1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
Federal Aviation Administration 1 Collaborative Decision Making Module 4 Building A New Trust Model.
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Results - Experience of Participating Air Traffic Controller By T. Symmans EUROCONTROL.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
1 The role of human in ATM automation: a key issue Alain Printemps head of DNA/CENA.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
1 4th FAA - EUROCONTROL AP6 Technical Interchange Meeting (TIM -4) Ground-based Decision Support for Conflict Detection and Resolution.
European ATFM From current operation towards the future Patrick Ky
Tomorrows Safety Case Steve Kinnersly. Slide serial no 2 © 2001 AEA Technology plc Todays Safety Case? A reasoned argument that a system is or will be.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Traffic Management and FUA integration
Air-Ground Data Link - DFS Strategy
Information Management – where next? Ken Reid Head of International Technical Relations EUROCONTROL.
International Air Transport Association 8.33 KHz Channel Spacing – Status, Lessons Learned and a Glimpse to the Future by Steve Zerkowitz Assistant Director.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
PBN Airspace Concept Process
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Can our ATM systems cope?
Computerised Air Traffic Management Tools - Benefits and Limitations OMAR BASHIR (March 2005)
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH COLLABORATIVE DECISION MAKING (CDM) Testimony before the National Civil Aviation Review Commission Testimony.
Air Ground Cooperation Summary 27 June 2003 ATM 2003 Budapest, June Rapporteur: W. Post AGC Sessions: Tuesday s Session 1: 2 papersChair:A.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASAS TN2 Final Seminar Paris, April 2008 LEGAL ASPECTS OF ASAS Dr. Francis SCHUBERT Head Corporate Development / skyguide.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Bringing an SMS Manual to Life Simon Roberts SMS Programme Lead UK CAA.
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Ground System implication for ASAS implementation
Workshop on preparations for ANConf/12 − ASBU methodology
Phase 4: Compelling Case for Change
Cockpit participation in
Traffic Management and FUA integration
Collaborative Decision Making “Developing A Collaborative Framework”
Presentation transcript:

1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA

# 2 # Results of R&D programmes like PHARE. l PHARE pre-dates the free flight concept l PHARE is firmly ground based l Advanced airborne capabilities are taken into account l Within its confines PHARE is as daring as the free flight concept itself l Proves what can be achieved by novel thinking and trust in computer support

# 3 # Will it will solve our problems l No single program can solve all problems l OCD recognises need for Managed Airspace l Managed Airspace will require advanced tools l PHARE should be right at home in Managed Airspace l Core area problems need to be addressed early on - PHARE is well positioned to do that

# 4 # Is it a threat to airlines autonomy? l Recognise OCD as necessary step beyond PHARE territory l Put PHARE in the context of Managed Airspace, do not claim that it is an overall solution l Refine PHARE results - CDM, SWIM, early free flight implementations l No threat to autonomy if done right!

# 5 # The concept of user- preferred trajectories l 3D versus 4D trajectories l The logistics of trajectory selection l User preferred trajectory = resource with dynamic, influences the bottom line l The appeal of users managing their own trajectories l Keep constraints to a minimum - each removed constraint is a step towards free flight!

# 6 # Separation assurance - ground based or air based? l See and avoid - the good old days l Growing speed and aircraft numbers, flight in all kinds of weather - ground surveillance and control becomes essential l Introduces inevitable inefficiencies (e.g. separation, trajectories) l ATC = some strategic and a lot of tactical l Inefficiencies can be reduced by modern ATC tools, but....

# 7 # Separation assurance ground based or air based? l Could we let the aircraft take care of most of the tactical aspects? l The electronic see and be seen and avoid environment l NASA and EUROCONTROL FREER shows it can be done l Where can decisions best be made?? l Not either or, but when and where one or the other. More R&D is needed.

# 8 # Practicalities of implementation l Implementation is only partly a technical challenge l Non-technical obstacles must also be addressed: l change of ATC culture l one airspace for ATM l rule making (ENPRM) l training l etc.

# 9 # Potential for cost saving. l Reduce delays, provide better trajectories l Savings must outweigh the costs of deployment and operation l Deployment decisions must be supported by appropriate cost-benefit analyses (deterministic or probabilistic) l The economic arguments against free flight - based on false premises and disregard time scales.

# 10 # Conclusions l Our view of the future = the OCD l No need to see PHARE as being in conflict with this, but l put in context (Managed Airspace) l continue R&D to explore the potential of free flight l PHARE has shown what can be achieved with an open minded approach

# 11 # Questions please!