MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI
Overview MT Continuum overview AIM toolset role Issues and concerns Process flow
MT Continuum Prototype Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE- conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: –SSP / contractors - Requirements Owners –NAWCTSD / AIM team - CPM/LO Module support –LSI, Inc. - ISD and self-paced content design/development
AIM Tool Usage Dedicated MT Continuum Prototype CPM and AIM I Rel 4.0 instances hosted in Orlando Local AIM I Rel 4.0 instances running at GD-AIS Pittsfield (SMEs) and at LSI Jax (ISD/CD) Significant progress made to date on bi-directional data exchange between LO Module and LSI Venus.net LDC authoring toolset Excellent feedback from MT Continuum team on enhanced functionality and performance needed in CPM & LO Module
AIM Tool Usage (contd) Status: –Per GD-AIS feedback, performance-enhanced version of AIM I Rel 4.0 running locally in Pittsfield and Jax as well as on Orlando server –Per GD-AIS feedback, significant enhancements made to AIM I Rel 4.0 storyboard functions/output –Several additional enhancements recommended by GD-AIS being analyzed by AIM team for incorporation into AIM I Rel 5.0 (Jul 10 delivery) –AIM team continues troubleshooting performance and reliability issues with Orlando AIM I Rel 4.0 instance
Issues/Concerns “End to end” surveillance/maintenance test on TLO/ELO occurred to: –confirm existing change impact identification functionality in CPM and LO Module –identify near-term updates –refine longer-term enhancements Test conducted by Mark Campbell and Mike Lueken w/ favorable results & identified critical issues to be addressed before full-rate production
7 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together
MT Continuum Process 8
Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development (Mark Campbell & Jamie Stewart involved in project) Potential “Poster Child” for ongoing NETC Continuum effort with all Centers Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content
FRM Inputs on Enhancements To be covered this afternoon during AIM/CPM Demo
Questions?