NASA A/G Communications Technology Assessment Study Technology Pre-Screening: Process and Evaluation Status April 6, 2005 Presented at ICAO ACP WGC-9 Meeting,

Slides:



Advertisements
Similar presentations
Turk Telekom - ETSI Workshop © ETSI 2010
Advertisements

TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
SIP/2012/ASBU/Nairobi-WP/19
1 GENERAL DYNAMICS Decision Systems Michel G, Gelinas Oct. 13, 2003 ACP WGC6/WP28 General Dynamics Decision Systems and Iridium Communications The Satellite.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
Flexible Airborne Architecture
Aeronautical Frequency Spectrum Management and ACP WG-F
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Joint FAA/Eurocontrol Future Communications Study (FCS)
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Outcome of Phase II Activities Presented at ICAO ACP.
ACP WG B Work Program Frequency Planning Criteria
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
VDL Mode 3 Cosite Interference Testing Summary WP-WGB1701A Attachment A International Civil Aviation Organization 17th Meeting of Aeronautical Communications.
ICAO Aviation Considerations for Internet Mobility Services ICAO WG N-1 Meeting #5 Montreal, Canada November 7-10, 2005 ACP/SWGN1-5 th meeting FL 502.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
Phillipe Renaud and Nikos Fistas
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Future Communications Roadmap
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Regional Preparatory Workshop for the ITU WRC-2015
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Technology Pre-Screening: Process and Evaluation
FCS Technology Investigation Conclusions and Recommendations
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Next Generation Air Transportation System Institute 1500 K Street, NW – Suite 500 Washington, DC NGATS Institute 2007 Annual Meeting June 21, 2007.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Request For A New 3GPP2 TDD TSG Eric Jacks LinkAir Communications Santa Clara, CA 3GPP2 SC Meeting Sapporo, Japan Oct. 31, 2002.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Workshop on preparations for ANConf/12 − ASBU methodology
Additional aviation spectrum allocation for AM®S
Technology Pre-Screening: Process and Evaluation
Workshop on preparations for ANConf/12 − ASBU methodology
Mini Global Demonstration
Regional Preparatory Workshop for the ITU WRC-2015
Aeronautical Communications Global Needs Global Solutions
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
ICAO Air Navigation Bureau
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002
SPECTRUM STRATEGY & VISION
Joint FAA/Eurocontrol Future Communications Study (FCS)
ICAO ACP Working Group M Iridium Sub Group Overview
Presentation transcript:

NASA A/G Communications Technology Assessment Study Technology Pre-Screening: Process and Evaluation Status April 6, 2005 Presented at ICAO ACP WGC-9 Meeting, Montreal Canada NASA Glenn Research Center/James Budinger ITT industries/Glen Dyer, Ron Bruno

2 Briefing Outline Context of the Study Candidate Technologies Families Technology Pre-Screening Process Evaluation Criteria Development Process Impact of Recent Direction Concluding Comments

3 Context of the Study Aeronautical air-to-ground VHF channel capacity for Air Traffic Management (ATM) is reaching saturation –Most severe in Europe and parts of the United States Various proposals to address this problem have been offered and approved independently; none has achieved global endorsement ICAO is seeking a common, global solution through the Aeronautical Communications Panel (ACP) The FAA and Eurocontrol initiated a bi-lateral study of the problem with the support of NASA; study to provide major input to ICAO ACP in its search for a global solution –Action Plan 17 (AP-17) provides the study terms of reference and outlines a research plan –This Technology Pre-screening Study is Task 3.1 as defined in AP-17

4 Technology Identification In order to identify all technologies that may be applicable to aeronautical communications, a three pronged approach was used for technology identification: 1.A survey of widely used and successful commercial and military technologies was conducted to identify technologies that offered potential value to A/G communications 2.NASA released two Requests for Information soliciting technology candidate inputs from industry 3.Technology candidates previously identified by the ICAO ACP WG-C were included in this study In all, over 50 technology candidates were identified in this process

5 Technologies Considered Technology FamilyCandidates Cellular Telephony Derivatives TDMA (IS-136), CDMA (IS-95A), CDMAone (IS-95B), CDMA2000 1xRTT, W-CDMA, TD-CDMA, CDMA2000 3x, CDMA2000 1xEV, GSM/GPRS/EDGE, TD-SCDMA, DECT IEEE 802 Wireless Derivatives IEEE , IEEE , IEEE , IEEE , ETSI HIPERPAN, ETSI HIPERLAN, ETSI HIPERMAN Public Safety and Specialized Mobile Radio APCO P25 Phase 1, APCO P25 Phase 2, TETRA Release 1, TETRAPOL, IDRA, IDEN, EDACS, APCO P34, TETRA Release 2 (TAPS), TETRA Release 2 (TEDS), Project MESA Satellite and Other Over Horizon Communication SDLS, Connexion by Boeing, Swift Broadband (Aero B-GAN), Iridium, GlobalStar, Thuraya, Integrated Global Surveillance and Guidance System (IGSAGS), HF Data Link Custom Narrowband VHF Solutions VDL Mode 2, VDL Mode 3, VDL Mode 3 w/SAIC, VDL Mode E, VDL Mode 4, E-TDMA Custom BroadbandADL, Flash-OFDM, UAT, Mode-S, B-VHF (MC-CDMA) MilitaryLink 16, SINCGARS, EPLRS, HAVEQUICK, JTRS OtherAPC Phone (Airphone, AirCell, SkyWay)

