11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.

Slides:



Advertisements
Similar presentations
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 17, 2013 ANC 5E Briefing for: Northeast Boundary Neighborhood.
Advertisements

Rock Creek Sewer Separation & Water Main Replacement – CSO 031, 037, 053 and 058 Presented to CWEA / WWOA / CSAWWA 2011 Tri-Association Conference Collections.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Project Background and Objectives
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 7, 2014 Rainwater Harvesting: Update on Bioretention at Wangari.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Chisholm Trail Special Utility District Open House September 19, 2009.
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Presentation to Maxwell Place Homeowners Association 1.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
North Queen Anne Neighborhood Traffic Management Plan November 2004.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Basement Flooding Improvement Program Town Hall Meeting, Ward 33 May 21, 2009.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
ABSTRACT Through regulations and penalties, the Environmental Protection Agency encourages cities to prevent the contamination of rivers, streams, and.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Elevating the Quality of Life in the District LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION PROJECT UPDATE DECEMBER 15, 2015.
Smoke Testing Information
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Our old plumbing As long as the toilet flushes and the shower drains, we rarely think about our sewers. But in parts of our city, what we flush sometimes.
Our old plumbing As long as the toilet flushes and the shower drains, we rarely think about our sewers. But in parts of our city, what we flush sometimes.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Comprehensive Thinking and Planning
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
Comprehensive Sewer Planning Update Meeting M. Chris Swartz, Village Manager Mustafa Emir, Village Engineer March 23, 2015.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
ND Downstream Watersheds Comprehensive Detention Planning
Stormwater Management
2nd Street Drainage and Paving Improvements
Welcome to the Libertyville Stormwater Master Plan Open House
Sewer System Presentation
Comprehensive Sewer Planning Update Meeting
June 5, 2017.
City of Johnston East of Merle Hay Road Infrastructure Improvements
SPU Modeling & Monitoring
Natural Environment: 0% Impervious Surface Built Environment:
Colchester Interceptor System Improvements Project
Our city’s plumbing problem
[OUR CITY NAME]’S OLD SEWERS
OUR CITY’S PLUMBING PROBLEM
Fixing Our City’s Old Sewers
Harbour Island Force Main Replacement
Presentation transcript:

11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast Boundary Neighborhood Protection Project Status Update Briefing on:

22 Northeast Boundary Neighborhood Protection Project Status Overview  Northeast Boundary Tunnel  Over $600 million  Preliminary Design on schedule  2022 completion  First Street Tunnel Design-Build  $150-$160 million  Contract award October, 2013 (on schedule)  Construction anticipated to begin January, 2014  McMillan Stormwater Storage  $12 million  Under construction

33 McMillan Stormwater Storage Project North Capitol Street Diversion  Intersection of North Capitol Street NW and Michigan Avenue NW  Temporary storage tank (up to 3 million gallons)  Scheduled completion (end of November 2013)

44 McMillan Stormwater Storage Project Construction Schedule: North Capitol St NW Jun 2013 – Nov 2013 Construction Work Hours: Monday – Friday work in street, if required 9:30AM – 3:30PM Monday – Saturday Work in Street 7:30PM – 4:30AM

55 McMillan Stormwater Storage: Original Plan  Use 2 existing sand filters at McMillan site  Divert stormwater into storage during major rain events  Up to 6 million gallons storage Irving St Michigan Ave First St. N. Capitol St. North Capitol Tank & Diversion Structure (under construction) First St Tank & Diversion Structure

66 Upstream Areas Tributary to First St. Tank Served by Combined Sewers  DC Water performed due diligence investigations upstream as part of detailed design and found:  Upstream area was not completely separated  Low basements at Washington Hospital Center would require special project to protect from flooding  Private campuses with private sewers  DC Water’s maps do not show the private sewers in these areas  Maps available at the time of the Mayor’s Task Force showed the upstream public sewers to be separated 6 6 Rhode Island Ave Nat’l Rehabilitation Hospital Ken yon St First St Tank Portion of Wash. Hospital Center Portion of Soldiers’ Home Portion of Children’s Hospital

77 Irving Street Green Infrastructure Irving St Michigan Ave Construct Bioretention (Green Infrastructure) along Irving St  Bioretention will be installed in the public right of way (traffic medians and road sides)  Construction from November 2013 through spring 2014 N. Capitol St

88 Summary of Revised Plan  Moved First St diversion structure south near Channing St  Connects to First Street Tunnel  McMillan storage tank (Cell 15) on First Street side will not be used  Bioretention (rain gardens) on Irving Street  Benefits  Keeps combined sewage in the sewage system where it belongs  Directs stormwater to bioretention for treatment  Allows hospitals and Soldiers’ Home to remain in service uninterrupted  Bioretention improves District as a whole and serves as a model for green infrastructure

99 McMillan Stormwater Storage Project Construction Schedule: First St NW Start Dec 2013 Construction Work Hours: In coordination with DDOT and DCRA

10 First Street Tunnel  Pre-Construction Surveys  Residents are asked to complete the Pre-construction Survey and Neighborhood Mitigation Questionnaire that has been mailed.  Pre-construction Surveys benefit the property owner by documenting the condition of the property before the start of construction.  By taking advantage of the survey, you will make the process easier, in the event that a claim needs to be filed.

11 First Street Tunnel  Utility Relocation  Gas and electric utilities in specified locations throughout the Bloomingdale neighborhood will be relocated.  Informational sheets with map will be hand delivered to residents within the affected area  Work will begin in late September and extend for a period of approximately 10 weeks, weather permitting.

12 Programs Available to Property Owners  DC Water Backwater Valve Rebate program  Purpose: Prevent sewage from backing up through the sewer lateral into lower level plumbing fixtures in a home  Eligibility includes properties with reported sewer backups from the 2012 storms and also those hydraulically at risk from the design storm  Program details: 

13 Programs Available to Property Owners  DC Water Engineering Consultations  Purpose: Identify home improvements to protect against overland flooding  Eligibility includes Bloomingdale and LeDroit park residents with reported flooding in 2012 storms  Program details: 

14 Programs Available to Property Owners  DDOE Rain Barrel/Cistern program  Purpose: Detains stormwater to reduce sewer system overload  Property owners in the Northeast Boundary drainage area upstream of N. Capitol Street are eligible to receive a free rain barrel or cistern  Program details:  program program  DDOE Rain Barrel demonstration September 22, 2013 at the Bloomingdale Farmers Market (Big Bear Café)

15 Northeast Boundary Neighborhood Protection Project: Contact  McMillan Stormwater Storage project information  Tij Haynes  First Street Tunnel project information  Andrea Williams  DCCR  DCCR Website: dcwater.com/cleanrivers