Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 23, 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MOM Report Galina Vankova RAL, MICE Video Conference.
1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MOM Report Victoria Blackmore VC /06/11 1/7.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference May 7, 2009.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MICE VC 12/2/20091 [23/1-19/2] MOM report Hogdson Apollonio Zisman 23/1/09 12/2/09 19/2/09 Relevant Issues: - NO target since december accident  no data.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Linda Coney MICO June 6, 2011 MICE Online Report.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Controls & Monitoring in MICE
Presentation transcript:

Linda Coney MC VC May 19, 2011 MICE Operations Manager Report

2 May 19, 2011MOM Report-Coney MOM Schedule

3 May 19, 2011MOM Report-Coney Recent Happenings  Power outage for substation work – contractors  Work on TOF system and KL – Maurizio, Ludovico and group  New Rack installation continues – Henry, Roger, Geoff  Work on LH2 system in Hall – Matt Hills and co.  Arrival of infrastructure for Step IV  Target in R78 – Target group  EMR group coming soon  EMR data-taking in JULY User Run – Beam starts June 27 u 10 May – 9 June 2011: ISIS run s 10 June – 12 June 2011: machine physics – pushed back to June 13/14 s 13 June – 26 June 2011: shutdown – starts now June 15 s 27 June – 3 July: run up and machine physics s 4 July 2011: machine permits u 5 July – 4 August 2011: ISIS run s 5 August – 7 August 2011: machine physics s 8 August – 4 September 2011: shutdown? (subject to change)

4 May 19, 2011MOM Report-Coney Power Outage in MICE Hall  POWER OFF:  Hall and Rack Room affected u Lights, fire, some wall power still on – ie. Work in Hall continues  Status: DAQ machines OFF PPS rack OFF Target rack OFF DS rack OFF Magnet rack OFF Network switches ON UPS on wall RAID machines OFF ONREC01 OFF OPIPC1 & 3 OFF MICESTORE OFF  Checked rack room and all consumer units isolated OFF  Checked all hall racks and all consumer units isolated OFF  POWER ON:  MICE Control Room still powered  ON In Hall: u Neutron Monitor u DS Vacuum pump in DSA u SY527 HV crate u CKOV air flow  Some Online Computers remain ON for use by group u IOCPC1 ON wall power u ONREC02 ON wall u ECSERV2 ON wall u IOCPC2 ON wall u ECSERV ON wall u CAGATEWAY ON wall u OPIPC2 ON wall

5 May 19, 2011MOM Report-Coney Work on Substation in Hall  Power out as of Friday May 13  Work began promptly – old equipment already gone  Expected complete by Friday May 27 (next week) – possbily sooner

6 May 19, 2011MOM Report-Coney Return from Power Outage  Developing plan for bringing up the system again  Controlled, gradual turn-on of systems  Test of equipment – learn of any potential failures early!  Turn ON and test w/o beam as much as possible  Decay Solenoid cooldown will start as soon as relevant equipment is powered – likely June 1  Beam test planned for Machine Physics period after current User Run – now June 13/14 u Need experts either at RAL or on call: s DAQ - Yordan, Jean-Sebastien s Controls & Monitoring – Pierrick s Control Room/Rack Room/New Rack – Craig, Henry s DS - Mike Courthold, Matt Hills  Need water restored to Hall – pipes were cut for substation work u No water to magnets, magnet PS, LH2 system

7 May 19, 2011MOM Report-Coney TOF, KL & CKOV Update  Italian groups were at RAL last week working hard to get detectors ready again  The repaired SY527 HV crate was delivered and reinstalled in the Hall u HV’s for TOF0, TOF2 must be taken from new tables and have been modified inside minicom  The installation work of last week 9/5-13/5 was successfully accomplished. u TOF0 - A PMT on TOF0 was changed with a DSA access by the MIB team u KL & TOF2 s The RM3 downstream platform was modified to allow easy installation of the EMR calorimeter by the RM3 team (Ludovico, Alfredo, Maximo and Valerio) with the help of the MIB team and the MIce Hall Willie's team s Both detectors were recabled and all PMTs tested. s One dead TOF2 PMT was discovered – on the edge - swapped out for a spare  TOF0, TOF2, and KL are in good shape and ready for data-taking  TOF1 delivery scheduled for mid-June  CKOVa out of beamline – Lucien & David to RAL mid-June

8 May 19, 2011MOM Report-Coney Rack Room & PPS  New rack almost full u (grid data mover PC, micestore, miceacq* servers and DAQ KVM system) u Old micestore turned on last Thursday to do requested backup u New micestore will be brought online after power outage  Most systems OFF due to substation work  PPS u Disconnected from ISIS system during Power Outage u DSA now officially part of ISIS – but currently chained up u Installation & testing of Hall PPS to happen this month s Requires complex process to test all options within PPS for securing and/or dropping each area s Plan to have Hall PPS during EMR Run

9 May 19, 2011MOM Report-Coney Target in R78  Ran T2.7 u Able to predict behavior of target  Now running T2.8  At MICE/ISIS target meeting last week agreed:  Present DLC/Vespel design IS suitable for use on ISIS  Performance of T2 now sufficiently good for it to be considered a “live spare” for T1, the target presently on ISIS!!

10 May 19, 2011MOM Report-Coney Next: EMR Running  Another focused data-taking period to test the first installation of the EMR  Production Running - User Run in June/July: u Machine physics June 27 - July 3 u User Run – July 5 – August 4 u Run 5 days/week – M-F u hours/day (8am-8pm) u Personnel needed: MOM, BeamLine Expert, Shift Leader, Shifter s Shift leader has more experience and trains up new person s Novices need 1 week training shifts before official shifter u Experts/those doing the study are also there to guide & monitor progress  Need to start signing up for Shifts & BLOC duties

11 May 19, 2011MOM Report-Coney EMR Running  Need to prepare for arrival  Schedule of arrival  Schedule of installation u What equipment needed here? u What personnel? u Crane work? Cabling? Etc.  Schedule of data-taking u What beam, how much, how determine tests done?

12 May 19, 2011MOM Report-Coney Conclusions  Everything is OFF at the moment….  However, it is all ready to come back on – this will take some time, but will hopefully be smoother process than last time!  EMR data-taking will be here soon &  We must be ready – come take data again! 

13 May 19, 2011MOM Report-Coney