Connectivity & Mobility

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Gainesville-Hall MPO 2035 Long Range Transportation Plan Update Public Information Meeting June 29, 2006.
Wade E. Kline, AICP Community Development Planner.
Complete & Connected: Tools for Planning a Balanced Transportation System Technical Workshop.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
Intercity Person, Passenger Car and Truck Travel Patterns Daily Highway Volumes on State Highways and Interstates Ability to Evaluate Major Changes in.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
MTF Rail Development Forum
Lec 20, Ch.11: Transportation Planning Process (objectives)
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
A National County-Level Long Distance Travel Model Mike Chaney, AICP Tian Huang, PE, AICP, PTOE Binbin Chen, AICP 15 th TRB National Transportation Planning.
Broward Transformation: 2035 Long Range Transportation Plan mpo.org.
1 Using Transit Market Analysis Tools to Evaluate Transit Service Improvements for a Regional Transportation Plan TRB Transportation Applications May 20,
Versatile Applications of EMME/2 and ENIF: Seattle Experience Madhavi Sanakkayala Heather Purdy & Sujay Davuluri Parsons Brinckerhoff, Seattle.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Feasibility of a Metropolitan Truck-only Toll Lane Network: The Case of Atlanta, Georgia Michael D. Meyer, P.E., Professor School of Civil and Environmental.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Association of Metropolitan Planning Organizations.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Jennifer Murray Traffic Forecasting Section Chief, WisDOT Metropolitan Planning Organization Quarterly Meeting July 28 th, 2015.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Presentation Topics Oregon Transportation Investment Acts (OTIA) Goals of Statewide Traffic Mobility Program Focus of ODOT’s Mobility Approaches Results.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Getting to Know Cube.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Exploring Cube Base and Cube Voyager. Exploring Cube Base and Cube Voyager Use Cube Base and Cube Voyager to develop data, run scenarios, and examine.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
TPB CLRP Aspirations Scenario 2012 CLRP and Version 2.3 Travel Forecasting Model Update Initial Results Ron Kirby Department of Transportation Planning.
Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Regional Visions: 50-Year Transportation Demand Modeling Florida Model Task Force Meeting December 13, 2006.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
1 Assessing Travel Demand for Exclusive Truck Facilities Matthew Roorda, University of Toronto Michael Hain, University of Toronto Glareh Amirjamshidi,
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
Regional Mobility Plan I. Introduction This process for creating a regional mobility plan is designed for geographic areas with a small to medium sized.
Minnesota State Planning Conference September 28, 2011.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Freight Transportation Plan Savannah, GA AMPO Conference - October 23, 2014.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Monica Bansal Department of Transportation Planning Presentation to the TPB CAC November 13, 2008 Progress on “CLRP Aspirations” & “What Would it Take?”
Freight Transportation Plan Savannah, GA
NGTA Halton Planning and Public Works Committee
I-85 Corridor Light Rail Transit Feasibility Study
Minnesota State Planning Conference September 28, 2011
Presentation transcript:

Connectivity & Mobility Atlanta Athens Connectivity & Mobility TRB Planning Applications Conference May 8, 2013 Kaycee Mertz, Georgia Department of Transportation David Pickworth, Atkins Patti Schropp, Atkins Jim Evans, Metro Planning and Engineering, Inc.

Project Purpose Georgia Department of Transportation undertook this study in 2011 to evaluate the Atlanta to Athens Corridor Optimize travel efficiency and safety Improve transportation connectivity to major employment and activity centers Improve mobility across and within the study area Linkage between transportation planning, land use, and economic development efforts

Atlanta to Athens Study Area I-85 I-75 I-75

Study Area Boundary Jackson Barrow Clarke Gwinnett University of Georgia Walton Oconee Downtown Atlanta DeKalb Rockdale

Study Area Information 2 MPOs, 9 partial counties, 4 transit providers, 5 CIDs East-west length of the corridor is over 54 miles long and the north-south distance is over 22 miles wide Home to over 1.3 million people in 2010 Forecast to increase to 1.7million by 2040 Over 371,000 jobs in 2010 Forecast to increase to 633,000 by 2040 Home to several regional malls , activity centers and University of Georgia (current enrollment – over 32,000) 31.1 million Daily VMT in 2010 Forecast to increase to 48.5 million by 2040

