2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
THE PROJECT LIFECYCLE National Contact Point
1 Information and Publicity in programming period.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Manatt manatt | phelps | phillips New York State Health Information Technology Summit Initiative Overview and Update Rachel Block, Project Director United.
Service Oriented Architecture Reference Model
1 of 13 Organization and Management Information Management in Your Organization IMARK Investing in Information for Development Organization and Management.
1 Meeting of the OECD Short-term Economic Statistics Expert Group June 2002 FUTURE OF SHORT-TERM ECONOMIC STATISTICS DISSEMINATED BY THE OECD.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
Israel, 10th and 11th of December 2003 Italy Israel Bi-national Seminar on Digital Access to Scientific and Cultural Heritage Antonella Fresa MINERVA Technical.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
The European Qualifications Framework (EQF)
1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:
EN Regional Policy EUROPEAN COMMISSION Ex post evaluation of the ERDF Obj. 1+2 Kai Stryczynski Evaluation Unit, DG Regional Policy European Commission.
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
The NATURE–SDIplus project Best Practice Network for SDI in Nature Conservation Co-funded by the Community Programme eContentplus ECP-2007-GEO Co-funded.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
NEFIS (WP5) Evaluation Meeting, November 2004 Evaluation Data Rights Aljoscha Requardt, University of Hamburg Response Rate: 91% - 10 of 11 partners.
IUFRO International Union of Forest Research Organizations Eero Mikkola Results of WP2 – Report Introduction to the work of WP2: Metadata, Keywords and.
Work plan – Evaluation - General Aspects - NEFIS – mid-term, WP2 and WP3 Meeting, Vienna March 2004 University of Hamburg, Aljoscha Requardt WP 5:
Hamburg NEFIS WP5 GT & Tim R 1 NEFIS Evaluation Meeting WP3 Report Tim Richards (EFI) Moh Ibrahim (Greenwich University) University of Hamburg.
Andreas Schuck WP4 Data preparation and provision NEFIS Project Meeting Joint Research Centre, Ispra, Italy.
Network for a European Forest Information Service -NEFIS NEFIS Knowledge Base Current Status Nguyen Thanh Binh IUFRO Vienna.
Risto Päivinen NEFIS 15 November Project Timetable.
INFOREST Information and monitoring of the forest environment Action 2141 ISA: Land resources INFOREST INFOREST action leader G. Schmuck.
Network for a European Forest Information Service WP 4 Data preparation and data provision.
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
0 - 0.
© Statistisches Bundesamt, B 2 / Institut für Forschung und Entwicklung in der Bundesstatistik Statistisches Bundesamt ESSnet on Preparation of Standardisation.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Introduction Lesson 1 Microsoft Office 2010 and the Internet
1 Kentuckys Public Safety Awareness Initiative Program Coordination and Partnerships August 23, 2005.
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
8/16/2014 E U R O P E A N F O R E S T I N S T I T U T E  To ensure that the objectives of NEFIS are reached and activities completed in accordance with.
Report on WP 4 status NEFIS mid-term and work package 2/3 meeting Vienna Andreas Schuck.
Risto Päivinen, Andreas Schuck and Tim Green NEFIS - Network for a European Forest Information Service QLK5-CT JRC Ispra - 29 June 2005.
European Forest Institute 1 Network for a European Forest Information Service (NEFIS) WP 4 Data preparation and data provision Solsona, Andreas.
NEFIS Knowledge Base Nguyen Thanh Binh IUFRO Vienna.
IUFRO International Union of Forest Research Organizations Eero Mikkola Description of WP2 – NEFIS Metadata and Controlled Vocabularies Standards - work.
IUFRO International Union of Forest Research Organizations Eero Mikkola The Increasing Importance of Metadata in Forest Information Gathering NEFIS Symposium.
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP QUALITY MANAGEMENT PLAN Valencia, November 2006.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
James A. Senn’s Information Technology, 3rd Edition
NEFIS Evaluation Meeting (WP5) Aljoscha Requardt, University of Hamburg NEFIS (WP5) Evaluation Meeting, November 2004  Metadata  VTK Workshop Topics.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
LTER IM Articulation Work: Developing Community Web Recommendations Nicole Kaplan (SGS), Karen Baker (CCE, PAL), Barbara Benson (NTL), Eda Melendez-Colom.
Requardt, 2004 NEFIS NEFIS – Network for a European Forest Information Service
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Population online Problem : locating relevant information sources corresponding to the needs IUFRO Task Force develops an Internet-based metadata.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
Information Asset Registries of Latvia Secretariat of e-government affairs Riga | 26 th October, 2007.
2012 LACRO Regional Planning Meeting March 26-28, 2012 Plaza del Bosque Hotel, Lima Peru Regional Census Activities 1.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
MetaPlus Klas Blomqvist Statistics Sweden Research and Development – Central Methods
NEFIS (WP5) Evaluation Meeting, November 2004 Evaluation Metadata Aljoscha Requardt, University of Hamburg Response rate: 93% (14 of 15 partners.
Florida Enterprise GIS Workgroup Collaborating and sharing to empower and enhance GIS services and resources statewide Sara Wander, GISP
Expert Group Meeting on the Revision of the Handbook on the Management of Population and Housing Censuses New York, 14 – 17 December 2015 Overview of the.
MarNIS Maritime Navigation and Information Services FP6 - Integrated Project.
EFIS a study carried out by EFI consortium for the Joint Research Centre / Space Applications Institute under Contract No F1ED ISP F. in.
Prepared by: Galya STATEVA, Chief expert
The NRN evaluation process in Poland
WP4 Measurements & social indicators.
Presentation transcript:

2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating efforts to create forest information systems and services supporting development of harmonised standards and procedures for data provision increasing the usability of available data and databases NEFIS

2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E 1)Review the state of the art in the technical development of information services 2)Publish a follow-up version of the currently available EFIS prototype 3)Develop metadata standards and controlled vocabularies 4)Suggest unified and operable methods for communication between different Internet based forest information service activities 5)Test the EFIS using regional, national and international data sets 6)Evaluate the service from the users and data providers perspectives 7)Develop strategies for development of the service NEFIS will implement a set of specific tasks during the project duration:

2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E Project Timetable

2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E WP 1: Management Partner 1, 2, 3, 4 Data available from multiple sources on the Internet GFISEFIS WP 3: UML description and establishment of a NEFIS and GFIS KnowledgeBase Partner: 3, 1, 4, 5, 6, 10 Refining the work plan and agreement on data input WP 2: NEFIS Metadata and Controlled Vocabularies Standards Partner 3, 1, 4,5, 6, 7, 8, 9 10, 11, 12, 13 WP 4: Data preparation and provision Partner 1, 4, 6, 7, 8, 9, 11, 12, 13 WP 5: Evaluation of (1) metadata standards, (2) process of data provision and (3) the advanced GFIS/EFIS system Partner: 4, 1, 5, 10 Advanced GFIS/EFIS WP: 6 Links with Commission Services, dissemination of results and follow-up activities Partner: 2, 1, 3, 4, and 10 Background Provider 1 Provider 2Provider 3Provider n