Preparation of requirements for the production of Draft Plan Borislav M. Rackov ITU/BR/TSD/TPR Preparation of requirements for the production of Draft.

Slides:



Advertisements
Similar presentations
11/2/2013 2:02:38 AM 5864_ER_FED 1 Importing Certificates into Lotus Notes R6.
Advertisements

MFA for Business Banking – Security Code Multifactor Authentication: Quick Tip Sheets Note to Financial Institutions: We are providing these QT sheets.
MFA for Business Banking – Security Questions with Reset Multifactor Authentication: Quick Tip Sheets Note to Financial Institutions: We are providing.
Linked requirements and their impact on planning Borislav M. Rackov ITU/BR/TSD/TPR Linked requirements and their impact on planning Borislav M. Rackov.
Regional Radiocommunication Conference (RRC-06) 15 May - 16 June 2006, Geneva, Switzerland RRC-06 Planning Interface Miroslav Ćosić, Andrea Manara Radiocommunication.
BR/TSD Geneva 2003 RRC-04/05 Information meeting Considerations on data formats to be used for capturing and submission of the requirements of Administrations.
BR DPT - RRC06 AD submission guidelines1 Administrative Declarations submission guidelines Borislav M. Rackov BR/TSD/TPR RRC06 BR DPT.
BR DPT - RRC06 DR submission guidelines1 Digital Requirements submission guidelines Borislav M. Rackov BR/TSD/TPR RRC06 BR DPT.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
Regional Radiocommunication Conference Information session Results of the second synthesis of the draft Plan Pham Nhu Hai PXT Team Leader Radiocommunication.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD RRC Website Сентябрь 2004 Москва David Botha.
Regular notification statistics Borislav M. Rackov ITU/BR/TSD/TPR Regular notification statistics Borislav M. Rackov ITU/BR/TSD/TPR Second Regional Meeting.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD Dakar 2005 BCD Reference situations and salient points for Administrations in the RCC region 25 – 29 April 2005 Dakar Workshop for the African Group.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Reference situations and salient points for Administrations in the RCC region Сентябрь 2004.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Accra 2005 BCD Workshop for the African Countries Second series of results of the first planning exercise 10 – 14 October 2005 Accra David Botha.
Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
BR/TSD دمشق 2005 BCD Planning Software أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.
RRC - Administrative declarations for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06 for.
BR/TSD Dakar 2005 BCD RRC Website 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
OVERVIEW OF INTERSESSIONAL ACTIVITES Eng. Taha A. Usi Ag. Zonal Manager TCRA, Zanzibar
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET
Geneva Public Library February 15th, What is ? How many of you have had accounts before?
Digital Certificate Installation & User Guide For Class-2 Certificates.
Installation & User Guide
Top Tips for Using Turnitin for Originality Checking and Online Marking A Quick Overview Humanities eLearning Team
1 PLANNING PROCEDURE FOR HF BROADCASTING RR12. Planning procedure for HF broadcasting – Art.12 of the Radio Regulations. Introduction to HF notification.
Los Angeles Biomedical Research Institute at Harbor-UCLA Medical Center eRA: Electronic Research Administration Wednesday, May 10, 2006.
Digital Certificate Installation & User Guide For Class-2 Certificates.
The Internet 8th Edition Tutorial 3 Using Web-Based Services for Communication and Collaboration.
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
Statewide Vendor Registration Instructions
Digital Certificate Installation & User Guide For Class-2 Certificates.
Google Apps: Google Mail Got Gmail?....Need Help? Mrs. Connor.
This demonstration will help you understand and perform (Internet Explorer Users: Click Browse, then Full Screen, to enlarge your view of this presentation.)
Follow these instructions to pay your dues. Get into your web browser Like Internet Explorer Now you need type in this address in the Address bar. Example.
June is an easy way to communicate. It costs nothing to send an , but it does require a connection to the Internet. You can.
August 15 click! 1 Basics Kitsap Regional Library.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
Understanding the IRS 990n e-Postcard COPYRIGHT 2010 Gold Wing Road Riders Association, Inc. All rights reserved under International and Pan-American Copyright.
ASAP (Assessment Submission and Processing) Submission Processing Overview for IRF-PAI IRF Conference May 2, 2012.
HR Action Reference Frequently Requested Transactions April 2014.
Tips & Tools for Successful Implementation Created by Choice Strategies.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
SYSTEM PLANNING Addendum FALL 2003 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. October 2003 PLEASE.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
Company Confidential Info Exchange Workflow Examples for External Users: Submittals Company Confidential.
XP New Perspectives on The Internet, Fifth Edition— Comprehensive, 2005 Update Tutorial 7 1 Mass Communication on the Internet Using Mailing Lists Tutorial.
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Immunization Data Exchange (BYIM v 2.0*1) Identifying and Addressing Data Exchange Issues Scott Hamstra Updated 8/24/11.
Electronic submission of Applications using PRIAMOS How To Guide PRIAMOS PRogramme Information and Activity Management Operational System.
INIS INPUT SUBMISSION. INIS Input Submission procedure how to submit bibliographic data PDFs to INIS Secure FTP server CD-ROM DVD October.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
Session 5 – online submission of applications Bruno Breviglieri, Natasha Jovicic.
Advanced NIMAC for Authorized Users 1www.nimac.us.
SIGMA Requestor Training In this presentation we will cover : How to log a Sigma ticket How to update a ticket via the notification function How.
1. Setting up an account- technical
Journal of Mountain Science (JMS)
Electronic Products Workshop Division of Air Resource Management -DEP
Objective 4.01: Compose effective correspondence
Setting up a Gmail Account & Safety Kamlesh Singh Bisht IT Specialist.
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Presentation transcript:

