BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

Doc.: IEEE /0165r1 SubmissionPäivi Ruuska, NokiaSlide 1 Implementation aspects of a coexistence system Notice: This document has been.
BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Tutorial for leadership teams of ITU-T study groups, TSAG, tariff groups and focus groups Alternative approval process (AAP) for ITU-T Recommendations.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
CAO processes Applications to undergraduate courses in Higher Education Institutions (HEIs). Offers are issued and acceptances are recorded by CAO. Assessment.
Review of Type II Interconnection Policy Press Conference 6 July 2004.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
Ofcom Consumer Switching
Ofcom Consumer Switching
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Third Energy Package for Change of Supplier 2009/73/EC.
Dave Chaffey, E-Business and E-Commerce Management, 4 th Edition, © Marketing Insights Limited 2009 Slide 1.1 Introduction to e-business and e-commerce.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Today’s Agenda: Launch Celebration – WebJunction Staff - 20 minutes Partner Feedback – Kathleen Gesinger - 15 minutes Coming Soon – Dale Musselman - 15.
Enterprise and Industry Agenda Item Game Consoles Product Group 'Sound and Audio Equipment' Consultation Forum 9 October 2012 Ecodesign Directive 2009/125/EC.
RCC meeting Feasibility of implicit allocation in the gas market TITRE 18/10/2012 RCC meeting Feasibility of implicit allocation in the gas market NMa.
Introduction to the Thomson Reuters EU Commitment : Extended RIC License (ERL)
Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Ofcom Consumer Switching
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Imposing access obligations under the new framework Karen Hardy.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
PPC Industry Forum 2 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Pathfinder update webcall 15 th May 2009 Welcome to the BT's 21CN programme is subject to consultation and further development. Dates and other details.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
Quarterly update webcall on BT’s 21CN programme 26 th October 09 Welcome to the BT's 21CN programme is subject to consultation and further development.
MSIL Discussion with Industry Steve Wright/Doug Harrison 11 th January Issue 1.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PPC Industry Forum, 03 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
Pension consultation Proposed changes to the Lafarge UK Pension Plan – Final Pay Section.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
Exit Capacity Substitution and Revision
Presentation transcript:

BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0

© British Telecommunications plc Page 1 The Objectives of the Webcall Share BT Wholesales portfolio proposals for TDM on 21CN Summarise the Consultation process and key messages Replay feedback already received Address some of the Utilities specific concerns Share the Consultation plan and timeline Gain your feedback through a Q&A session

© British Telecommunications plc Page 2 Disclaimer BT's 21st Century Network is still in the process of development and the subject of consultation. The information in these slides may be subject to change at any time without further notice and exclusive reliance on the information in these slides is at your own risk. BT has taken reasonable care to check that the information contained in this document is accurate at time of publication. In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available. With the exception of any products which have already been launched, any notification timescales, launch dates and pricing information provided is indicative only and will, where applicable, be subject to the successful outcome of any trial and to any legal and regulatory approvals being given

© British Telecommunications plc Page 3 Agenda Introductions The Industry Consultation Process Summary of key Consultation messages –Product Annex from Consultation document Utilities FAQs Timeline for the Consultation period Q&A

© British Telecommunications plc Page 4 Industry Consultation Explained The Consultation process: –The Industry Consultation period is for BT Wholesale to consult with CPs on the future of products on the 21CN, before making final decisions on its 21CN portfolio –An Industry Consultation document is a set of proposals for comment, for comment from Industry, so the information shared with you today is not set in stone –After the consultation period is complete and BT has considered all responses from the CPs, it will issue a Consultation Closing Document Some CPs have sent BT their responses to a set of questions from the Consultation document The Closure document publishes those responses (anonymously), tries to answers any questions raised by CPs and set out BTs final statements –After the Closure Document is issued the Consultation is closed and BT Wholesale will commence development of the 21CN TDM portfolio –The statements within the Consultation document are issued by BTWholesale and only refer to BTWholesale products –Global Services are treated as any other CP in the Consultation process and therefore are not in a position to provide full plans on their 21CN portfolio until sometime after the final Consultation position is published