Project Goals

Key Study Activities Stakeholder Involvement Compilation of Local Land Use Plans Develop Travel Demand Model Existing Conditions Evaluation Future Needs Evaluation Identification and Evaluation of Alternatives for Study Area Case Study Analysis The Public Steering Committee Stakeholder Project Team We are here

Technical Process Perform three levels of analyses to identify potential needs and solutions Evaluate study area conditions (macroscopic) Evaluate corridor-level conditions and travel patterns (mesoscopic) Perform detailed analysis of eight selected case study areas (microscopic)

Strategy Development and Evaluation Process

Major Travel Corridors Three-Tier Approach A2A Travel Demand Model Macroscopic Model Develop broad range of improvement strategies to meet study goals Evaluate LOS, travel time, delay, speed for study area Major Travel Corridors Mesoscopic Model Evaluate LOS, travel time, delay, speed by corridor Assess impact of potential improvement strategies applied to various situations Case Study Areas Microscopic Model

1st Step - Build the Travel Demand Model Integration of ARC , Athens, & Statewide models Multimodal Non-motorized travel Highway Auto (SOV, SR2 & SR3+) Truck (Medium, Heavy & Commercial) Transit Bus Heavy Rail (HT) Bus Rapid Transit (BRT) Light Rail (LT) Commuter Rail Used for the Analysis of Study Area and Major Travel Corridors

Building the Model Final Atlanta to Athens Network (3800+ Zones) ARC Plan 2040 Network (1700+ Zones) Jackson County Network From GA Statewide Model (27 Zones) ARC Updated Network Clipped Study Area (780+ Zones) Athens-Clarke County Network From MACORTS Model (332 Zones) Downtown Athens Study Area Clipped Downtown Atlanta

Major Travel Corridors Three-Tier Approach A2A Travel Demand Model Macroscopic Model Develop broad range of improvement strategies to meet study goals Evaluate LOS, travel time, delay, speed for study area Major Travel Corridors Mesoscopic Model Evaluate LOS, travel time, delay, speed by corridor Assess impact of potential improvement strategies applied to various situations

Purpose of Major Travel Corridors Focus on routes used for regional travel More detailed analysis at corridor-level Use stakeholder input to test and evaluate Improvement Strategies in these corridors

Major Travel Corridors Done Major Travel Corridors

Evaluation of Major Travel Corridors Utilize dynamic traffic assignment Develop list of potential improvement concepts or templates that can be selectively applied to various situations throughout study area Assess potential success associated with each of identified improvement concepts Most efficient and cost-effective

Major Travel Corridors Three-Tier Approach A2A Travel Demand Model Macroscopic Model Develop broad range of improvement strategies to meet study goals Evaluate LOS, travel time, delay, speed for study area Major Travel Corridors Mesoscopic Model Evaluate LOS, travel time, delay, speed by corridor Assess impact of potential improvement strategies applied to various situations Case Study Areas Microscopic Model

Purpose of Case Study Areas The case study areas will be used to analyze and provide detailed insights associated with potential alternative improvement strategies incorporating combinations of transportation and land use strategies.

Selecting Case Study Locations Meet criteria that indicate relevance to study goals Select locations with a variety of transportation and development issues Industrial development Regional activity center Commercial development Objective for selecting locations…

Case Study Areas

Improvement Options with Land Use Strategies

Sample Case Study Simulation Objective for selecting locations…

Sample Intersection Improvement Strategy Continuous Flow Intersection Objective for selecting locations… Before After

Study Still Underway Evaluation of Case Study Areas still underway Development of Tool Box which relates transportation improvements with land use strategies Objective for selecting locations…

GDOT Project Manager/Contact Person GDOT Office of Planning For More Information GDOT Project Manager/Contact Person Kaycee Mertz GDOT Office of Planning kmertz@dot.ga.gov Phone: 404-347-0245 Website http://www.dot.ga.gov Click On – Information Center Click On – Programs & Studies Click On – Active Studies Click On – Atlanta to Athens http://www.dot.ga.gov/AtlantatoAthens