Preparation of requirements for the production of Draft Plan Borislav M. Rackov ITU/BR/TSD/TPR Preparation of requirements for the production of Draft Plan Borislav M. Rackov ITU/BR/TSD/TPR Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 New, to allow the administration to do final assembly of the requirement file and complete all validation pertinent to a consolidated requirement file Updated to comply with the new format given in CR/241 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 One new Field Two new Tables Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Validation of requirement with errors in Allotments Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Validation of requirement with errors in SFN_ID Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 New software: Files Assembly and Final Validation tool File assembly and final data validation (DNotif) Reference Database (analog TV, other services) Val OK? File with notices ready for submission to BR Yes No File 1 File 2 File 3 File 4 File …n Notices with errors Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Goals for the next submission phase Neat & timely submissions – quick and clear messages !!! ADM: Increase the quality (correctness and completeness) of the submitted data Notify on time having in mind time consuming activities (i.e. correspondence exchanged between BR and administrations) BR: Develop new software tools to facilitate validation prior to submission Reduce bottlenecks in data processing Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Identification of most common errors – Wrong file format – Identification data repeated or inconsistent (SFN Id, Administrations Unique Identifier, etc.) – Technical data missing or incorrect – Allotment areas wrongly defined (crossing segments, points outside the territory) – Analog assignment (for conversion) not found – etc. Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Draft Plan notification Please keep in mind and notify as soon as possible !!! * Re-check the status of your assignments in appropriate Plan for the Reference Situation (publication in Part B must be requested using TB3 notice form) !!! * Some practical recommendations to speed-up the processing of your submission: - please, always send your submissions to only - please put indication RRC- Submission of digital requirements for the Draft Plan in subject line of the . This will help identify your message and apply appropriate routing - please put in message body: summary of file contents (file name, number of notices, notice types, etc), signature - please send a telefax indicating address from which the submission was sent, content of the and of the attachments and name of the sender. This is essential for authentication and will help in (very, very rare) case of not arrival of the . sends a confirmation of submission receipt at the moment of registering the . - please do not attach anything else but the validated SGML file. Access files (with extension.mdb) activate virus protection software - please … Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 Draft Plan notification (2) Think about but act NOW !!! *…and some recommendations related to the senders - please note that ONLY authorized person may submit on behalf of administration. This may be administration itself or contact person designated by the administration. Insist with your administration to submit the name of contact person - please use corporate address. If forced to use portable addresses (yahoo, hotmail…) make sure that you can send/receive attachments 2 – 5 MB and to have at least 10 MB of free space. Google mail seems appropriate – this is not an advertisement! - please check regularly your Inbox, at least once a day, to be able to react promptly * … finally, do not forget to: - regularly check the ITU web site for all kind of information and software updates - feel free to contact (by or by phone) the ITU whenever in doubt or necessity Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 … Excessive input requirements for the available spectrum and errors in the preparation and submission of input requirements by administrations … Report of the first meeting of the Intersessional Planning Group (IPG) (Geneva, 4-8 July 2005) annex 15, page 127 Think about it! Requirements for the Draft Plan - Borislav M. Rackov ITU/BR/TSD/TPR

Second Regional Meeting and Workshop related to the RRC-06 for the administrations of the African countries Accra, Ghana, October 2005 They are going to receive and process your requirement … A. Méndez S. Pinnagoda A. Skokova B. Ba B. Rackov