ERP Project Internal Discussion September 12, 2013.

Slides:



Advertisements
Similar presentations
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
Module 3: Business Information Systems
Intracompany Stock Transfer Scenario Overview
Powerpoint Templates Page 1 Powerpoint Templates Page 2 Something you own that has value There can be assets that gain value over time…. What is an Asset?
Steve Schwabe Woolpert Project Manager
Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Cleveland School District Gerald Finley, Property Manager Friday, July 27, 2012.
- Overall Equipment Effectiveness -
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
The Production Process
Process Management and Control and Physical Inventory SAP Implementation
Enterprise Systems.
Parts Disposition on Service Orders - a custom solution Pieter de Bruyn Session: 4005.
---Confidential 1 Order Management Training. ---Confidential 2 Introduction Three cycles in Oracle Applications Plan to make. Order to cash Procure to.
Introduction to SAP R/3.
SAP R/3 Materials Management Module
Procurement Processes SAP Implementation
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Production Planning Processes Theories & Concepts
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Ganda ERP Project | ERP Project Status Report for CFC June 2014.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Chapter 2 – Enterprise Systems
ERP Project Update September 2013
TOOL MANAGEMENT INTRODUCTION
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Presentation on Facilities / Assets Management by Satyam Computers Services Ltd.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
1 Footnote SOURCE: Source | ERP Project Update Report # 1 – June 2013.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy & Go-Live Preparation 1 June 2015.
CE Operating Systems Lecture 3 Overview of OS functions and structure.
Ganda ERP Project | ERP Project Status Report for CFC Oct 2014.
Ganda ERP Project | 0 CFC ERP Parallel Test Preparation 12 June 2014.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy 31 December 2014.
Ganda ERP Project | ERP Project Status Report for CFC Dec
Presentation EMAL Equipment Status Dashboard. 1.User has to type HOURS UNPLANNED DOWNTIME and the %OA as per the formula agreed (next slide). The spreadsheet.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Purchase Orders Notes:.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
SAP R/3 User Administration1. 2 User administration in a productive environment is an ongoing process of creating, deleting, changing, and monitoring.
© Arbela Technologies Accounts Payable + Procurement & Sourcing Workflows.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
oracle apps order management training
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Outbound Process Using Wave, Pick-HU, Packing, Staging, and Loading
Chapter 22 Procurement Cycle and Documents
Automating Accounts Payable
Maintenance Scheduling
Intercompany Concepts
Intracompany Stock Transfer Scenario Overview
Intercompany Project Time and Expenses Scenario Overview
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Intracompany Stock Transfer Scenario Overview
MAINTENANCE PLANNING AND SCHEDULING
Management of Change Report Errors to Management.
Order-to-Cash (Project-Based Services) Scenario Overview
Intracompany Stock Transfer Scenario Overview
Lawson ProcessFlow Overview and Actual ProcessFlow Solutions
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Order-to-Cash (Project-Based Services) Scenario Overview
Radiopharmaceutical Production
Presentation transcript:

ERP Project Internal Discussion September 12, 2013

Agenda / Topic Discussion 1. Item Coding / Equipment Coding  Conclusion: see slide# 3 2. Raw Material / Spare Part Procurement  Conclusion: see slide# 4 3. Maintenance Center  Conclusion: see slide# 5 4. Tuck Scale & Belt Scale (LiGu System)  Conclusion: see slide# 7 5. Unify PLC Log sheet for production  Conclusion: see slide# 8 6. Inter-company transaction  Conclusion: It will be re-discussed with Mr. Ryan when doing operation training 7. Costing must be separated by different production line  Conclusion: ratio will be provided by CFC 8. Fixed Assets management must be separated by Fixed Assets / Expense Assets.  Conclusion: CFC will make discussion of a standard code rule and will update the result on Monday 16 th Sep. Accounting dept. will be in charge for creating code rule as well as management and GA Dept. will be in charge for maintaining the transactions of assets. 9. ID & VN some report for outside need to print out the 2 languages ( Title and contents )

