Foreign Aid and LDC Administration Comparative and Multilateral Aid: The Intersection of Policy, Projects and Implementation.

Slides:



Advertisements
Similar presentations
Introduction to Monitoring and Evaluation
Advertisements

Project Planning and the Planning Cycle PIA 2501.
Ray C. Rist The World Bank Washington, D.C.
Progress in PRS Implementation: The Republic of Serbia Presented by Ivana Aleksić, Team Manager Poverty Reduction Strategy Implementation Focal Point Deputy.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Comprehensive M&E Systems
Chapter 2 Succeeding as a Systems Analyst
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
The Logical Framework: “LogFrame” Verifiable Indicators and the Contract.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
1 Module BASICS OF PLANNING. 2 Content Overview Planning principles Gantt charts.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
Dr. G. Johnson, Program Evaluation and the Logic Model Research Methods for Public Administrators Dr. Gail Johnson.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Development and Implementation of a National Multisectoral Output Monitoring System (SHAPMoS) for HIV Responses in Swaziland:  Challenges and lessons learned.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
The Targeting Outcomes of Programs (TOP) framework.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
DEVELOPING AND IMPLEMENTING POVERTY REDUCTION STRATEGIES AND NATIONAL PLANS A Summary of First Day Proceedings East Asia Forum on National Plans as Poverty.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Defining and Directing Public Administration toward Performance Excellence Dr. Donald Klingner International Conference on Administrative Development Riyadh,
PIA 2096 Foreign Aid, Foreign and Security Policy And Development Management Week 6.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
MARKETS II M&E FRAMEWORK AND CHALLENGES Joseph Obado.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
LIBERIA THE BIG PICTURE Can the Agency tell the truth about results? Can the participants tell the truth about results?
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
LOGICAL FRAMEWORK by Lorelyn T. Dumaug.
Assessing the Capacity of Statistical Systems Development Data Group.
Module 1 Session 1.3 Visual 1 Module 1 Understanding the Project and Project Management Session 1.3The Project Preparation/Analysis Process and the Hierarchy.
SacProNet An Overview of Project Management Techniques.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Alternatives to Privatization and Assessing Contracts October 5, 2004.
1 Second Regional Workshop on gender and Poverty Reduction Strategies, September 2003, Siem Reap Gender responsive costing and budgeting Nalini Burn.
1 Enabling environments for technology transfer under the UNFCCC Daniele Violetti Programme Officer, Technology Climate Change Secretariat (UNFCCC) UNFCCC.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Belgrade, Donor Coordination Meeting Belgrade, 30 th of November 2011.
Africa Center for Strategic Studies Tuesday, 10 July 2007 Africa Center for Strategic Studies Dr. Louis A. Picard Senior Research Fellow AFRICOM: The Three.
South African – Flemish (SAF) Development Programme DGOS-attachés 2003 VVOB.
Project Planning and the Planning Cycle PIA 2501.
Managing Public Budget to Facilitate Economic Growth and Reduce Poverty Public Expenditure Analysis & Management Staff Training Course May , 2001.
Contracting Out. Relationship Between Contracts and Projects  Contract Legally enforceable document Purpose  Judicial review in event of a disagreement.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Business Plug-In B15 Project Management.
Structural Adjustment, Policy Reform and Public Private Partnerships
Foreign Aid The Process of Policy And Implementation.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
PIA 2734 Privatization and Contracting Out: The Knowledge and Skills Base.
What is project management?
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
FOREIGN AID, FOREIGN POLICY AND DEVELOPMENT MANAGEMENT Louis A. Picard PIA 2096/PIA 2490 Week Seven.
The United States Foreign Assistance Reforms: An Overview.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
S3.1 session day 5 2 Programme management download resources from Approved by the Advisory Group: Programme management Programme and project.
Introduction to Monitoring and Evaluation. Learning Objectives By the end of the session, participants will be able to: Define program components Define.
PIA 2574 African Development Seminar. The Economy: Markets and Planning.
Treasury of the Republic of Kazakhstan
Project Cycle Management
TechStambha PMP Certification Training
Monitoring and Evaluation using the
Foreign Aid and LDC Administration
Africa Center for Strategic Studies
4.2 Identify intervention outputs
Helene Skikos DG Education and Culture
Curriculum Coordinator: Marela Fiacco Date : February 29, 2015
Ministry of National Economy of The Republic of Kazakhstan
Integrating Gender into Rural Development M&E in Projects and Programs
Presentation transcript:

Foreign Aid and LDC Administration Comparative and Multilateral Aid: The Intersection of Policy, Projects and Implementation

Three Page Proposal 1. Introduction and Project Statement 2. Literature Review 3. Major Hypotheses 4. Methodology Due: November 3, 2011

“Projectization”

Overview of Session Legacy Themes The Changing Environment of “Projectization” The Project: A “quick and dirty” Introduction

LEGACY THEMES “Hearts and Minds” vs. Samuel Huntington

Quote: Review- The “Legacy” of 1975 ‘AID!’ the farmer cried. Look at you.... He pointed, sweeping his finger from one charred remembrance of a home to another. ‘Here is your American AID!’ The farmer spat on the ground and walked away.[i][i] [i] Neil Sheehan, A Bright Shining Lie: John Paul Vann and America in Vietnam (New York: Random House, 1988), p [i]

Winning Hearts and Minds: Gun Purchase Program in Vietnam

Vietnam: My Lai Massacre

CORDS: Origins of Project Mode in Bilateral and Multilateral Activities In May 1967 an organization known as CORDS—Civil Operations and Revolutionary Development Support—was formed to coordinate the U.S. civil and military pacification programs. A unique hybrid civil-military structure directly under general William C. Westmoreland, the COMUSMACV, CORDS was headed by a civilian, Ambassador Robert W. Komer, who was appointed as Westmoreland’s deputy. Current Version: “Three D’s” or Whole of Government Approach to Foreign aid. Provincial Reconstruction Teams VIDEO

Domestic Management Systems and International Influences Historical periods of budgetary and fiscal management: : Basic Needs : Structural Adjustment After 1991: Collapse of the Soviet Union “Clash of civilizations” September 11, 2001

Hearts and Minds- Huntington’s Theory

Samuel P. Huntington, (April 18, 1927 – December 24, 2008)

II. The Changing Environment of “Projectization” From Structural Adjustment to a Post- September 11 Stability?

Review: Second [and First] World as New Debtors Chad vs. Russia Transitional States Rise of Asia and blocks Crisis in Asia and the return to debt management Debt Crisis in U.S. and Europe: Different Rules

Chad: A Symbol of Ethnic Conflict

Wall Street: 2011

Foreign Aid’s Future IMAGE

Development of Underdevelopment Reminder- Changing Terms Non-Western World Developing areas or nations Third World Poor Countries? Southern Tier States LDCs UDCs Transitional States? Immerging Markets

Foreign Aid and Technical Assistance: Factors to Consider The utility of the rational actor model for foreign aid Impact of culture and values on Foreign Aid Impact of Intellectual systems and ideologies influences and beliefs Impact of Standard Operating Procedures The Impact of the Project Model on the Foreign Aid Process

The Context of Project Management: Debates The Importance of the Market The end of the Command Economy? The concepts of market and productivity International systemic hegemony and competition within international markets Complementarity problem and origins of capital After Fear of Market failure?

World Markets

Market Failure Models

Foreign Aid vs. Technical Assistance: The Project Mode Environment- Four Themes Current bias to international trade Governance and Nation Building Back to the future Get the LDC economy back to the 1950s Dependent development Is it dependent and is it development?

As Foreign Policy?

Foreign Aid: Enter the Project Mode, circa the mid-1980s THE PROJECT CYCLE: A QUICK AND DIRTY INTRODUCTION

The Project Mode 1. Limited Time 2. Limited Tasks 3. Limited Funding

The Project Mode: Not Simple

The Goal?

Mini-Discussion What will you be doing two years from now?

Monday Morning 8:15 1. Get a cup of coffee (If you drink it) 2. Start your computer 3. Check your 4. What then?

