Total Airport Management CARE Innovative Study

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Results - Experience of Participating Air Traffic Controller By T. Symmans EUROCONTROL.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Total Airport Management Systems
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
ATFM Priorities Evaluation Study Alison Hudgell QinetiQ
European ATFM From current operation towards the future Patrick Ky
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Airside Capacity Enhancement
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R.
Mission Trajectory Step 1 From planning to deployment.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Airspace Resource Allocation -Operations Impact Prof. R. John Hansman, Director MIT International Center for Air Transportation
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
SESAR Single European Sky Air traffic management Research
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
David Bowen Head of ATM Operations and Systems
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
1 LONG BEACH, CALIFORNIA. 2 Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport
Aena Zilina, Zilina, How to improve Airport Efficiency by means of CDM: LEONARDO Linking Existing ON ground, ARrival and Departure.
ICAO-IATA Cross-Border ATFM Workshop
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
Presentation of the TITAN project for the stakeholders.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
© 2011 LAIC Aktiengesellschaft © Ifield Computer Consultancy Limited 2013 ATRAK-AISS Aeronautical Information System Services.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
COLLABORATIVE DECISION MAKING
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
CEATS Central European Air Traffic Services
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Karim Zeghal EUROCONTROL Experimental Centre
OptiFrame WP1: Project Management
The Single European Sky Implementation Programme: SESAME
Aviation Innovation for Regional Integration
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Presentation transcript:

Total Airport Management CARE Innovative Study Institute of Flight Guidance Dr.-Ing. Henning Hartmann

Outline DLR Institute of Flight Guidance Background of TAM Context and Complexity of TAM Future Steps Henning Hartmann – EUROCONTROL CARE Study

31 research institutes and scientific/technical facilities at 8 sites 4 branches German-Dutch Wind Tunnel (DNW) European Transonic Wind Tunnel (ETW) Henning Hartmann – EUROCONTROL CARE Study Institute of Flight Guidance, Braunschweig

Capacity Development Plans Air Transportation Fast Time Simulations 3 Ideas Capacity Development Plans Today‘s Capacity Improved Capacity Delay 8 4 Increase of Traffic Flow Analytical Models 7 8 9 4 5 6 1 2 3 = + x : - CE/C Off CM RM M- % M+ Henning Hartmann – EUROCONTROL CARE Study Decrease of Average Delay Flow

Human Factors Human / Machine Cooperation Methods and Consulting Evaluation and Validation Exercises Henning Hartmann – EUROCONTROL CARE Study

Controller Assistance Concepts & Systems Runway Operations Management DARTS 4D Planner Arrival Management Departure Management TARMAC Ground Movement Management Henning Hartmann – EUROCONTROL CARE Study Airport and Airline Management

Information Management Operations Control Information Management in Systems of Systems Total Airport Management A-SMGCS Henning Hartmann – EUROCONTROL CARE Study BETA

Your Timeline to New Air Traffic Management Concepts, Tools, and Services Departure/Arrival Management Implementation Requirements Analysis Master Plan Implementation Preparation Validation Air-Ground Integration A-SMGCS Evaluation Environment Airport Management Henning Hartmann – EUROCONTROL CARE Study Application Areas

Turn-around-Cycle CFMU Sector Apron Stand TMA RWY Taxi Outbound Henning Hartmann – EUROCONTROL CARE Study Inbound ACC APP TWR AOC Apron

Punctuality depends on the expected capacity during main planning phase the impact and severity of effects if systems capacity degrades the awareness of the degradation-effects to capacity the existence of contingency plans the available reaction time the degree of redundancy the ability to implement plans Henning Hartmann – EUROCONTROL CARE Study

Phases of Flight Cruise Climb Descend Air Traffic Management Taxi Fly Taxi & Ramp Management Taxi Taxi Taxi Taxi Taxi Taxi Henning Hartmann – EUROCONTROL CARE Study Stand & Gate Management Dispatch Dispatch