© British Telecommunications plc Page 5 TDM Industry Consultation Proposals Summary 20C Legacy 2Mb and above services Extend SDH platform life from 2011 to Q Introduce Next Generation 21C product options Stop/ sell 20C services when 21C alternatives are available and withdraw all 20C products by Q C Ethernet (from 2008) 21C Native TDM (from 2009) Migrate to 21C service CP led migration from 2009 BT led migration from C Legacy Sub 2Mb services inc AoD Extend DPCN platform life from 2011 to Q Introduce Next Generation 21C product options Stop/ sell 20C services when 21C alternatives are available and withdraw all 20C products by Q Broadband (from today) 21C Native TDM (from 2009) Migrate to 21C service CP led migration from 2009 BT led migration from 2012

© British Telecommunications plc Page 6 Product Listing (Annex A of Consultation Document) * No direct 21CN replacement product at this speed ** Subject to 21CN availability *** Subject to demand (if there is insufficient demand BT may withdraw earlier).

© British Telecommunications plc Page 7 Utilities FAQs – Design What performance can I expect from the 21CN Native TDM solution? –21CN TDM will be based on Next Generation SDH and will be carried natively in 21CN –We are aiming to offer the same customer experience as current 20CN product performance What happened to TDM emulation? –BTs feasibility on TDM emulation showed that it cannot meet the delay or jitter requirements for strict TDM performance, so BT does not currently plan to introduce an emulated TDM service. –BT may reconsider this position if the technology matures to a performance level acceptable in the marketplace Will BT need to change my current access network? –It is anticipated that the majority of 20CN TDM access network will be retained to work with the 21CN –This also applies to PPC Point Of Handover & 3 rd party tails Can customers see BT 21CN node data & rollout plans? –CPs have access to some of this information, end customers ordinarily would not What is the life expectancy of alternative 21CN products? –We have no plans for withdrawal of 21CN products currently but would expect to withdraw them when they are no longer viable, due to low demand What resilience & switching options will be available for TDM on 21CN? –Similar resilience configurations would be available to those currently provided

© British Telecommunications plc Page 8 Utilities FAQs – Service When will customers get to see 21CN TDM product pricing? –This is likely to be late 2008, at the earliest Would there be a fixed time between stop sell and product withdrawal? –We expect that to be no shorter than 2 years but there will not be a fixed time as it will depend on how far ahead of the 20CN platform closure the stop sell date is issued When will customers have an indication of product mapping and stop sell dates? –The current product mapping plan is shown on slide 6 –Stop sell dates announcement will be co-ordinated with their 21CN replacement launch announcement Can BT clarify what is meant by support services on 20CN until Q1, 2014 subject to demand? –If the migration of services away from the 20CN platforms occurs more quickly than expected, then BT may decide to close the platform before 2014 What is happening with EPS type circuits & non-own exchange circuits –Analogue circuits, non-own exchange, would be mapped to a 64Kb 21CN alternative –Analogue circuits, own exchange, are not impacted by this consultation Life expectancy of alternative 21CN products –No current end of life dates for 21CN TDM products Do utilities have to repay connection charges when migrating to 21CN –Only when changing bandwidth, or when moving to a different product i.e Ethernet

© British Telecommunications plc Page 9 Timeline Consultation period: Completed October 22 nd - November 30 th BT produce draft Closure document:December 19 th (est.) Industry provide comment on draft Closure document January 18th th 2008 (TBA) BT produce final Closure document January 31 st 2008 (TBA) 21CN Product launch announcements/pricing information Q (at earliest) 21CN TDM Product launch2009 onwards 20CN TDM product stop sell2009 onwards Closure of 20CN platformsEnd of Q1, 2014

© British Telecommunications plc Page 10 Answers Questions

© British Telecommunications plc Page 11 Useful websites Switched-on website 21CN website Consult21 website