The U.S. Foreign Aid Process: Development Assistance Programs (DAPs) Office of Management And Budget (OMB) Evaluation Ex-Post Facto Evaluation Implementa- tion Pre- Implementa- tion Project Paper (PP) Project Review Paper (PRP) Project Identification Document (PID) Field of Concentration Strategy (DAPII) Country Program Strategy (DAPI) Prior Evaluation Operational Year Budget (OYB) Appropriation Congressional Presentation (CP) Budget Submissions Ongoing Projects Host Country Legis- lation Foreign Policy LDC Needs Agency Policy Global Sector Strategies Regional Strategies Research Strategy Management Objectives Financial MANAGEMENT Programming INFORMATION Management Reports Implementation SYSTEM External Needs Program SupportData Bank (CPDB, PAIS, DIS, ESDB) Personnel Administration SupportDatabase for Future Decisions, Policy Lessons Learned Evaluation Criteria Project Reporting Project Performance Tracking (PPT); Financial Reporting Planning Budgeting Design Approval Implementation Evaluation Reporting

Blueprint Approach to Development Planning Pilot Project Researchers Before-After Surveys Planner Administrators Target Population Evaluation Researchers Actions Project Blueprints Actual Change Versus Targeted Change Tested Models

The Project Cycle Analysis--collection of: Social Analysis targeted groups: women, minorities, indigenous peoples Economic Analysis--Cost Benefit Institutional Analysis Sustainability Organizational Requirements Recurrent Cost Implications Human Skills Needed Social Acceptance

Source: Project Management System, Practical Concepts, Inc., Washington, DC Project Objectives Achieved 3. Evaluation2. Execution 1. Design The Project Cycle

Design Identifying nature of problem and possible solutions--specific needs and desired changes Appraisal (Mandatory) data needed to prepare project plan

The Project Cycle Analysis--collection of: Prediction Selection of preferred alternatives Changing the parameters?

The Project Cycle The Logical Framework: (LOGFRAME) Analysis--collection of Information: 1. If-then conditions 2. AID moved away from logframe but not the Logical Model 3. Was replaced by a system based on identifying Strategic Objectives, Intermediate Results, Measurable Indicators, etc. 4. That system was recently "de-emphasized.“ 5. AID mission requests for funds were tied to promises of specific results 6. Results Framework system is "under review."

Logical Framework Performance Networks Practical Concepts, Incorporated Project Objectives Achieved 3. Evaluation2. Execution 1. Design Evaluation SystemReporting System Evaluations assess performance against plans and analyze causal linkages Progress indicators and formats for communicating project information Networks display performance plans over time ACHIEVEMENT EXCEPTION Project Management System Provides Tools to Support all Stages of the Project Cycle

Preparation of Documents: Donor – USAID-A Paper Mill Country Strategy Paper (DAP) Concept Paper (Sector) Country Context Paper Technical Proposal Project Identification Document (PID) Project Paper (PP) Program Agreement

PP (USAID) (PP = Project Paper) Program Agreement (Donor to Country) Technical Proposal (Contractor to Donor) Country Context Paper (Contractor to Country) Implementation Documents

The Project Cycle

Implementation Carrying out actions planned Personnel: local (and foreign) Physical and organizational Needs Budget VIDEO: THE REST OF THE STORY

Ten Minute Break

Fragile Support Systems

The Project Cycle Monitoring and Evaluation: Linked to End of Contract and Verification of Objective indicators Understanding what has happened and assessing changes and quality of change Issue: sustainability regarding follow-on within the country and replicability from one country to another

Monitoring and Evaluation Nature of Data: Interview vs. survey Impact vs. Delivery Seat of the pants observation "the old quick and dirty"

The problem of Measuring Project Goals: Goals are to be limited and bounded Specific activities are to be clearly defined and achieved Short run success leads to successful evaluation Short-term loop is five years Implementation may not be Success

Monitoring and Evaluation Nature of Data- Judgment: Evaluation vs. Assessment Two views:  a. Learn from experience  b. Judge performance Problem: judgment requires clear goals, in contradiction with learning Problem: power of the expert

