Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
By: Michael A. Cirillo, Vice President, Air Traffic Organization, System Operations Services Date:March 27, 2007 Federal Aviation Administration Performance.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
1 Measuring performance by meeting expectations Capacity Cost-effectiveness Efficiency Environment Flexibility Global interoperability Access and equity.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
PLANNING FOR A GLOBAL ATM SYSTEM
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
ICAO Aviation System Block Upgrade Executive Briefing:
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ICAO: Global Harmonization Plan
Continuous Climb Operations (CCO) Saulo Da Silva
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
SIP/2012/ASBU/Nairobi-WP/6
International Civil Aviation Organization European and North Atlantic Office ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
Can our ATM systems cope?
An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
Safety Information Sharing ICAO’s Perspective John Illson Air Navigation Bureau Flight Safety Foundation – International Air Safety Summit 31 October 2013.
2015 IFATCA regional meeting October 2015 Accra An Enabling Environment for Air Navigation Lindi-Lee Kirkman Manager Safety & Flight Operations Africa.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
International Civil Aviation Organization Global Runway Safety Symposium ICAO’s Harmonization Initiatives John Illson Air Navigation Bureau 25 May 2011.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
International Civil Aviation Organization Dynamic wake turbulence separation Saulo da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Users’ Perspective of PBN Achieving Improvements
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
SIP/2012/ASBU/Nairobi-WP/19
Measuring performance by meeting expectations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Continuous Climb Operations (CCO) Saulo Da Silva
Global ATM Operational Concept
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Basics of RNP.
Session – 4: Existing ICAO Standards relating to Air Traffic Control
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
ANConf/12 – Agenda H. Sudarshan
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Air Navigation Bureau
Hands-on Exercises Performance Based Planning and use of IFSET
RNAV and RNP Strategy in Japan
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Towards a Performance Based ATM
SAM Regional Seminar/Workshop
Dave Behrens Director, Infrastructure Strategy IATA
Presentation transcript:

Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt

2 Transition Strategy

3 Transition – Near-term

4 Transition – Medium-term

5 Transition – Long-term

6 The Global Transition Roadmap

7 Efficiency Objective: Implementation of a seamless, global air traffic management system that will enable aircraft operators to meet their planned times of departure and arrival and adhere to their preferred flight profiles with minimum constraints and without compromising agreed levels of safety. Supported by Global Plan Initiatives that: Maintain Operational Safety Security Improve System Operational Performance Minimize Costs Enable Transition Harmonize Global Interoperability Environment Ensure Separation Physical Security Infrastructure Time value of benefit CommunicationsNoise Information Security Equipage Transition O&M Scalability Cost benefit equity Navigation Surveillance Databases Data exchange Emissions Capacity Delay Access Flexibility Efficiency Predictability Performance Based Regulation Efficiency Metric Elements

8 Thanks for your attention !!