Materiality in the CDM 25 th March 2012 Gareth Phillips Chair, Project Developer Forum Chief Climate Change Officer, Sindicatum Sustainable Resources.

Slides:



Advertisements
Similar presentations
Chemical Quantities or
Advertisements

Simplifications of Context-Free Grammars
Adders Used to perform addition, subtraction, multiplication, and division (sometimes) Half-adder adds rightmost (least significant) bit Full-adder.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
STATISTICS HYPOTHESES TEST (I)
Objectives: Generate and describe sequences. Vocabulary:
for Cabin Safety Inspectors
6 - 1 Copyright © 2002 by Harcourt, Inc All rights reserved. CHAPTER 6 Risk and Return: The Basics Basic return concepts Basic risk concepts Stand-alone.
We need a common denominator to add these fractions.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
. Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012 Materiality in the CDM Experiences.
JI Governance – review of JI Guidelines
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
Validation and Verification Report Templates 25 th March 2012 Susanne Häfeli-Hestvik Member of the PD-Forums Executive Committee VP, Director Technical.
Significant deficiencies in validation, verification and certification reports 25 th March 2012 Gareth Phillips Chair, Project Developer Forum Chief Climate.
Measurements and Their Uncertainty 3.1
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1. Name the particles in the atom and give the charges associated with each.
Lecture 2 ANALYSIS OF VARIANCE: AN INTRODUCTION
Chapter 7 Sampling and Sampling Distributions
The 5S numbers game..
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
Biostatistics Unit 5 Samples Needs to be completed. 12/24/13.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Juan Gallegos November Objective Objective of this presentation 2.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Cost-Volume-Profit Relationships
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
DSS Decision Support System Tutorial: An Instructional Tool for Using the DSS.
F-7 and F-7A Understanding the problems with NARFED Forms and Reports CAB 1/23/2012.
Putting Statistics to Work
: 3 00.
5 minutes.
AU 350 SAS 111 Audit Sampling C Delano Gray June 14, 2008.
Types of selection structures
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Essential Cell Biology
©2006 Prentice Hall Business Publishing, Auditing 11/e, Arens/Beasley/Elder Audit Sampling for Tests of Controls and Substantive Tests of Transactions.
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
4/4/2015Slide 1 SOLVING THE PROBLEM A one-sample t-test of a population mean requires that the variable be quantitative. A one-sample test of a population.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Presentation transcript:

Materiality in the CDM 25 th March 2012 Gareth Phillips Chair, Project Developer Forum Chief Climate Change Officer, Sindicatum Sustainable Resources

2 Background – Materiality is a concept that is widely applied in data auditing and verification circles – It is used as a means of helping verifiers to define the audit schedule and as a means of dealing with minor (immaterial) issues with data sets – PPs and DOEs have tried to explain materiality to the EB on several occasions, failing miserably – The application of materiality that I am presenting is NOT the full scope of materiality, but it is what the Parties have accepted to date – If DOEs have a different view, they need to engage with the Parties before and at SB and CMP meetings and do a better job of explaining materiality Project Developer Forum

3 Materiality and Environmental Integrity – At present, there is no consistent or accurate means of dealing with minor issues with data sets. – When such issues are detected, values are zeroed out / set at 100% capacity or we have to request a deviation; DOEs are reluctant to do anything that is not the most conservative option – Zeroing out values actually serves to introduce more errors into a verification; is un-necessarily conservative and means that in some cases ERs do not equal BE-PE-LE – Different DOEs deal with these issues differently and there is no reporting of such issues – Applying materiality, identifying and quantifying such errors ADDS integrity and transparency to the process. Project Developer Forum

4 Guidance from CMP – Defines material information as a piece of information the omission, misstatement or erroneous reporting of which could change a decision by the EB – Or alternatively, immaterial information is a piece of information the inclusion, correction or estimation of which would NOT change a decision by the EB. – Also decides that information related to a clean development mechanism project activity shall be considered material if its omission, misstatement or the non-compliance with a requirement might lead, at an aggregated level, to an overestimation of the total emission reductions or removals achieved by a clean development mechanism project activity equal to or higher than [the following thresholds] – If you look at the size of the thresholds, its clear that the CMP do not expect materiality to be applied to help define an audit schedule – you need 5% materiality to do this Project Developer Forum

5 Purpose and application of the guidance – The purpose of this guidance is to simplify the process of verification without impacting upon the environmental integrity of the CDM. – In applying the guidance, DOEs are empowered to accept replacement values such as estimated values, which can be corroborated using other verifiable information, to the extent that the aggregated value of the data in question does not exceed the given thresholds. For example, when a meter fails for a short period of time but there is evidence to show that the plant was otherwise operating normally, the PP can fill the gap with the average of before and after values; DOE can corroborate the assumption of continuous operation from other data and accept the estimated values – Such replacement values do NOT need to be calculated using procedures which are included in the monitoring report Project Developer Forum

