Construction & Demo Waste. Landfilling Waste is a Big Deal A study shows 28.7% of waste placed in landfills is construction & demolition waste (C & D.

Slides:



Advertisements
Similar presentations
Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Advertisements

Department of Environmental Protection CLEAN FILL POLICY
Richard A. Ludt Waste Management Administrator Interior Removal Specialist, Inc. LEED ® AP.
Martin Grohman, LEED®AP Director of Sustainability, GAF Slide 1 Recycling Roofing.
Alexane LAMBELIN ESCIP (School Of International Business) France.
Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Materials. M1 LESSON M1: What are materials? This is a big question for a big subject. Materials are the basic components that make up pretty much everything.
Forensic Characteristics of Soil. Soil: The Forensic Definition Any disintegrated surface material, natural and/or artificial, that lies on or near the.
A Free, Confidential & Non-Regulatory Program Smart Waste Management alternatives for Iowa business & industry Reduce Reuse Recycle.
Creating a Circle Graph What are Circle Graph’s Used To Represent?
Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being.
Asphalt Pavement — America’s Recycling Leader Asphalt pavement is America’s most recycled product. Period.
Construction and Demolition Waste Management at UVM
CCDD Rules and Regulations Salvaging Chad Broege – Thelen Sand & Gravel.
Building for theBy Recycling Industrial Materials Industrial Materials Recycling Kimberly Cochran, PhD US EPA Office of Solid Waste AGC Building Division.
Is a Ton of Material Worth a Ton of Work? Stephanie Boyd, Williams College, Charley Stevenson, Integrated Eco Strategy,
Construction + Demolition Waste Trends Trends in Construction and Demolition Waste in Oregon AOR Construction and Demolition Recycling Forum March 15,
Sustainable Construction : UK perspective and West coast experience.
Of Massachusetts Department ENVIRONMENTAL PROTECTION MassDEP Healthcare Waste Reduction Initiatives New England Society for Healthcare Materials Management.
Concrete
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
PhD Candidate: Rıdvan AYDIN DEPARTMENT OF INDUSTRIAL AND SYSTEMS ENGINEERING An Integrated Marketing and Engineering Approach to Product Line Design with.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Recycling Roofing Materials in Canada 3 rd Asphalt Shingle Recycling Forum November 1 & 2, 2007 Chicago, Illinois Michael Clapham, NRCan.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Salvage: It’s like destroying things, Only a lot gentler Blake Rainville Thomas Pinello Eammon Coughlin Peter Connelly.
Miami Dade Resources Recovery Facility Operated By: Montenay Power Corporation.
Types of waste Waste = any unwanted item or substance resulting from a human activity or process Municipal solid waste = from homes, institutions,
Environmental Resources Unit A Understanding Recycling and its Relationship to the Environment.
Waste Characterization Studies and Initial MassDEP Analysis SWAC Meeting June 23, 2011 Jordan Macy, MassDEP.
Environmental Science: Toward a Sustainable Future Richard T. Wright
Deconstruction: A Local Government Model Wayne Fenton Orange County Public Works, Hillsborough, NC.
NEW RULES NEEDED TO GET TO ZERO WASTE R.V. Anthony Richard Anthony Associates, San Diego, California GRRN Recycling and Zero Waste Conference Devens, Massachusetts.
Recycling and Reuse Policy for C&D Waste Justin Green Program Director Build It Green!NYC.
TRB: Waste Management and Resource Efficiency Workshop July 2011 Tom Roick, Senior Policy Analyst Oregon Department of Environmental Quality Oregon DEQ’s.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
Renewable & Nonrenewable Resources Lesson 2.4: “Solid Waste Management”
Recycling involves processing used materials into new products in order to  prevent waste of potentially useful materials  reduce the consumption of.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
A “Zero Waste” Approach at the Del Mar Fairgrounds Nancy Strauss Resource Conservation Coordinator Del Mar Fairgrounds, Del Mar, CA, USA –
Post- Consumer Shingle Recycling Rooftop Recycling Boxborough, MA.
WASTE MANAGEMENT AND RECYCLING 1. SOLID WASTE MANAGEMENT 2.
Local Jurisdiction Adoption of Construction & Demolition Ordinances Local Assistance & Market Development July 11,
The Greening of the Rooftop Module 9 Other Green Roofing Options.
Construction and Demolition Waste Management at UVM.
1 Draft Final Safe Fill Regulations. 2 W hat’s new in Safe Fill Definition? Definition is short as a result of: – Due diligence procedures moved to existing.
Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
Second life of rubbish. Rubbish is big problem! In our life rubbish play bed role, because pollutes the air, and introduce other effects, which exert.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Presentation of Contractor’s Report “California 2008 Statewide Waste Characterization Study” CIWMB Strategic Policy Development Committee September 9,
Environmental Science CH. 24 Notes Solid and Hazardous Wastes.
Presentation to WRI-UNEP Meeting Building Connections for Sustainable Building And Construction by Iddo Wernick October 2, 2003.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
Oral Presentation Of Results Of The 2005 Targeted Statewide Waste Characterization Studies (FY BCP #2 “Update Statewide Waste Characterization”)
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
SNL/NM Pollution Prevention Critical Mass Achieved: C&D Waste Recycling at Sandia National Laboratories OFEE Symposium June 3, 2008 Ralph Wrons P2 Program.
Is it viable to recycle at Princeton?. What can be recycled? Construction Waste Carpet.
Incinerators, Landfills & Waste in the Commonwealth Local Environmental Action 2017 Northeastern University Kirstie Pecci, Senior Fellow (617)
The New Construction and Demolition Debris Waste Ban Amendments
WP 6A Existing/potential industrial symbioses
Disposal of waste concrete and bricks
Materials Management and Climate Change
Solid Waste Handling Standards
Waste Diversion Considerations for Northern BC
5 SWAC Agenda: May 2018 Introduction – Timm Schimke
Presentation transcript:

