Prof Max Munday The E4G Toolkit. What is an E4G project expected to do/collect in terms of visitor numbers and related information? When you need to deliver.

Slides:



Advertisements
Similar presentations
Innovation data collection: Advice from the Oslo Manual South East Asian Regional Workshop on Science, Technology and Innovation Statistics.
Advertisements

Health impact assessment explained
Monitoring and Evaluation Heritage Tourism Project Key Issues as envisaged by Cadw Howard James.
NMAHP – Readiness for eHealth Heather Strachan NMAHP eHealth Lead eHealth Directorate Scottish Government.
OECD/INFE High-level Principles for the evaluation of financial education programmes Adele Atkinson, PhD OECD With the support of the Russian/World Bank/OECD.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme CAST Plenary Meeting 30 September.
GIS and Transportation Planning
Mainstreaming Cycling for All Nick Vaughan Transport for Greater Manchester Eleanor Roaf Sustrans Local Sustainable Transport Fund National Conference.
Environment for Growth Survey Insights and the E4G Website Neil Roche.
Evaluating the Performance of Salespeople
M&E Issues: RAFIP and REP Kaushik Barua Accra, 12 Dec
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
Managing Finance and Budgets
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
11-1 Ch. 11App: The Financial Impact The Financial Assessment Process Budgetary considerations play a role in the identification, evaluation, and control.
2 nd September 2014 Sean White – Tourism Intelligence Unit (ONS) Measuring Tourism Locally in Northern Ireland.
En Route Surveys Chapter 38 Research Methodologies.
Chapter 6 Training Evaluation
INNOVATION Presented by: Sabrina binti Kamin 5 – 8 December 2011 Hanoi, Vietnam.
Developing the Marketing Plan
Environment for Growth Monitoring and Evaluation: The Why, What and How Dr. Calvin Jones.
International Workshop on Industrial Statistics Dalian, China June 2010 Shyam Upadhyaya UNIDO Statistical units and data items.
E4G The E4G Toolkit. Some opening issues for the day Background -economic connections arising directly/indirectly from E4G type activity; How far can.
New Partners for Smart Growth 11th Annual Conference San Diego February 2, 2012 New Parking Standards for Affordable Housing.
1 Copyright © 2000 by Harcourt, Inc. All rights reserved. (1) 11 Evaluating the Performance of Salespeople Module 11 Evaluating the Performance of Salespeople.
Regional GDP Workshop. Purpose of the Project October Regional GDP Workshop Regional GDP Scope Annual Current price (nominal) GDP By region.
Developing the Logical Frame Work …………….
RESEARCH A systematic quest for undiscovered truth A way of thinking
GDP measurement issues Graeme Walker Head of National Accounts Productivity Puzzle Seminar: 16 October 2012.
The TRICS Multi-Modal Survey Methodology KEVIN TRAVERS, HAMPSHIRE COUNTY COUNCIL.
Seminar on Mid Term Evaluation in Objective 1 and 2 Regions Lessons from the Mid Term Evaluation of Merseyside Objective One.
Implementing Adult Risk Factor Surveillance in Manitoba Case Studies ARFS Symposium January 26, 2011.
OECD/INFE Tools for evaluating financial education programmes Adele Atkinson, PhD Policy Analyst OECD With the support of the Russian/World Bank/OECD Trust.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
MaxSumo and MaxEva An overview. Disposition 1.MaxSumo 2.Example of MaxSumo 3.MaxEva 4.Questions.
Environment for Growth Interpretation Project: Issues for Discussion Dr. Calvin Jones.
EVALUATION APPROACHES Heather Aquilina 24 March 2015.
Transforming Community Services Commissioning Information for Community Services Stakeholder Workshop 14 October 2009 Coleen Milligan – Project Manager.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
Prof Max Munday Examining the Welsh economy interconnections.
W HAT IS M&E  Day-to-day follow up of activities during implementation to measure progress and identify deviations  Monitoring is the routine and systematic.
Six Bells Event Jane and Neil WERU. Valleys Regional Park Six Bells One Day Event in June Six Bells Event - background The Survey – practical details.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Chapter 6 Training Evaluation
M & E TOOLKIT Jennifer Bogle 11 November 2014 Household Water Treatment and Water Safety Plans International and Regional Landscape.
Evaluating Ongoing Programs: A Chronological Perspective to Include Performance Measurement Summarized from Berk & Rossi’s Thinking About Program Evaluation,
Environment for Growth Monitoring and Evaluation: The Why, What and How Calvin Jones.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
59 ½ Southwark Street London SE1 0AL (UK) ++44 (0) / Travel Plan Monitoring and Evaluation: London PIMMS-transfer.
Environment for Growth Monitoring and Evaluation: The Benefits Dr. Calvin Jones.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
© EIPA – Robin Smail / Ex-ante Project Appraisal & project selection 1 Robin Smail Senior Lecturer CoR / DG Regio Open Days 28 September 2004 Steps for.
Session 2: Developing a Comprehensive M&E Work Plan.
Defining Key Performance Indicators Learning from international practices Challenges for the UI scheme in Viet Nam By Celine Peyron Bista, 13 December.
NFM: Modular Template Measurement Framework: Modules, Interventions and Indicators LFA M&E Training February
Training Evaluation Chapter 6 6 th Edition Raymond A. Noe Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
IMPLEMENTATION AND PROCESS EVALUATION PBAF 526. Today: Recap last week Next week: Bring in picture with program theory and evaluation questions Partners?
Chapter 5 Bidding and Planning for Different Events.
ACF Office of Community Services (OCS) Community Services Block Grant (CSBG) Survey of Grantees Satisfaction with OCS Survey of Eligible Entities Satisfaction.
 CHANNELS OF DISTRIBUTION  DISTRIBUTION STRATEGY  SUPPLY CHAIN MANAGEMENT/LOGISTICS Place (Distribution)
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
WIS DOT MCLARY MANAGEMENT PERFORMANCE MEASUREMENT.
Environment for Growth
Employment and Social Affairs Platform
Developing an evaluation model to assess prevention measures (EVAPREM)
Marketing Experiments I
Presentation transcript:

