Electrical and Optical Cables Installation at P5 What When How H. Breuker 20-7-04.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
L1 => L2 Optical Network Patch Panel Update Tim Durkin STFC RAL 03/04/2014.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Walls crates cables gas chambers electronics CERN adb.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
ELENA installation progress F. Butin / ELENA collaboration.
PIXEL CAEN Installation Status
Cables for the RE4 Upscope in CMS
Service channels between Tracker and PP1
Update of MVD services and requests
DCS: Temperature Probes
ELENA installation and commissioning status
- CT INSTALLATION PROCEDURE OVERVIEW -
DCS: Temperature Probes
CMS Area Working Group Meeting
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
TEC Services Status 30/12/2018 Nick Lumb.
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Front End Driver (FED) Crates and Racks +Tracker PSU racks
on behalf of Barrel RPC Collaboration
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Electrical and Optical Cables Installation at P5 What When How H. Breuker

Installation Tasks Cable Channels and Patch Panel 1 Cable Installation up to PP1 Cable Installation from PP1 to Balconies and the Service Cavern (USC) Cable Installation from UXC to USC Test Procedures to be defined CMS rule : Cables delivered for Installation must be fully connectorized !

Installation up to PP1 Optical Fiber Ribbons (4500) Aluminium MSC (1200) 2 Types TOB 1 Type TIB / TID Control Power Cables (200) 1 Type TOB 1 Type TIB / TID (Remember : TEC has its PP1 inside the Bulkheads)

“Main” Installation Electrical Cables (MSC or LIC) up to Balconies (2000, average Length 40 meters) Control Power Cables up to Balconies (350, average Length 40 meters) Optical Fiber Cables up to FED/FEC racks in USC (560, average Length 50 meters)

Optical Ribbons and Cables (FV) Opt. Cables from PP1 to USC : about 4 weeks with 4 Operators under “Supervision” (before TK arrival at P5 ?!) Installation into PP1 : with Inspection and Cleaning, 2 Operators, 1-2 weeks ? Ribbons from TK to PP1: 2 Operators per End, 2-4 weeks ? Connection at PP1: with Inspection and Cleaning, 2 Operators, 2-4 weeks ? Link Reflectometry Test and Connection at FED/FEC : 6- 8 Operators, 4 Ref. Stations, 4-8 weeks

“Additional” Cables Thermal Screen Power Cables (64) Thermal Screen Sensor Cables Alignment (TK Internal) Cables and Fibers Alignment (Link System) Cables and Fibers Heater Cables for Cable Channels (128) Pixel Electrical Cables (112) Pixel Optical Cables (36)

Cables between UXC and USC With the Decision to place the PSM’s in 120 Crates on the Balconies much reduced (proposed by R. Hammarstrom 1995) ! Power and Control of AC-DC Converters : (gen. CMS Infrastructure, not on TK) Ambient Sensor Cables (120) Interlock Signal Cables (120) Debug / PSU Status Display Cables (120) SY1527 Control Cables (20)

When ? CMS Assembly Schedule V34 Underground phase : Sept / Oct 06 and Dec / first half Jan 07 (cabling starts after arrival of TK at P5 ?!) G. Faber’ s Proposal (TCM March ) to start TK cabling on the + Z side 6 – 8 month’s before the arrival of TK at P5 First half of 2006 ! (Finish by end 2006)

How ? Estimate in Collaboration with CMS Integration Team and presented at (TCM Oct. 01) : Cabling between TK and PP1 about 2 Manyears (with available space for 4 People per end) Cabling and pipe installation outside the coil (32 channels per detector end and a total of 640 meters of channel) estimated at 15 Manyears Proposal G. Faber : Cabling of Central Barrel Detectors to be done by a Team of 11 People plus “Supervisor”. More than 1 Shift / day ? More people ?