N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
CPM Scheduling Techniques & Technologies Cayuga I-35E, St. Paul
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Belt Line Project Cost Update May 27, Belt Line – Project Overview Undergrounding of aerial utilities – electrical and telecom Two Phases – Marsh.
LOR-U.S. 20 / S.R. 113 Center Ridge Rd. Widening Center Ridge Rd. at Avon Belden Rd. (S.R. 83)
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Golden Triangle Blvd. Progress Report March 27, 2007.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Property Acquisitions June 15, 2010 Presentation for SR 100 Board/City Council Meeting.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Projects City Council Workshop May 14, 2013.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Goforth Road – Status Update September 16, 2014 I.Typical Sections & Pavement Design II.Budget & Preliminary Cost Estimate III.Schedule IV.Extension from.
MED SR 18 Corridor Project MED PID October 13, 2015.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Existing Interchange CC 215 Single bridge I 15
Thoroughfare Plan Update
2nd Street Drainage and Paving Improvements
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
UTILITY DESIGN SERVICES
Center City Connector 101.
DICKINSON AVENUE RECONSTRUCTION
General Tab Project, Cost Schedule, and Work Limits Roadway Character
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Issaquah-Fall City Road
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SW 6th Ave. – Fairlawn to Gage
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Harbour Island Force Main Replacement
Presentation transcript:

N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014

Proposed Typical Sections Miller St. to Lockhart St. OPTION 1 OPTION 2 20 year pavement designs

Location Map

Proposed Typical Sections Lockhart St. to Marketplace OPTION 2 OPTION 1

Proposed Typical Sections Lockhart St. to Marketplace OPTION 3 OPTION 4

Location Map

Proposed Typical Sections IH 35 Connector OPTION 1 OPTION 2

Location Map

Budget and Cost Estimate Update Miller St. to Lockhart St.

ROW Impacts Miller St. to Lockhart St. Option 2 Major impacts to business parking Parking reduced from 34 spaces to approximately 20 spaces Traffic signals at Center relocated ADA facilities relocated/reconstructed Option 1Water conflicts – 260 LFW/W conflicts – 0 LF Option 2Water conflicts – 350 LFW/W conflicts – 0 LF

Budget and Cost Estimate Update Lockhart St. to Marketplace Option 4 – 3 lanes Lockhart to North; Southbound right turn lanes at North St. and Spring Branch.

ROW Impacts Lockhart St. to Marketplace Most property acquisitions approximately 9 feet from existing ROW to proposed ROW Option 1Water conflicts – 3365 LFW/W conflicts – 1545 LF Option 2Water conflicts – 3365 LFW/W conflicts – 1545 LF Option 3Water conflicts – 3365 LFW/W conflicts – 1545 LF Option 4Water conflicts – 2000 LFW/W conflicts – 0 LF Logical termini for Phase 1 before RR – requires 2 PS&E packages; additional design fee. Phase 2 – RR to IH 35 Connector and cul-de-sac at low water crossing

Budget and Cost Estimate Update IH 35 Connector

ROW Impacts IH 35 Connector No utility conflicts

Cost Estimate Comparisons RR Quiet Zone – approximately $50K Burleson Option CombinationsEst. CostDifference Option 1, 1, 1$8,641, $141, Option 2, 2, 2$9,397, $897, Option 1, 2, 1$8,817, $317, Option 1, 2, 2$9,187, $687, Option 2, 1, 1$8,852, $352, Option 2, 2, 1$9,027, $527, Option 1, 3, 1$8,217,649.50$282, Option 1, 3, 2$8,587, $87, Option 1, 4, 1$6,964,009.00$1,535, Option 1, 4, 2$7,334,319.00$1,165, Option 2, 3, 1$8,427,849.50$72, Option 2, 3, 2$8,798, $298, Option 2, 4, 1$7,174,209.00$1,325, Option 2, 4, 2$7,544,519.00$955, Authorized Budget $8,500,000

Cost Estimate Comparisons Option Combinations Within Budget LocationOptionComments Miller to Lockhart12 lanes Miller to Lockhart23 lanes Lockhart to Marketplace13 lanes w/sidewalks Lockhart to Marketplace23 lanes sidewalk & shared path Lockhart to Marketplace33 lanes 1 sidewalk Lockhart to Marketplace42 & 3 lanes, 1 sidewalk IH 35 Connector13 lanes IH 35 Connector24 lanes Within Budget Burleson Option Combinations Est. CostDifference Option 1, 3, 1 $ 8,217, $ 282, Option 1, 4, 1 $ 6,964, $ 1,535, Option 1, 4, 2 $ 7,334, $ 1,165, Option 2, 3, 1 $ 8,427, $ 72, Option 2, 4, 1 $ 7,174, $ 1,325, Option 2, 4, 2 $ 7,544, $ 955, Authorized Budget $8,500,000

Alternate Cost Estimate Comparisons Within Budget Burleson Option Combinations Est. CostDifference Alternate Pavement Design Revised Difference Option 1, 3, 1 $ 8,217, $ 282, $ 8,314, $ 185, Option 1, 4, 1 $ 6,964, $ 1,535, $ 7,040, $1,459, Option 1, 4, 2 $ 7,334, $ 1,165, $ 7,414, $1,085, Option 2, 3, 1 $ 8,427, $ 72, $ 8,526, $ (26,949.50) Option 2, 4, 1 $ 7,174, $ 1,325, $ 7,252, $1,247, Option 2, 4, 2 $ 7,544, $ 955, $ 7,626, $ 873, Authorized Budget $8,500,000 LocationOptionComments Miller to Lockhart12 lanes Miller to Lockhart23 lanes Lockhart to Marketplace13 lanes w/sidewalks Lockhart to Marketplace23 lanes sidewalk & shared path Lockhart to Marketplace33 lanes 1 sidewalk Lockhart to Marketplace42 & 3 lanes, 1 sidewalk IH 35 Connector13 lanes IH 35 Connector24 lanes

Schedule of Activities Project letting could vary with City engaging the services for proposed ROW surveying and appraisals. Last 9 months of RR Coordination is for material procurement by UPRR. Potential risk for contractor claim if RR coordination is delayed and/or City elects to remove RR work from project after letting.