GlueX electronics Collaboration Meeting May, 2004 Paul Smith.

Slides:



Advertisements
Similar presentations
Hall D Level 1 Trigger Dave Doughty 8/5/03 Hall D Collaboration Meeting.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
EIC Workshop 21 May 2008 Experience with high trigger R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division Topics Cebaf’s Large.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
Hall D Level 1 Trigger Dave Doughty 1/10/2008 Hall D Collaboration Meeting.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
Hall D Trigger Dave Doughty 9/10/04 Hall D Collaboration Meeting.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
B. Hall 17 Aug 2000BTeV Front End Readout & LinksPage 1 BTeV Front End Readout & Links.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
The Lead Glass Detector Overview, Experience and Direction.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
LHCb Outer Tracker Electronics 40MHz Upgrade
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
ETD meeting Architecture and costing On behalf of PID group
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
14-BIT Custom ADC Board Rev. B
DCH FEE 28 chs DCH prototype FEE &
A First Look J. Pilcher 12-Mar-2004
14-BIT Custom ADC Board JParc-K Collaboration Meeting
GlueX Flash ADCs 3425 PMT channels Forward, Barrel Calorimeters
VELO readout On detector electronics Off detector electronics to DAQ
Example of DAQ Trigger issues for the SoLID experiment
Commodity Flash ADC-FPGA Based Electronics for an
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
TOF read-out for high resolution timing
Presentation transcript:

GlueX electronics Collaboration Meeting May, 2004 Paul Smith

12,500 ADC channels 8,200 TDC channels Level 1 Trigger: 200 KHz X 5 KB/event = 1GB/sec Digital Pipeline Deadtimeless ~$3.5M

Cockcroft-Walton PMT base

Robotic Selective Assembly

Electronics Review Andy Lankford (UC Irvine) and Glenn Young (ORNL) at the GlueX Electronics Review - July

Single channel FADC prototype Test bed for:: SPT converter chip Xilinx chip and software Mentor PCB & FPGA software Intellectual Property (PCI core) Robotic assembly

JLab TDC Module

“Electronics” View of Trigger/DAQ Digital Pipeline Front End “Digitizer” FE/DAQ Interface Trigger Analog Data To ROC Event Block Buffers Every events Every event

Photon Rates Level 1 Level 3 Physics Signal Software-based Level 3 System 10 7  /s Open and unbiased trigger Design for 10 8  /s 15 KHz events to tape Level 1 trigger system With pipeline electronics

Selected Review Conclusions: It is important to insure that the requirements on the electronics derive from the physics. The requirements and specifications of the analog front-end electronics are not yet adequately defined. This is coupled to the tentative status of some detector designs. The lack of full definition of detector designs may soon limit progress on electronics design, The manpower resources shown during the review will be inadequate for developing an electronics system of the scope required by GlueX. The decision to standardize all detector readout on a single TDC module design and a single Flash ADC module design is good, and will help simplify the overall electronics system design in a constructive way and conserve valuable engineering resources. The Committee feels that it is desirable to locate these modules in a radiation-free area if possible, in order to improve access.

CD-0 5 years to beam! BaBar required 100s of engineer-years GlueX currently has 2 electronics engineers Key detector parameters still undefined Funding profile unknown Management plan unimplemented Welcome new collaborators from Alberta and Oak Ridge!

Divide and Conquer F,B Cal FADCs ~3000 channels 8 Bits, 250 MSPS Energy Sum for Level 1 dE/dX FADCs ~3400 channels 125/250 MSPS? 8 Bit log vs 10/12 Bit linear FDC cath FADCs ~6000 channels 62.5 MSPS? Positive input polarity BCal FE Photodetector, discriminator TOF FE HV, discriminator Tracking FE Level 1 TriggerClock/Sync/Calib TDCs ~8200 channels Vertex Tracking Tagger HV, discriminator Active Collimator At least one engineer per sub-system:

FADC price/performance space 250 MSPS125 MSPS62.5 MSPS 8 bitsSPT7721 $20AD9289 $11 / 4 channel chip 10 bitsMAX1124 $50 MAX1122 $37 AD9411 $42 ADS5122 $43 / 8 channel chip ADS5277 $40 / 8 channel chip 12 bits AD9226 $20 LTC1741 $13 ADS5221 $14 ADS5273 $65 / 8 channel chip 14 bitsAD5500 $95 LTC1742 $25 ADS5422 $31

Next (final?) version of FCAL FADC 6U FADC Clock/ Sync Xilinx V2PRO PICMG 2.16 Small Xilinx Energy sum Ethernet

Buy FADCs? Gage LeCroy Acqiris Struck