6 Pre-Screening Process FAA/Eurocontrol Decision Process

7 Minimum Threshold Criteria A very large number of technologies were identified in the study and, of necessity, some were culled from further consideration without a detailed analysis being performed. The culling rules were: –A proprietary technology was eliminated if an another technology in the family that is based on an open standard provides comparable value –An immature technology was eliminated if a more mature technology in the family offered comparable value –An older (near end of life) technology was eliminated if a successor mature technology in the family provided equal or greater value with no expected cost impact –A technology that inherently relies on unprotected spectrum [i.e., not AM(R)S or AMS(R)S] was eliminated –A technology was eliminated if another technology in the family provided comparable value and was more widely implemented (sparse implementation) –A technology was eliminated if it could not support a practical transition

8 Evaluation Criteria Development Process Operational Concepts & Requirements Team Requirements, Technology & Transition Analysis Team (RTTA) Technology Assessment Team ICAO & Other Consensus Documents RTTA Evaluation Criteria ICOCR ICAO & Other Consensus Documents Final Evaluation Criteria Initial Evaluation Criteria Eurocontrol Coordination Eurocontrol Coordination Eurocontrol Coordination Ground Sys Int.Issue Papers System Arch.Issue Papers Aircraft Co-SiteIssue Papers AffordabilityIssue Papers SecurityIssue Papers Safety – Cert.Issue Papers

9 Consensus Evaluation Criteria Technology pre-screening evaluation criteria were derived via a consensus process –Criteria Timeline July – ITT Synthesizes evaluation criteria from 11th ICAO Air Navigation Conference (Sept/Oct 2003) recommendations August – ITT and QinetiQ work towards refining the evaluation criteria, and developing a consensus set of criteria. In parallel, the FAA RTTA team is developing a set of evaluation criteria September – A mapping between the ITT and QinetiQ consensus criteria and the independently developed RTTA criteria is developed and presented to the FAA. Mapping shows substantial overlap, and highlights missing criteria in the ITT and QinetiQ set, which are adopted. Evaluation criteria are baselined, and the FAA RTTA team begins work of defining evaluation metrics October – Through two rounds of FAA comments, ITT and QinetiQ replies, and then a round table discussion between ITT, NASA and the FAA RTTA team, evaluation metrics are decided and harmonized. In the process, some of the evaluation criteria are modified. An additional criteria, transition is adopted, and one criteria, COTS Leveraging, is eliminated. The evaluation criteria and metrics are placed under configuration control on October 7, 2004

10 Evaluation Criteria Overview Category Evaluation Category Description Criteria Communications Capabilities Communication capabilities needed to support current and emerging ICAO ATM concepts 1 Meets Voice Needs 2 Meets Basic Datalink Needs 3 Meets Expanded Datalink Needs Maturity for Aeronautical Environment Technical maturity as well as the recognition for the safety assurance required for aeronautical standardization and certification 4 Technology Readiness Level 5 Standardization 6 Certification Cost Cost of infrastructure used by the service provider as well as the cost of aircraft avionics equipage 7 A/G Communications Infrastructure 8 Avionics Other Availability of suitable AM(R)S spectrum, support for security, and practical accommodation of transition 10 Spectrum Protection 11 Security 12 Transition

11 Future Roadmap VHF DSB-AM / VDL Mode 2 Technology that uses VHF more efficiently and are compatible with in-band transition Current A/G InfrastructureFuture Options for A/G Infrastructure Technology that uses DME spectrum Technology that uses MLS spectrum Technology that uses AMS(R)S (Satellite) Roadmap should indicate how the chosen technologies are matched to the spectrum options

12 Impact of Recent FAA/Eurocontrol Direction Consider expansion into VOR band: –No effect on evaluation criterion for spectrum suitability (#10) –Expect more significant risk in securing communications application in VOR radionavigation spectrum than in DME band –Expect minor change from findings for VHF band only Leverage existing equipage as much as possible: –Direction has impact on ground infrastructure as well; Consider minimizing life cycle cost of equipage and infrastructure –No effect on evaluation criteria for cost of A/G communications infrastructure (#7) and avionics (#8), and technology readiness (#4) –Expect minor change in findings for VHF band, no change in others Consider voice and data requirements separately: –No effect on evaluation criteria for meeting voice (#1), basic data (#2) and expanded data needs (#3) –Expect changes in findings for all bands

13 Concluding Comments NASA/ITTs pre-screening findings have been shared with and closely reviewed by the FAA and Eurocontrol/QinetiQ –Significant agreement was reached on common candidates based on application of all the consensus evaluation criteria The consensus pre-screening findings have been shared with Russ Chew, FAA Chief Operating Officer and Victor Agaudo, Eurocontrol Director General –The findings were based on ability of candidate technologies to meet BOTH voice and data needs –Russ and Victor have requested that FAA and Eurocontrol analyze the voice and data capabilities of the candidates separately –Additional analysis will begin in April 2005 using the existing consensus evaluation criteria with this new direction