1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1, 31.5.99.

Slides:



Advertisements
Similar presentations
ATC Simulation as an integral part of ensuring Operational Safety David Webb Air Systems.
Advertisements

Requirements Engineering Process
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
SIP/2012/ASBU/Nairobi-WP/19
Flexible Airborne Architecture
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
ESA Iris Programme: status
1 Study into IPS Suitability for Air-Ground ATM Communication Carsten Underbjerg, Ericsson Member of Helios Study Consortium European Organisation for.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Ground Human Machine Interface (GHMI): trends and the future
1 PHARE Demonstrations Overview of Results Marc Bisiaux PD/3 Project Leader Eurocontrol Experimental Centre.
1 Common Modular Simulator (CMS) : a PHARE system integration environment by J-R. Velten, CMS Project Leader CENA - ESV
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Validation & Measurement Methods for the PHARE Demonstrations R A Whitaker Validation Project Leader.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
RESULTS – EXPERIENCE OF PARTICIPATING PILOT By T R Price DERA Boscombe Down UK.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
1 4th FAA - EUROCONTROL AP6 Technical Interchange Meeting (TIM -4) Ground-based Decision Support for Conflict Detection and Resolution.
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
FAA / Eurocontrol TFM/CDM Technical Interchange Meeting
Whole Airspace ATM System Safety Case - Preliminary Study
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
CARE ASAS Validation Framework System Performance Metrics 10th October 2002 M F (Mike) Sharples.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Technical System Options
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Transition Towards Free Flight: A Human Factors Evaluation of.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Overview of NLR Free Flight project ‘97 - ‘99 Jacco Hoekstra
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Free Flight Deck Society of Automotive Engineers (SAE) S-7, “Flight.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
Lecture 5: Requirements Engineering
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Air-Ground Data Link - DFS Strategy
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
SESAR Single European Sky Air traffic management Research
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
1 WG-MISD Release of Radioactive Material (RRM) Work Stream Colin Hord, UK CAA Nigel Gait UK Met Office.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
ESA Iris Programme: status
CEATS Central European Air Traffic Services
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Soren Dissing - EUROCONTROL
Presentation transcript:

1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,

2 PHAREs Achievements l Outline the Achievements of PHARE l Specific results and lessons learnt are covered in other presentations l Spin-offs from PHARE for early implementation and further development l Highlight the successes, not hiding the items which did not work l Influence on the future ATM R&D in Europe l ATM R&D coordination

3 Potential ATM Research Issues as seen in 1990 l Airborne and ground systems interaction l The possible and acceptable level of automation support l The man-machine interaction l The influence of airspace organisation and l The procedures applied by ATC

4 Key PHARE Research Topics l Full use of the capabilities of the aircrafts systems, Development of the Experimental Flight Management System l Advanced automation support for controllers l Ground Human Machine Interface for operating such automation support l Use of datalink for the exchange of information between air and ground, in particular for the process of trajectory negotiation l Better meteorological forecasting to improve the trajectory prediction l Use of common methodology and standard tools/ procedures for validation.

5 The PHARE Programme l Progressive increased collaboration : ê Exchange of information and harmonisation of tools ê Formulation of common goals and exchange of results ê Definition and execution of shared and commonly financed activities l Merging of bottom-up and top-down, definition of a structured research programme l 11 Projects with defined timescale and budget frame l Basic PHARE Agreement complemented by a special agreement for each project

6 PHARE Studies l Medium Term Scenario Description of the PHARE Concept l Complemented by : Detailed operational specifications and scenario descriptions for each of the PHARE Demonstrations l Operational experiments within PHARE l The role of the man within PHARE l PHARE Air-Ground Data Exchange

7 Airborne Programme (1) Airborne Programme: two closely related projects Airborne Programme: two closely related projects 1. Experimental Flight Management System (EFMS) 2. Airborne Human Machine Interface (AHMI) EFMS Development é to demonstrate the capabilities of advanced 4D FMS é to negotiate User preferred trajectories é to guide the aircraft on that trajectory in space and time AHMI é to allow pilots (of live research aircraft) in a realistic cockpit environment to participate in the real-time simulation experiments

8 l EFMS and AHMI deployed in ê VFW (Advanced Technology Testing Aircraft) of DLR (Germany) ê CESSNA CITATION II of NLR (The Netherlands) ê BAC1-11 of NATS/DERA ê the Multi-Cockpit Simulator (Boeing 747) of EUROCONTROL Experimental Centre (Brétigny, France) l Airline pilots participated in ê specific evaluation of these systems ê PHARE Demonstrations l Overall great success ê Concept of 4D Navigation readily achievable ê Direct manipulation of trajectories appreciated ê Trajectory negotiation quickly assimilated Airborne Programme (2)

9 PHARE Common Modular Simulator (CMS) l Aimed at providing an environment for interfacing software components from the different partners and providing a platform for initial testing l Definition of an open modular architecture and Application Programming Interfaces l Prototype development of such common platform showing the technical feasibility of its approach, successfully achieved l Full application for PHARE Demonstrations has not been achieved l CMS project has contributed significantly to the present definition of a European ATM integration platform

10 PHARE Advanced Tools (PATs) set l Common Definition and Development of nine Advanced Tools by separate teams of the partners l No missing functionality or tool was found in the experimental trials, however some conceptual mismatches l The objective of each tool was achieved and all were used in one or the other PHARE trial l The objective to use all tools together in one tool-set in the PD/3 trials was not successfully achieved l The Demonstrations showed that some tools provided considerable advantages even without data link and 4D trajectories

11 PHARE Ground Human Machine Interface (GHMI) l Elaboration of Human-Machine Interface specifications by an international team of human factors specialist, engineers, operational experts l Advanced features used : Colour, windowing, features of standard software tools l Highly successful, major contribution to a quasi standard future HMI

12 PHARE Aeronautical Telecommunications Network (PATN) l Datalink is a key element of the PHARE concept l PHARE Demo 1 used enhanced Mode-S capabilities l PHARE Demo 2 used a dedicated high speed VHF data link l For PHARE Demo 3 an experimental Aeronautical Telecommunication Network (using the SATCOM subnetwork) was set-up l Disappointing performance of the SATCOM subnetwork l More work needs has to be done (and has started) using commercial data link to demonstrate their capabilities for future ATM applications

13 PHARE Meteorological project l Additionally contracted Partners : ê UK MET office ê METEO France l Successful development and test of a numerical prediction model using aircraft derived down-linked data to achieve an improved weather nowcast l Not used in real-time as component of the PHARE Demonstrations l Considered as a potential solution for future implementation

14 PHARE Validation project l Development of a common methodology l Production of recommended Measures of Merit for evaluating trials results l Production of analytical methods for assessing trials measurements l Successful application of these principles in the PHARE Demonstrations l Major contribution to the definitions in the EATMS Validation Strategy Document which is considered the basis for ongoing validation activities within the European ATM R&D

15 PHARE Demonstration Programme Development & Integration En-Route TMA Project Definition En-Route, 3 sites PD1 PD2 IOCPs, Development & Integration PD3 Development & Integration Validated Options for EATMS PD1+ PD2+ PD1++ P C/ T C PD3CT

16 PHARE Demonstration Results PD/1 & PD/2: Significant results. Potential for increase in traffic throughput/reduction of controller workload PD/3: Did not fully satisfy expectations. In general, the PHARE Demonstrations confirmed : ê feasibility of PHARE Concept ê assumption of high accuracy flying of 4D trajectories ê possibility of de-conflicting of aircraft up to about 30 min. ahead ê acceptability of automation tools ê benefits even in a mix of not fully 4D FMS equipped aircraft ê requirement for good performance data link for achieving full benefit

17 Spin-offs Spin-offs relate to the è progressive alignment of understanding on a possible advanced ATM concept è deliverables and products developed è orientation and co-ordination of ATM Research and Development

18 Influence on ATM R&D and Co-operation l European understanding and mind-setting l PHARE-X Association l Development of an R&D Strategy in support of EATCHIP l Set-up of European ATM R&D Programme Review Group, Prioritisation of R&D topics contributing to ATM2000+ Strategy l Stimulation of co-operation between the European Commission and EUROCONTROL l Co-operation with the US FAA and NAV Canada

19 Outlook l CARE (Co-operative Actions of R&D in EUROCONTROL) l Co-operation has value l Areas of improvement identified and to be applied in CARE l PHARE has found its successor l PHARE achievements will contribute to the success of CARE.

20 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,