Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

MARKETING & SALES SYSTEM MODULE. SALES PROCESS - DOMESTIC.
Design Constraints For Engineering Projects
Customer Relation Management System Multi Environment Solutions.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Assembly Drawings, Balloons, and Parts Lists
First Article Inspection Report
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Chapter 20 Working Drawings
Module 12 – part 2 | Slide 1 of 35 January 2006 Basic Principles of GMP Documentation Part 2 15.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
PRODUCTION ZETA ERP. MAJOR FEATURES Creation of BOM with Assemblies and sub-assemblies Checking Raw materials.
Working Drawings Chapter 12.
Module 10 Setup for Production.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Week 6 - Lecture Product Documentation
© Tally Solutions Pvt. Ltd. All Rights Reserved Excise for Dealers in Tally.ERP 9.
David Warne Independent Manufacturing Consultant.
First Article Inspection
ILearningCampus.com Understanding by doing and learning by talking.
Basic Principles of GMP
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
PRAVENDRA KUMAR.  A supply chain is the collection of steps that a company takes to transform raw components into the final product.  Supply chain management.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Dr. Catherine Turner Assembly drawings.
Chapter 18 cont.. Sub Assemblies  Smaller assembly that is part of a larger assembly  Drawings for subassemblies are shown in their own assembly drawings.
ME/MECA 238A1 ME/MECA 238A - Mechanical/Mechatronic Design Project I Course notes prepared by G.A. Kallio, based on The Mechanical Design Process, by D.G.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Engineering Drawings MeEn 476 Department of Mechanical Engineering Brigham Young University.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Production Process Contents: Maintaining bills of material (BOM) Production process.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Introduction to Engineering Reading Working Drawings
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Internal Auditing ISO 9001:2015
1 MEMB113: ENGINEERING GRAPHICS & CAE 13 ASSEMBLY AND DETAIL DRAWING.
Working Drawings Stephen W. Crown Ph.D.. Working Drawings A final set of drawings providing all the details and information needed to manufacture and.
1 Global Drug Facility presentation IPC meeting 10 December 2015 Magali Babaley Procurement, supply and country support manager.
© Tally Solutions Pvt. Ltd. All Rights Reserved Tally.ERP 9 Series A Release 3.0 Bill of Material (BOM)
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
1. Check your order….  Please check your order confirmation documents carefully and ensure that the style, colour and quantity of the items stated match.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Engineering Documentation
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Agenda Item 2: Catch up session 15 May 2017
Assembly Drawings, Balloons, and Parts Lists
GRG Polydynamics Pvt. Ltd.
Firestone Metal Warranties
SYSPRO Business Model Flows
ASSEMBLY AND DETAIL DRAWING
Introduction to New Product Development (Portfolio)
Introduction to New Product Development (Documentation)
MRP.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.
SQA01 Guidance Material: FAI Review
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
Working Drawings & Layers
Working Drawings Chapter 12.
Delivery Management Systems Brilliant Info System Pvt.Ltd Supply Chain Management.
CIVIC’s Next Generation Fishery ERP Solution!
Specifications What should it cover Goods Services Warranty
Forging new generations of engineers
Design Constraints For Engineering Projects
Assembly drawings Flóra Hajdu B406
Presentation transcript:

Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.

Manufacturing Process Start Purchase Order from Customer. Customer Relationship Management. Check Dimensions GA, OGA, IGA and cable Size of I/C, O/G. Check the Scheme and Process understand requirement. Check site status / likely date of readiness and agree to delivery schedule Do internal schedule agree with customer needs Seek and estabilsh mutually agreed terms with customer. Design and generate all Dwg, BOM and technical specifications. Submit to customer / Consultants for approval Follow Up Approval received Cont.. A Find solution to address Customers needs YES NO

Manufacturing Process Cont.. A Issue Standard Drawings to Production Issue Standard Mechanical Drawings for Production Procure Bought-out products Receive the materials Produce Busbar, Punch,bend /Sleeve Carry out internal inspection & clear fit-for QC stage Inspection Send fabricated shell components for powder coating GroupWise place for Panel wise kits Cont.. B Attend to comments. Generate and Issue Development drawings for non-standard items QC stage Inspection Attend to comments. QC stage Inspection Attend to comments. Assemble Shell (enclosure) Attend to comments. Finish production of fabrication items. QC stage Inspection Clear to Production

Manufacturing Process Cont.. B Complete Main Assembly Carry out Inspection & tests Fit for offering to Customer Offer to Customer Inspection & complete the same Any changes / customer Inspection Provide functional test report & Compliance report Obtain Dispatch Clearance Pack, Bill, & dispatch Panels with proper Documentation End Carry out Inspection & tests