDDs designed Next Steps

21 Thank you for your attention!!


Download ppt "CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011."

Similar presentations


Ads by Google