6 Application of the guidance cont. – Such corrections can be made to data relating to both baseline and project emissions because in calculating the materiality, the value of the data is aggregated (i.e. whether its an increase or decrease in emissions is irrelevant). – The materiality threshold is calculated as the aggregated value of the corrected baseline emissions plus corrected project emissions divided by aggregated value of the entire baseline ad project emissions for the reporting period in question, expressed as a percentage. – An example follows: Project Developer Forum

7 Example from a real monitoring plan Five different types of failures were identified. 1) Communication disconnect between Flare PLC and central PLC, flare CH4% and flame temperature signal are lost – We do not have a back up means of confirming that the flare was operating therefore we cannot prove that this was just a signal failure and provide an estimated reading. – This error lost an estimated 196 CERs 2) No.1 and No 3 engine running but gross power and differential pressure data both are missing. – Again, cannot prove plant was operating – Estimated loss of CERs – 36 3) Replacement of relative pressure with absolute pressure at the outlet of phase 2 pre-treatment – Change algorithim, no impact on CERs Project Developer Forum Event Start Time (GMT) End time (GMT) Event / Cause Action taken Impact on CERs :11: :29:30 Communicatio n disconnect between Flare PLC and central PLC, flare CH4% and flame temperature signal are lost Impossible to prove that flare was running therefore Reduced by 138 CERs, estimated based on before and after readings :56: :58:00 Reduced by 52 CERs, estimated based on before and after readings :40: :19:00 Reduced by 6 CERs, estimated based on before and after readings : :42 No.1 engine is running but gross power and DP data both are missing. Impossible to verify by any means Reduced by 36 CERs (for both engine 1 & 3), estimated based on before and after readings : :45 No.3 engine is running but gross power and DP data both are missing. Impossible to verify by any means :29: :48:00 Replacement of relative pressure trans from absolute pressure at the outlet of phase 2 pre- treatment Change ER algorithm No impact :10: :37:00 No.2 engine keep running but DP=0Kpa because of DP trans sample pipe frozen. Back calculation from Gross Power output, conservative, 4 m3 pure methane per kWh GP, based on manufacturers specifications Total impact 324 CERs based on back calculation from GP output :08: :56:00 No.2 engine keep running but DP=0Kpa because of DP trans sample pipe frozen. Numerous events Causing lost readings of methane volume to one or more gensets :31: :12:00 35KV system communication was lost and power meter reading displayed Zero. No action because power meter reading back to normal display while 35KV communication reconnection. No impact Table 1: Special events during Duerping MR5

8 Example cont. 4) No.2 engine running but DP=0Kpa because DP trans sample pipe is frozen. – Multiple events totaling 324 CERs – Evidence is available that the engine is running on the basis of gross power output – Gas consumption can be estimated from gross power output using manufacturers specifications 5) 35KV system communication was lost and power meter reading displayed Zero. – No action required because when connection was re-established meter read the correct total – No impact on CERs – So, out of five types of error, one could be corrected, two had no impact and two resulted in loss of CERs Project Developer Forum

9 Calculation of materiality Date / Time StampA1A2AA' Parameter Volumetric Flow Rate CMM m3/month Average month CH4% Corrected Volumetric Flow Rate CH4 m3/month Uncorrecte d Volumetric flow rate CH4 / month fromToA1 = A / A2A2A 27-Oct-1026-Nov-10 1,883, , , Nov-1026-Dec-10 2,440, , , Dec-1026-Jan-11 3,093, ,194,289 1,178, Jan-1126-Feb-11 3,108, ,304,916 1,302, Feb-1126-Mar-11 3,386, ,333,815 1,331,420 Table to the right shows the different values obtained for volumetric flow of methane in m3 per month with corrected and uncorrected data related to error number 4 Project Developer Forum

10 Calculation of materiality This table shows the Baseline and Project emissions under both scenarios The difference in the aggregated value is 425 out of a total data set of The percentage of data which is impacted is 425 / = 0.32% Materiality threshold for this project is 1%. Project Developer Forum

11 Conclusion – DOE is able to verify the estimated values as being a more accurate determination of CERs compared to zeroing them out – PP gets the CERs which they have generated – Errors and failures in the monitoring system are better understood – PP should now consider whether to implement procedures or invest in more equipment to monitor the operation of the flare. Can evaluate the likelihood of breaching the threshold and the financial penalty – The monitoring system, data and errors are better understood and more transparently explained, leading to greater environmental integrity Project Developer Forum

12 Thank you for listening The Project Developer Forum (PD-Forum) is a collective voice to represent the interests of companies developing greenhouse gas (GHG) emission reduction projects in international markets under the Clean Development Mechanism (CDM), Joint Implementation (JI) and other carbon emission reduction schemes and programs. See our members at: Project Developer Forum