European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe (HARE) SpeakerRichard Papior OrganisationEUROCONTROL Date and venueJuly.

Slides:



Advertisements
Similar presentations
THE PROJECT LIFECYCLE National Contact Point
Advertisements

Project Quality Plans Gillian Sandilands Director of Quality
From Policy to Practice: Recommendations of the White Paper Ralf Hanatschek, International Bureau of the BMBF Ljubljana, June 13, 2008.
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
1 Welcome Summary - First visit Delhi Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
1 Establishment of Regulatory Framework April 2006.
1 Regulation. 2 Organisational separation 3 Functional Separation.
1 2 nd Shanghai, 19/02/06 Architecture for Next Generation Grids Kostas Tserpes, NTUA Shanghai, 20th of February 2006.
The Future of the Strategy with regard to the Outermost Regions - Brussels, 15 May 2008Note: document not legally binding 1 José RUIZ ESPI RTD.K.3 New.
The European Qualifications Framework (EQF)
1 32nd IGC Florence 2004 Luca Montanarella The European Soil Information System and its possible links with the 1:5,000,000 International Geological Map.
The Managing Authority –Keystone of the Control System
Pre-commercial Procurement of Innovation Building together innovative solutions Ulf Dahlsten, Director European Commission, DG INFSO.
ESafety Work Programme WORK PROGAMME 2004 The eSafety Steering Group, Brussels, 10 February 2004 The eSafety Steering Group, Brussels, 10 February.
Regions For All Ages Programme Presentation to Regions for Economic Change Conference – 25/26 January 2006 Workshop 3C- Working together through inter-regional.
Global ATM Operational Concept
PAN European Network Services (PENS)
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
The European Organisation for the Safety of Air Navigation WG-I #16 Meeting SESAR Security Tasks SpeakerLiviu POPESCU on behalf of Boleslaw GASZTYCH.
System of Systems (DRAFT) To be approved by the ICAO Council
ICAO Safety Management Systems (SMS) Course
1 Economic and Management Performance General Framework Presented by Keld Ludvigsen Director of Finance CAA Denmark and Chairman of ANSEP.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
HISPC-Illinois II The Public-Private Partnership Moves Forward on Privacy and Security.
0 - 0.
Addition Facts
Collection-level description & collection management: tool for the trade or information trade-off? Collection Description Focus Workshop 4 Newcastle, 8.
Collection-level description & the Information Landscape: users evaluate strategies for resource discovery Collection Description Focus Workshop 5 Cambridge,
Action Programmes KAG / HoPS / PAD Workshop 3 rd March 2014.
1 June 2014Page 1 The ICAO EUR Regional Aviation Safety Team (IE-REST) FSFI International Workshop, 14 May 2013 Nicolas Rallo Regional Officer, Safety.
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
WP6: Dissemination and exploitation Vladimir Meglič.
Presentation of the proposed Annex 19 – Safety Management
1 World Bank Support TFSCB STATCAP Monitoring systems / Core Welfare Indicators Questionnaire (CWIQ) Readiness Assessment.
Cellule Environnement – Santé / Cel Leefmilieu – Gezondheid / Zelle Umwelt- Gesundheit 1 Updated information on Life+ proposal « DEMOCOPHES » DEMOnstration.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
SAI Performance Measurement Framework
Aviation Safety Management at global, European and Member State level (ICAO, EASP, EASp, SSP, SMS and ESSI) Juan Anton Continuing Airworthiness Manager.
PBN ICAO HQ Activities Overview
AIM Operational Concept
Air Transport Association of Canada A presentation by John McKenna ATAC President and CEO.
A centre of expertise in digital information managementwww.ukoln.ac.uk QA for Web Sites Brian Kelly UKOLN University of Bath Bath, BA2 7AY
Nadia Konzali Project Coordinator, COSCAP-GS
HIGH COUNCIL FOR ECONOMY, INDUSTRY, ENERGY AND TECHNOLOGIES 1 Metrology policies to foster the competitiveness of industry J.F. Magaña.
Table of contents 1 Manual of Operational Procedures (MOP) 2
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting Zuzana Matlonova Brussels – April 11th, 2013.
Addition 1’s to 20.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 6 : Towards the Implementation of Quality.
European Regional Aviation Safety Group (RASG EUR)
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
DARIAH 2020: 25 Key Actions for a Stronger DARIAH by 2020
WG-I #16 Meeting SESAR Security Tasks
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AIM Global Strategy Air Navigation Procedures for AIM Seminar
Hans Dufourmont Eurostat Unit E4 – Structural Funds
The Fundamental Importance of Youth Work Recommendation CM/Rec(2017)4 of the Committee of Ministers to Member States on Youth Work Ms Antje Rothemund,
Presentation transcript:

European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe (HARE) SpeakerRichard Papior OrganisationEUROCONTROL Date and venueJuly 2006, Brussels

2 Helping AMHS Roll-out in Europe Purpose u Present background information on the HARE Programme u Recent activities u Current status

3 Helping AMHS Roll-out in Europe Where are we today with AMHS? CCITT X.400 SPACE Study AMC 2008 EUR AMHS Manual ECG ICAO SARPS ITUT X.400 ECIP Pan-European Objectives COM What goes here? Operational AMHS link Frankfurt-Madrid

4 Helping AMHS Roll-out in Europe What goes here? u SPACE recommendations including Common Facilities u Inter-Regional interoperability u Support for ANSP implementations u Safety, security and performance u Interoperability, testing and approvals

5 Helping AMHS Roll-out in Europe SPACE Recommendations Off-line Mgmt Centre Regional Helpdesk Testing / Training Facility SPACE Common Facilities Region Boundary COM Centres Regional XMIB Service Directory Services Security Forum Implementation Group Underlying Transport Network

6 Helping AMHS Roll-out in Europe HARE Programme HAREHARE Helping AMHS Rollout in Europe

European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe HARE Programme

8 HARE Programme Positioning CCITT X.400 SPACE Study AMC 2008 EUR AMHS Manual ECG ICAO SARPS ITUT X.400 ECIP Pan-European Objectives COM HARE Operational AMHS link Frankfurt-Madrid

9 HARE Programme Main Objectives Accelerate AMHS roll-out Helping ANSPs during their initial implementation and testing phases Provide support to ICAO Support the creation of a critical mass of AMHS implementations

10 HARE Programme Activities Support to States Users group Training facilities Security Forum Safety Requirements ICAO CMC/AMC Co-ordination Directory feasibility Test Tool Development Testing Infrastructure Approval process Testing Facility Security Requirements Support Functions Common Facilities Safety & Performance Testing & Approval Workshops PENS Co-ordination Regional XMIB HARE Programme

11 HARE Programme Work Packages Programme Management Quality Assurance Impact / Risk Analysis Programme Management Web Site Maintenance Representation at COM Team Participation in ICAO activities Publicity & Marketing Testing & Approval Organisation of Workshops Development of Test Tool Common Facilities Regional Directory Services (15) Regional XMIB Service (19) Maintenance of Ref docs Notes: Figures in brackets (n) are SPACE recommendation numbers Programme Initiation Support Functions Support to States Co-ordination with PENS (13) Safety & Security Certification Process Training AMHS Safety AMHS Security AMHS Reference Sys. Regional Testing Facility Co-ord with AMC (8, 14) IP Testing Infrastructure

12 HARE Programme Main Deliverables Common Facilities Testing and inter-operability facilities Safety and Security policies Roll-out support

13 HARE Programme Where we are today HARE is at the programme initiation stage Strategy paper published COMT35 supported, in principle, the establishment of a HARE Programme Recommended that Steering/Monitoring be performed by AFSG Steering Group Terms of Reference Discussed with AFSG

14 HARE Programme Co-ordination with ICAO AFSG EANPG Planning Group AMHS Management Centre HARE COM Team Steering Committee Operations Group

15 HARE Programme Steering Committee The Steering Group will review and give advice on the approval of the: Programme Management Plan and its subsequent updates; Programme Risk Plan and its subsequent updates; Resources required, and the impact of resource limitations; Programme Strategy document and the other key deliverables of the Programme; Progress and cost performance; Start of each programme phase.

16 HARE Programme Next Steps HARE proposal will proceed through internal appraisal and stakeholders consultation PMP and Business Case Risk management Steering Group to review PMP, etc.

European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe End