Industry Shipperless & Unregistered Working Group Wednesday 1 st February 2012.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

Shipperless & Unregistered Workgroup Wednesday 29 th January 2014.
Shipperless & Unregistered Workgroup Tuesday 6 th May 2014.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
Mod for Discussion on 7 th January 2011 Draft Outline of Potential Refinements to the User Pays Modification Process Action RG Based on discussions.
1 Project Nexus Requirements Definition Phase Steve Nunnington.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
PN UNC Workgroup Supply Point Register 25 th October 2011.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
Shipperless & Unregistered Workgroup Friday 15 th March 2013.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Shipperless & Unregistered Workgroup Wednesday 17 th September 2014.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
PN UNC Workgroup Read Validation 4 th October 2011.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
PN UNC Workgroup Invoicing 4th October 2011.
Project Nexus Workgroup
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Industry Shipperless & Unregistered Working Group
Project Nexus Workgroup
Shipperless and Unregistered Workgroup
Connections & Registration
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Consideration of issues raised by UNC Modification Proposal 0244
Deferral of Retrospective Updates Functionality
Development modification group 194
Development modification group 194
M Number Creation process
Development modification group 194
Development modification group 194
Modification 421 – Updates and Benefits Case
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Shipperless/Unregistered Sites
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Unregistered and Shipperless Process
Project Nexus Workgroup
Development modification group 194
Customer Issue Management CoMC Update for June 2019
Industry Shipperless & Unregistered Working Group
Capacity Access Review
Presentation transcript:

Industry Shipperless & Unregistered Working Group Wednesday 1 st February 2012

Agenda  Introduction  Review ‘Terms of Reference’ document  Previous minutes/actions  Statistical Information  Overall industry volume  Age analysis/AQ values  Targeted sites  Legitimate pot – The curious case of Dursley Sainsbury’s  Proactive data cleansing  Duplicate identification (Orphaned/PTS/SSP/No activity)  Discussion points  MOD 0410  Fitting meters without advising Supplier  A.O.B.

Terms of Reference – Review existing principles  Purpose and Objectives (A collective cross industry working group) 1)Collectively establish & execute activities to correct the current Unregistered/Shipperless datasets recorded within the central systems; 2)Identify the root causes & fix the process deficiencies; 3)Review the outcome of ‘Project Delta’ field visits & agree next steps, inclusive of Unregistered/Shipperless sites that are not recorded on central systems.  Scope  This working group has been established to address the 3 objectives utilising Licence, UNC and non-UNC instruments as appropriate  Composition  The working group has been designed to be an open Industry forum. It is the intention that representatives from Gas Distribution Networks and Suppliers as a minimum would be in attendance.

Terms of Reference – Considerations  Industry change  Modification discussions & Workgroups  Potential duplication of decision making  Scope of influence  Continue with quarterly forum?  Change reporting frequency?  Consensus across Stakeholders

Statistical Information

Overall Industry volumes

Overall Industry volumes: Age analysis OrphanedLegitimate YearVolume% % Pre %980.30% %310.09% %580.18% % % 20031, %1, % 20041, %1, % 20051, %2, % 20061, %4, % 20071, %7, % 20082, %6, % 20091, %3, % 20101, %4, % Total14,845100%32,653100%

Overall Industry volumes: AQ values SSPLSP ‘Shipper activity’ pot AQ value 6,174,09514,637,981 ‘Orphaned’ pot 12,0672,778 AQ value 248,005,1641,415,967,810 ‘No activity’ pot 1, AQ value 25,000,047164,592,918 ‘Legitimate’ pot 27,2605,393 AQ value 612,032,4575,407,507,978 Total AQ 891,211,7637,002,706,687

Top 500 Legitimate pot: AQ breakdown AQNo. of sites ,642, ,656, ,468, ,319, ,757, ,478, ,396,234,44892 Total4,080,556,383500

The curious case of Dursley Sainsbury’s  MPR … created 28 th May 2009  Requested/Current AQ… 301,344,000  Store opened 17 th March 2010  Duplicate checks proved negative  January 2012… Sadly still Unconfirmed SAINSBURY’S Castle St, Dursley, Glouc’s GL11 4BS

Targeted sites  To aid progression focus on specific ‘Legitimate’ categories  Highest AQ ~ Wider industry implications  Potential to re-categorise/remove?  Opportunity to stem rising volumes  Propose to issue ‘Legitimate’ pot for targeted analysis  How would industry like Xoserve to manage further examples  End-user letters?  Network Site Visits?  Issue priority Unconfirmed ‘pots’

Proactive data cleansing - Orphaned  Report to identify potential duplicates from ‘Orphaned’ pot  Using ‘Fuzzy match’ principles  Matched MSN and address (in line with DUP procedure)  In total 6,409 MPR’s with asset attached  147 ~ High confidence of duplicate (backed by manual checks)  18 ~ Possible; raise internal DUP  6244 ~ Not duplicates  Options to progress high confidence duplicates  Set to ‘EX’  Request sample Site Visits

Proactive data cleansing - PTS  Report to identify potential duplicates from ‘PTS’ (Shipperless sites derived from GSR process)  Using ‘Fuzzy match’ principles  Matched assumed MSN & address (in line with DUP procedure)  In total 2,120 MPR’s in population  64 ~ High confidence of duplicate (backed by manual checks)  9 ~ Possible; raise internal DUP  2047 ~ Not duplicates  Options to progress high confidence duplicates  Set to ‘EX’  Request sample Site Visits

Proactive data cleansing - SSP  Report to identify potential duplicates from ‘SSP’ (Shipperless sites derived from GSR process)  Using ‘Fuzzy match’ principles  Matched assumed MSN & address (in line with DUP procedure)  In total 4,749 MPR’s in population  106 ~ High confidence of duplicate (backed by manual checks)  10 ~ Possible; raise internal DUP  4,633 ~ Not duplicates  Options to progress high confidence duplicates  Set to ‘EX’  Request sample Site Visits

Proactive data cleansing – No activity  Report to identify potential duplicates from ‘No Activity’ pot  Using ‘Fuzzy match’ principles  Matched assumed MSN & address (in line with DUP procedure)  In total 1,408 MPR’s in population  3 ~ High confidence of duplicate (backed by manual checks)  3 ~ Possible; raise internal DUP  1,402 ~ Not duplicates  Options to progress high confidence duplicates  Set to ‘EX’  Request sample Site Visits

Modification 0410  Currently at draft proposal stage  New Connections where gas off-taken at Unregistered sites  Transporter responsibility  Where MPR’s created for non Shipper parties  Shipper responsibility  Where MPR requested by Shipper  Consideration to current processes  Impacts on reporting  Requirements to support change

Fitting meters without advising Supplier  Anne Jackson

AOB  Any other business…