1. Item Coding Item code rule in CFC 9 Digits  12 – 34 – First 2 digit are group (10= item with value; 20= item without value; 30= expensed item; 40= item for project; 50= Disposes item) Second 2 digit are part category (using matrix table, separately for Plant and GA) Third 5 digits are bin card number / sequence number) Currently CG (Kupang) follows CFC’s item code principles with little modification such as: only using 1 matrix table for all, there is no grouping. Need same item coding principles when we use integrated ERP system in group company and facing some issues such as: - Unify item code principles that can be applied to various business unit (Cement plant, Ready Mix Concrete and Aggregate Company, Transportation, Trading) - Item code rule should be flexible, extensibility, and easy to recognize and applicable for whole group and can be fast learn by new employ. Background 1.It is agreed to use matrix table content in order to make it consistence and easy to extended to other business growth in future. CFC & CG will use the same table. Mr. Tony will held the meeting on Sep 16 to discuss about variant code will start from number 1 instead of adding number zero in first digit in front of existing bin card. Discussion Results Main Objectives: - Our Group will have same Item Coding principles

2. Raw Material / Spare Part Procurement CFC recommend PR for raw material and spare parts will be raised by users instead of W/H. Current practices are: Users are more familiar equipment life cycle to raise PR for purchasing the spare parts for maintenance. Any departments issue PR will be integrated and approved by plant director who take the whole responsibility of the plant operation. W/H may more suitable to manage the inventory and ready for users only instead of play the role of integration. Hence, recommend PR will be raised by users instead of W/H in CFC CG (Kupang) practices are W/H will raised PR for all of stock items procurement like Raw material & spare part, based on defined minimum stock availability (Minimum and maximum stock warehouse availability must be setup by users together with warehouse based on estimation/historical usage) WH have authority to postponed on raising PR if the stock items not moving in certain period PR for non stock items / non warehouse items should be raised by users. Background 1.Due to specific requirements in each country, so we proposed to have different way in CFC and CG Discussion Results Main Objectives: - Concept alignment on stock item procurement

Work Centre 1 Plant Maintenance Electrical / Instrumentation GA (Office, Public facility, Vehicle) Maintenance Mechanical / Workshop Civil /Utilities Mining and Heavy Equipment Work centre 2 Plant Maintenance GA (Office, Public facility, Vehicle) Maintenance Electrical / Instrumentation Mechanical / Workshop Civil /Utilities Work centre 3 GA (Office, Public facility, Vehicle) Maintenance (i.e. Kupang, Bayah Plant) (i.e. Ciwandan, Head Office) (i.e. Cemindo) 3. Maintenance Main Objectives: - Concept alignment on Maintenance Centre or work flow mechanism on repairing order 1. We propose all of maintenance notification (repairing note) pass through to designated functions in each Work Centre like shown on below 2. We will have some work center (or other name) for each location site which system applied. A work centre is an organizational unit where a work steps is carried out, producing an output. The work center defines where and by whom an operation is to be carried out. 3. The maintenance modules (CMMS) only applied to non CAPEX order. For Investment work (CAPEX) and/or Maintenance / repair work to improved Fixed Asset in order to extend their life time will be using Project Management Module

