Presentation is loading. Please wait.

Presentation is loading. Please wait.

ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.

Similar presentations


Presentation on theme: "ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007."— Presentation transcript:

1 ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007

2 ICCS DMS Hamburg July 2007 Status of country participation 38 countries have either confirmed or expressed interest Two regional modules –European module –Latin American module

3 ICCS DMS Hamburg July 2007 Outcomes of NRC meeting Review and discussion of proposed field trial instruments –Cognitive test –Student questionnaire (background and perceptions) –Teacher questionnaire –School questionnaire Revision of timelines for Field Trial –data collection period until mid-December

4 ICCS DMS Hamburg July 2007 Activities since NRC meeting - 1 Revision of country feedback –discussion groups at Rome meeting –written comments from NRCs Final review and modifications at ISC and partner institutions Inclusion of questionnaire items suggested by countries

5 ICCS DMS Hamburg July 2007 Activities since NRC meeting - 2 Elaboration of manuals for field trial National adaptations forms for field trial instruments Modification, editing and proof-reading of final field trial instruments

6 ICCS DMS Hamburg July 2007 Materials for field trial - 1 Survey Operations Procedures Manual parts already sent to NRCs –Revised overview document (with updated timelines) –Unit 1: Contacting schools, adaptation and translation of instruments Further releases: –Unit 2 on within-school sampling and test administration (23 July 2007), includes school coordinator, test administrator and national quality monitor manual –Unit 3 on on-line data collection, scoring and data entry (20 August 2007)

7 ICCS DMS Hamburg July 2007 Materials for field trial - 2 Annotated field trial instruments for translation already sent to NRCs –Cognitive test items (including scoring guide) –Scoring guide for reference (pdf) –Student background questionnaire –Student perceptions questionnaire –Teacher questionnaire –School questionnaire –Covers for test and questionnaire booklets

8 ICCS DMS Hamburg July 2007 Materials for field trial - 3 National Adaptation Forms –EXCEL file dispatched with field trial instruments Assembly of final instruments (to be sent by 13 July) –Instructions for assembling student test booklets and questionnaire forms –Test booklets and questionnaires in pdf format

9 ICCS DMS Hamburg July 2007 Regional instruments - 1 Not yet available European instrument is being developed and should be finalised until end of July Latin American instrument is being elaborated and will be released end of August Special procedures required for inclusion in field trial

10 ICCS DMS Hamburg July 2007 Regional instruments - 2 European instrument requires translation –to be incorporated into translation and layout verification –separate NAF Latin American instrument does not require translation –Spanish source version –separate NAF –to be incorporated into layout verification

11 ICCS DMS Hamburg July 2007 Questions or comments?


Download ppt "ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007."

Similar presentations


Ads by Google