Prof Max Munday The E4G Toolkit

What is an E4G project expected to do/collect in terms of visitor numbers and related information? When you need to deliver outputs? How one might collect visitor information? Hint at the support resources available in the toolkit?

Expectations? EU monitors impact of interventions. Some elements of E4G easier to monitor than others – direct job creation? But monitoring and evaluation of levered visitors more difficult Associated toolkit gives practical helps and tools – the returns from visitor volume analysis and surveys a key part of the evidence base Important to gain some consistency across E4G – A common approach to evaluation means that the overall results of individual E4G bids can be reported consistently/compared.

What resources are available to help? Guidance on how to measure visitor volumes & numbers/estimates, A core visitor questionnaire set applicable to E4G Guidance on when and how to undertake visitor surveys inc. specific help on technical statistical issues, such as sampling, Indicative resource implications of M&E activity, A database template within which to input and store visitor data Examples of management, monitoring and communication plans upon which you can base those for your own project.

What needs to be done? Key component is visitor information is collecting visitor volume and survey data. Most E4G sites will only be required to supply information on visitor volumes Some (typically larger) projects will be required to undertake a limited number of more insightful visitor surveys

When Individual bids will have different requirements in terms of what materials are delivered and when. In terms of visitation deliverables each project will be expected to undertake an analysis of baseline within a short period of approval. Estimates of visitor volumes will be collected in each year Visitor surveys will be undertaken at a selection of projects during 2011 and 2013 (with the exception of sites funded under the Valleys Regional Park and Heads of the Valleys initiatives which will survey in 2010 and 2011). Projects which will be required to survey will be selected in 2010 by the E4G steering board and will be contacted with a view to developing appropriate surveys.

Visitor volumes… Key component of the M&E process is need to estimate visitor volumes and characteristics at sites, and then with the possibility of estimating impact per visitor. Volume estimates will be combined with data from visitor surveys and E4G-level modelling of indirect impacts to provide a gauge of projects’ overall economic impact, both for WEFO monitoring purposes and to help site managers understand the nature of their product and market. All sites – detailed surveys? NO e.g. smaller sites gain estimate of volumes and assume characteristics and behaviour are in line with those reported at other similar projects. To assist this a typology of sites has been produced to aid matching. To estimate volumes expectation is a mix of methods will be used (size, nature of site, costs) but important that managers understand issues with each option

Options ? Cordon Pedestrian Count ‘Hotspot’ Pedestrian Count Car Park Vehicle Count Entry Ticket Sales Car Park Ticket Sales Links & routes: remote sensing

Generic planning and issues Each approach relatively straightforward but each needs degree of planning Site characteristics in terms of scale, scope will determine method Development of a sampling frame that ensures adequate coverage over the course of a day and week and controls for spikes Training of surveyors; data input/database and collection Provision of adequate tools counters/clickers and recording sheets to surveyors, data collection tools etc. Where analysis based on ticketed revenues need to examine concessions and season ticket visitation An up-front strategy to obtain & deal with data from car park operators when these are different from site managers

Website resources F2-F4

Visitor/Vehicle Counting Methodologies: When To Count? representative estimate of visitor numbers means visitor counts must be allocated and undertaken to reflect likely changes in attendance over year estimates on a quarter-by-quarter basis to fit with the collection of wider E4G and visitor/tourism data sites and projects need to estimate numbers January- March; April-June; July-September and October- December, with counts distributed within those quarters effort and resource does not need to be equally distributed

Suggested framework

Surveys Within the guidance pack and on the website there is also material for undertaking more detailed surveys. Purpose of visit, demographics, trip specifics, travel method, spending module There is no single, ideal method; site and visit characteristics might dictate a certain approach, as might the level of available surveyor resource.

Possible survey methods  Produces potentially the most ‘unbiased’ site survey  Requires planning to ensure surveyors don’t approach the same people multiple times (especially problematic with smaller visitor numbers)  Can be inefficient use of surveyor time where visitor numbers are lower  May be inappropriate for sites with restricted space or a set visitor flow. F2F Random Survey  Very resource efficient  Easy to manage – forms can possibly be distributed/collected over a period of days  Little control over sample (self selecting) leading to potential bias  Potential comprehension issues require carefully designed form Cannot control when surveys are completed Hotspot Self Completion Survey  Very resource efficient – questionnaires can be distributed to many visitors  Potentially good quality information, completed at leisure and post-visit  No control over returns leading to potential bias  Potentially uncertain/low response rates Potential quality/comprehension issues require carefully designed form Postal Return Self Completion Survey

Website resources F5-F6

Conclusions Planning surveys Be aware of S&Ws of different options for surveying and counting Website resources Its not the Grand Canyon