Basic Management Areas Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound

Producer – Consumer Relations ATOT AOBT ATOT CTA CTOT EOBT Outbound Air Traffic Management Taxi & Ramp Management Gate & Stand Management Henning Hartmann – EUROCONTROL CARE Study AIBT Inbound ETO ETA EIBT

Planning Intervals and Horizons Outbound Henning Hartmann – EUROCONTROL CARE Study Inbound

Focus of first Step Outbound Inbound Henning Hartmann – EUROCONTROL CARE Study Inbound

Monitors along Turn-around-Cycle Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound 1. 2.

Concepts-of-Concepts for the Macroscopic View Meta Management Concept Meta Management Concept Air Traffic Management Concept Taxi & Ramp Management Concept Stand & Gate Management Concept Henning Hartmann – EUROCONTROL CARE Study

Macroscopic View Management Layer (MVML) MVML is an enabler for Global access to flight estimates Global access to flight plans and “ground plans” Global A/C flight/ground status and key-event tracking Global A/C planning status tracking Henning Hartmann – EUROCONTROL CARE Study

expected Benefits of a MVML Common sense and common awareness of planned vs. current flow Maximum coordinated traffic flow Optimum use of resources (Airspace, RWY, Taxiway, Stand/Gate) Predictability (Depth of focus concerning planning intervals) Stability of Operations req.s (looking up) Stability of Plans req.s (looking down) Punctuality minimised domino effects beyond the own area of responsibility harmonised, seamless transition on all planning intervals Henning Hartmann – EUROCONTROL CARE Study

MVML features comprehensive information flow optimal use of capacity no overload of the operators automatic coordination clear definition of the responsibilities common performance specification modular and upgradeable Henning Hartmann – EUROCONTROL CARE Study

Challenges of integration / optimisation the different orientations and philosophies of the stakeholders the complexity and diversity of the overall system and the dynamism of the current operation in conjunction with the integration of multi-phased planning intervals different time horizons a real-time operation evaluation is quite difficult for each operation centre especially because of the non-existence of common evaluation metrics an insufficient / non-existent synchronisation of planning intervals and cycle lots of “ad hoc planning” operation centres at the airport site Henning Hartmann – EUROCONTROL CARE Study

Air Traffic Management Monitor Example Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound 1. 2.

Flow Monitor DLR is developing measurement devices and analyses the results in order to evaluate modified procedures, new implemented management tools, the traffic situation Henning Hartmann – EUROCONTROL CARE Study

Henning Hartmann – EUROCONTROL CARE Study

The Consortium Henning Hartmann – EUROCONTROL CARE Study

Work Breakdown Structure Henning Hartmann – EUROCONTROL CARE Study

Time Schedule Henning Hartmann – EUROCONTROL CARE Study

henning.hartmann@dlr.de x.49.531.295.2525 Henning Hartmann – EUROCONTROL CARE Study

DLR site at Braunschweig Henning Hartmann – EUROCONTROL CARE Study DLR site at Braunschweig

Reality Simulation edc March 2003 Henning Hartmann – EUROCONTROL CARE Study edc March 2003

Simulation Complex National Simulation Cooperation ATTAS Experimental Cockpit Cockpit Simulator Apron & Tower Simulator ATMOS Henning Hartmann – EUROCONTROL CARE Study National Simulation Cooperation

Institute of Flight Guidance Henning Hartmann – EUROCONTROL CARE Study

BETA Validation Acceptance Test and Evaluation is an example for the operational benefit validation of an A-SMGCS performed by DLR together with 13 European partners. Henning Hartmann – EUROCONTROL CARE Study

A-SMGCS Validation Acceptance Test and Evaluation FIELD TESTING and REALTIME SIMULATIONS are used to analyse the technical performance, the operational benefit and different solutions in comparison of ATM procedures, tools and systems. Henning Hartmann – EUROCONTROL CARE Study