Construction & Demo Waste

Landfilling Waste is a Big Deal A study shows 28.7% of waste placed in landfills is construction & demolition waste (C & D waste). Thats 850 thousand tons per year. Of the top 10 components of the waste stream, 3 are C & D waste. Ranking number one is untreated wood followed by roofing shingles; third and last is a combination of rock, concrete and brick.

Other common C&D waste stream components include treated woods, drywall, PVC, ceramics and porcelain, glass and metals. Waste paints, solvents, sealers and adhesives commingled in C&D waste have greater potential for environmental impacts. These materials are specifically excluded from the definition for C&D waste under s.NR (50) [exit DNR], Wisconsin Administrative Code.NR (50) [exit DNR]

Like other recycling efforts, there are more management options for C&D debris that isn't mixed with other waste materials. C&D debris consists primarily of asphalt, brick, concrete, glass, metal, drywall and wood, all having recycling potential. Brick and cement block can be recovered for reuse, but more often they are combined with concrete and asphalt and are crushed to form the base for roadbeds and driveways.

Excess unpainted and untreated wood lumber at construction sites can be recovered for reuse as dimensional lumber, but most often it is chipped for use in landscaping and composting. Metals can be marketed to scrap metal dealers.

Some firms specialize in systematically dismantling structures in order to recover materials in the best possible conditions. C&D debris is a solid waste subject to the provisions in chs. NR , Wisconsin Administrative Codes.

What is Clean Fill? Wisconsin Administrative Code exempts the following C&D materials as clean fill provided the fill is not placed within a floodplain, wetland, surface water environment or critical habitat: brick, broken pavement, building stone, clean soil, concrete, reinforced concrete and unpainted or untreated wood.

Waste Recycling Resources Find recycling centers near you – DNR Pre-Demolition Checklist Waste Management –