Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008.

Slides:



Advertisements
Similar presentations
Presented to: CCSSO 2012 National Conference on Student Assessment June 27, 2012 Quality Assurance in a Chaotic World An External Perspective.
Advertisements

MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop General Structure of a Survey Plan.
Quality assurance Kari Kuulasmaa 1 st EHES Training Seminar, February 2010, Rome.
Process for preparing the national manuals Hanna Tolonen.
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor,
Quality Assurance at the Language Centre: An on- going Journey Khalid Al Kaabi Sarah Khan Pooja Sancheti.
Preparing for Compliance Monitoring Reviews Understanding CMS Protocols Used by Review Organizations January 14, 2009 Presented by: Margaret deHesse, RN,
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Second Independent Evaluation Roles / Responsibilities & Relationships.
1 Presented by Media Services Media Specialists Connections and Issues Training: November – December Zone Based Meetings.
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
EBS Survey Vermont PBS “Bringing out the BEST in all of us.”
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Photocopies Occasionally need uncontrolled copies
Monitoring Accommodations in South Dakota Linda Turner Special Education Programs.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Student Learning Objectives The SLO Process Student Learning Objectives Training Series Module 3 of 3.
Transportation leadership you can trust. presented to Transportation Planning Applications Committee (ADB50) presented by Sarah Sun Federal Highway Administration.
My rights, my voice project Package 2. Package 2 Development of training programme  Aim: To develop a training programme on the UNCRPD designed for people.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.
Alabama Professional Education Personnel Evaluation Program Field Test of Library/Media Specialist Evaluation System July 2000.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Overview of ICCS field trial National Research Coordinators Meeting Windsor, June 2008.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Quality Standards in TIMSS and PIRLS The Basis for Valid and Reliable Data for Educational Decision Making Ina V.S. Mullis, Michael O. Martin, & Pierre.
Evaluation Tools & Approaches for Engaging Stakeholders: The AREA Approach Presentation at the Canadian Evaluation Society Dr. Mariam Manley, Principal.
1 Department of Medical Assistance Services Stakeholder Advisory Committee June 25, 2014 Gerald A. Craver, PhD
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
Developing Structured Activity Tools. Aligning assessment methods and tools Often used where real work evidence not available / observable Method: Structured.
Environmental Procedures Best Practices Review STRENGTHENING MISSION ENVRONMENTAL COMPLIANCE & PROJECT OUTCOMES.
National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008.
Quality Assurance Program National Research Coordinators Meeting Amsterdam, October 2006.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
Robert M. Summers, Ph.D. September 16, 2015 How can we make sure the Chesapeake Bay Restoration really works?
Preparing national HES Manuals. What is the function of the national HES manual Documents the entire survey process Planning Field work Laboratory procedures.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 ICCS 2009 Main Survey Field Trial Results.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S - Introduction.
Study Overview National Research Coordinators Meeting Amsterdam, October
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
C.V.T. GEORGIKI ANAPTIXI – Canakkale, 15 – Implementation of a quality assurance system for training in organic food retail EcoQualifyIII Agreement.
Plan for Full Implementation Delaware Reading First Year 3.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
At-Large Review Briefing 1 May | 2 Roles and Responsibilities SIC Oversight Accept Report* Approve Plans* Staff Prepare RFP Run Examiner Selection.
Wimba Session Two Program Evaluation Project
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction English Learner Program Categorical Program Monitoring Bilingual.
Future Directions Update Project Timeline Report to the Steering Committee - 6/04 Briefing to Coordination Group - 6/1/04 Comments due - 5/14/04 Briefing.
CAA Options: Collection of Evidence CTE Connection December 8, 2006 Rod Duckworth, Director of Career and Technical Education OSPI.
Implementation and Sustainability in the US National EBP Project Gary R. Bond Dartmouth Psychiatric Research Center Lebanon, NH, USA May 27, 2014 CORE.
Group of Experts on Monitoring of Radioactively Contaminated Scrap Metal Second Session Geneva, June 2006 United Nations Economic Commission for.
Visit us at E mail: Tele:
Dr Sally Priest, Flood Hazard Research Centre
Flooding Walkdown Guidance
Sherry Franklin, North Carolina Part C Coordinator
Sherry Franklin, North Carolina Part C Coordinator
Data harmonization in International Surveys on Education
"Experience with the peer reviews, successes and things to change for next reviews" Delina Ibrahimaj, Albania.
Presentation transcript:

Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008

NRC Meeting Windsor 9-12 June 2008 Content of presentation Goals and organization of the Quality Control Program National Quality Control Monitoring - Procedure International Quality Control Monitoring - Requirements - Responsibilities

NRC Meeting Windsor 9-12 June 2008 Quality Assurance Program for ICCS Two components: - National (organized by the National Center) - International (organized by IEA) Goal: - To provide evidence that the standard international procedures for data collection were followed

NRC Meeting Windsor 9-12 June 2008 National Quality Control Monitoring in Field Trial Feedback received from 22 countries - 20 implemented IEA NQCM program - 2 took other measures Countries used IEA manual 7 countries used external agency to control the process of implementation

NRC Meeting Windsor 9-12 June 2008 National Quality Control Monitoring in Main Study The same procedure as in Field Trial  IEA provides a manual with guidelines  The National Center identifies National Quality Control Monitors (NQCM) to: - Visit 10% of participation schools - Verify distribution of materials to students - Observe survey administration procedures - Verify information on Tracking Forms - Interview School Coordinator and Survey Administrator  NQCM reports to NRC  NRC provides information about implementation of the national program through SAQ

NRC Meeting Windsor 9-12 June 2008 International Quality Control Monitoring The National Center: - identifies an International Quality Control Monitor (IQCM) IEA Secretariat: - Signs contract with IQCM - Provides all necessary materials - Conducts training for the IQCM in Amsterdam SH countries: 29 – 30 September 2008 NH countries: 19 – 20 January 2009

NRC Meeting Windsor 9-12 June 2008 Identifying International Quality Control Monitor Person acceptable for schools Person who understands school functioning Fluent in English Independent of the National Center and if possible: Familiar with educational research

NRC Meeting Windsor 9-12 June 2008 Responsibilities of International Quality Control Monitor Visit the NRC, collect the final set of instruments, manuals and documentation Visit 15 selected schools and report on data collection Interview School Coordinator and Survey Administrator Comment on the implementation of the translation and layout verification Reports to IEA Secretariat IEA Secretariat summarizes result in Technical Report

NRC Meeting Windsor 9-12 June 2008 Questions and comments ?!!