Monitoring and Evaluation Nature of Data Evaluation is a donor requirement External activity Targets blueprint activity (CPA) Critical path analysis (Time based action) PERT chart (Project Evaluation Review Technique) very technical, programmed Evaluation often the need for more action

PERT Chart

Monitoring and Evaluation Nature of Data: Evaluation as an end product: Separate from implementation Action pre-determined in design prior to evaluation Separates evaluation from the on-going activity

Monitoring and Evaluation Issues Problem with Evaluation concept Implementation suggests a finished product Bureaucratic action is ongoing Part of larger system with ambiguous boundaries Assessment Ongoing, part of implementation process

End of Project Status (EOPS) Are of great importance and are primary target of project efforts and discussion Projects are usually very complex It is common to find that no single indicator is sufficient to describe the project achievement completely

End of Project Status (EOPS) In determining EOPS we apply following principle: If all EOPS conditions are satisfied, then there would be no credible alternative explanation Except the purpose of the project (and the contract) has been achieved Good project design will include the conditions that demonstrate successful achievement of the Project Purpose

End of Project Status

End of Project Status (EOPS) Example PROJECT PURPOSE IN THE DEVELOPMENT OF AN OIL FIELD: Export oil EOPS 50,000 Barrels of crude/day transferred to tankers at nearest port; Quality of crude produced is competitive with that currently sold on world market. To verify, one needs a) the purity of oil, b) the world price, c) price sold, d) amount sold

Oil Field: EOPS

M&E During Project Execution Design ExecutionEvaluation LOGFRAMES SPECIAL RESULTS MONITORING & EVALUATION REPORTS FINANCIAL EXECUTION PLANS (FEP) ALERT PERIODIC & MID-TERM EVALUATIONS Purpose PHYSICAL EXECUTION PLANS (PEP) M & E Plan

The Logical Framework NARRATIVE SUMMARY INDICATORS MEANS OF VERIFICATION ASSUMPTIONS GOAL PURPOSE OUTPUTS INPUTS

Example of Project Objectives GOAL Illnesses caused by impure drinking water reduced. PURPOSE Hygienic practices adopted by the rural population. OUTPUTS Clean water provided to 60% of villages in Northwest Region. Health workers trained. ACTIVITIES [or Inputs] Measured in Money

How it Looks

Example of Project Objectives ACTIVITIES 1.1. Choose sites for wells Organize village workers 2.1. Develop curriculum Recruit health workers Conduct training.

The Logical Framework NARRATIVE SUMMARY INDICATORS MEANS OF VERIFICATION ASSUMPTIONS GOAL PURPOSE OUTPUTS INPUTS

Horizontal Logic of the Logframe NARRATIVE SUMMARY INDICATORS MEANS OF VERIFICATION ASSUMPTIONS GOAL PURPOSE COMPONENTS ACTIVITIES

The Means of Verification Hierarchy of Objectives IndicatorsSources of information Method for data collection Agency responsible for data collection, analysis, and dissemination (information producer) Method for analysis of data FrequencyApplication (expected uses) Reporting format (letter, written report, oral presentation, etc.) Circulation (expected information users) Objectives Observable Verifiable Indicators Means of Verification (MOV)

Horizontal Logic of the Logframe NARRATIVE SUMMARY INDICATORS MEANS OF VERIFICATION ASSUMPTIONS GOAL PURPOSE COMPONENTS ACTIVITIES

Physical Execution Plan 1. Component a. Activity b. Activity c. Activity 2. Component a. b. c... 7 units 3 units Construction Unit Technical Support Unit Component/ Activities/Tasks TimeProductResponsibility

Appropriate Technology

Some of our Authors

Janine Wedel, Born, 1948

Paul Collier, Born U.K. July 6, 1984

Bob Woodward, (Born March, 26, 1943) Veil

Graham Greene ( )

Michela Wrong, Born U.K Video: On Corruption Video: On Corruption

Next Week Foreign aid Dealing with Donors Coping with Clients