Maintenance System in brief Pick-list (to take W/H spare parts for stock items) Notification create by user and direct sending to the each PIC in their Work Centre (see previous page) with the following type of notification 1. Maintenance Request. (notifications will be written for the equipment that failed. User don’t know exactly problem, i.e. abnormal noise etc). 2. Malfunction Report. (notifications will be written for the equipment that failed. User already know what the problem, i.e. motor burn etc). 3. Production line stop. (notification will be written against the equipment that caused the production line to stop. The downtime in these notifications will be the duration of the downtime of the production line. These type will determine of work priorities and calculated KPI PIC (Person in Charge) verify notifications that requested by other departments and create maintenance order or not after verify/checked., if not requestor will be notified. Verify Notification Maintenance / Work Order Maintenance Order type 1. Corrective maintenance order (i.e. equipment breakdown, repair etc) 2. Preventive maintenance Order (i.e. scheduled, overhaul etc) Note: Preventive maintenance triggered from schedule/planning therefore notification not required and automatic generated from the system Work Planning (assigning people/technici an) Generate Purchase Req, for non stock item or services/outsources Maintenance orders must be planned daily, weekly, monthly, and quarterly period In case of additional stock material required after maintenance order has been released, there will be a goods issue form to fill in and sign by leaders or above before goods issue can be processed Maintenance Execution Maintenance Completion Actual information of maintenance order (e.g. man-hour, spare part used, external services used etc) must be updated into the system during maintenance works are in process and after the maintenance works are completed. A maintenance order can be completely closed if:  All relevant activities are finished.  All of actual labor costs have been confirmed and settled.  All relevant costs in maintenance order are captured (labor costs, external services, and materials costs) and settled. For discussion only

4. Truck Scale & Belt Scale Currently CFC have 2 system which integrated each other (LIGU System and Application System). LIGU system is weighbridge system which widely customized covering other functions such as Truck registration (scan Driver ID & truck license), ticketing, weigh tolerance, packer control panel, and monitoring the In- Plant truck movement. LIGU system in CFC is also used for belt-scale in production area. LIGU System well proven implemented for years and requires special customization to ensure no impacted to the daily operational. Currently CG have weighbridge for Kupang Plant operational and F/G Warehouses. CG’s weighbridge running with simple process just tools to get tare and nett weight. Background It recommend TIPTOP ERP replace LIGU system for the Truck Scale & Belt scale control. (LIGU System can’t used due to basic data cannot be unified with ERP System). Notes: Now CFC already have 12 sets Truck Scale + 7 Belt Scale, But because LIGU system is using local database, When User Dept. create the basic data for Goods / Products / Vendor / Customer can not match with the ERP system and will have different ID code. With considered to project scope and feasibility, it’s suggested LIGU replacing will be done later. CG & CFC will use truck scale to provide tare weight and net weight to TIPTOP system (weight ticket printout from ERP) and in future we will use ERP to control weight scale to include in-plant truck monitoring. We will run parallel the two system LIGU & ERP until TIPTOP system established and stable. Asking LIGU to provide open database mode. Discussion Results Main Objectives: - To find best solution for ERP system interface to existing system (LIGU System)

5. Unify PLC Log Sheet CFC have 3 kinds of PLC data. 1st Line / 2nd Line / Hiep Phuoc Grinding Plant. CG have some kind of Log file data generated from Hyperion (DCS application software) To unify those kind of Log file data is impossible because different purposes Unified PLC log file data required for interface purpose between ERP system and field device. To unify it its impossible because different purposes. So, TIPTOP should based on different equipment to design and get the data automatically. Also have to design the interface for user can entry data manually Background TIPTOP should based on different equipment to design and get the data automatically from SQL DB of CFC & CG. TIPTOP should design the interface for user can entry data manually (for emergency case) TIPTOP provide DB template base on CG and CFC log file data then TIPTOP will generate related reports The log file must include production report, operation report, control room, finger-printer, gate access, telephone switch board, weight scale, belt scale, gasoline station. Discussion Results Main Objectives: - Unify PLC Log Sheet for system interfacing purpose

RED word means manual input (others auto generate from system) Customer S/O PR P/O S/O P/O S/O D/N G/R D/N G/R D/N A/R A/P A/R A/P A/R Transfer CG AASTARCFC TipTop Inter-Company Transaction Since AASTAR also manage their own customer and product (i.e. plywood & palm oil), means it's not just inter-company transaction pass through