Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.

Similar presentations


Presentation on theme: "1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL."— Presentation transcript:

1 1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL

2 2 Projects l Experimental 4D Flight Management System (EFMS) l Airborne Human Machine Interface (AHMI) l Air/Ground Integration via Data Link

3 3 EFMS & AHMI Functionality l EFMS l Prediction of 4D trajectories l Trajectory negotiation with ATC over data link l 4D Guidance l Support advanced Airborne HMI l AHMI l Interactive Navigation Display l Graphical editing of trajectories

4 4 Project History l Activities of the Research Establishments l Arrival Managers - CENA, DLR l 4D Descents - DERA l Automated ATC - EEC l Conflict Detection - NLR l Advanced Cockpit Displays - DERA, NLR l GARTEUR Concept l Requirement for Experimental 4D FMS l Birth of PHARE

5 5 Difficult points to be resolved 1. Generic FMS & AHMI

6 6 Difficult points to be resolved 2. Software Engineering Aeronautical engineers software engineers Aeronautical engineers software engineers l Dispersed development sites l Software development tools l Common programming language l Need for software integration team Software engineers aeronautical engineers Software engineers aeronautical engineers

7 7 Difficult points to be resolved 3. Integrated ATM ? l Lack of system design l Air, Ground and Comms. projects developed independently l Lack of understanding between players l Air, Ground and Comms. developers incognisant of each others operational requirements, procedures and capabilities

8 8 Difficult points to be resolved 4. Data Link l Requirement l Flexible, high bandwidth data link l Available l Rigid data structure and protocols + complex data structures for air and ground interfaces + low bandwidth data link = poor performance l Essential to minimise the amount of data transmitted

9 9 Success ! l Demonstrated concept of an Air/Ground Integrated ATM system l Demonstrated capability of aircraft to predict, negotiate and fly 4D trajectories l Demonstrated Advanced AHMI concepts l Spin-off to other programmes l FREER Flight l AFMS/AATMS l Avenue

10 10 Open issues for the future l Data Link Bandwidth l Current applications for D/L require low/medium bandwidth l Need to define user requirements for the longer term l Benefits of 4D Navigation ? l Time control : Air or Ground ? l Increased capacity and reduced delays ? l Cost? l Implementation Plans l 5 year development + 7 year notification l 2012 earliest

11 11 How further work will be undertaken. l Develop close links between Navigation, Communication and ATC domains l CBA l Fast time simulations l Real time simulations l Safety studies l Pre-operational Trials l Arrival & Departure Managers l RNAV procedures in TMA l ARINC 702A developments

12 12 Acknowledgements l Scientists/engineers of the R&D Establishments l In Particular l Ronald Verhoeven, NLR - AHMI Project Manager l Reg Harlow, DERA - Major contributor l Bob Maddock, Eurocontrol - EFMS Production Manager l Roland Rawlings, Eurocontrol - Father of the EFMS Project and Airborne Programme

13 13 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL next


Download ppt "1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL."

Similar presentations


Ads by Google