November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

Retail Market Subcommittee Update to TAC February 5, 2004.
Technical Advisory Committee COPS Update to TAC Debbie McKeever COPs Chair 2010.
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
RTWG Report to TAC August 5, 2010 Howard Daniels.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Communication Plan for Change in DG Registration Threshold DG Registration Threshold > 1 MW –ERCOT Market Participant –Non-modeled RARF Aggregated unregistered.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
Retail Market Subcommittee Update to COPS Kathy Scott May 13,
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
CCWG January 29 th Meeting CCWG Update to COPS February 9,
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Commercial Operations Sub-Committee Update to TAC December 4, 2008.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
RMS Update to TAC October 5, RMS Activity Summary 2008 Test Flight Schedule Update on TAC directive relating to identifying issues with net metering.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
Distributed Renewable Generation Profile Implementation Plan.
TX SET Update to RMS Wednesday, November 7, 2007.
Distributed Generation Registration June 30, 2008.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
Update to RMS June 2,  Smart Energy Roadmap Report ◦ Recommendation review led by Doug Lewin of SPEER ◦ Report accessed via
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 TAC Report to the ERCOT Board November 14, 2006.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Commercial Operations Subcommittee (COPS) Update to TAC 2/25/2016.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
COPS JUNE 2013 UPDATE TO TAC 06/06/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Commercial Operations Sub-Committee Update to RMS
TAC Report to the ERCOT Board
August 25, 2016 TAC Update to COPS
Commercial Operations Sub-Committee Update to TAC
Presentation transcript:

November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task Force

2 NOIE DRG Settlements TF update to COPS November 10, 2009 COPS Charge to the NOIE DRG Settlements Task Force May 2009 –Provide a forum for market discussions and bring recommendations to COPS on the Settlement of DRG located behind NOIE metering points with a design capacity of 50kW or greater June 2009 –Continue Discussions –Provide a list of Pros and Cons for identified options Option 1: Treat as generation Option 2: Treat as NOIE “load inflow” Option 3: Provide TDSP exemption from reporting July 2009 –Work on drafting a PRR to make the zonal protocols equate to the nodal protocols for registration requirements to support “Option 1: Treat as Generation” for NOIE DRG = or > 50kW & < 1MW and detail an implementation plan for the PRR.

3 NOIE DRG Settlements TF update to COPS November 10, 2009 COPS Charge to the NOIE DRG Settlements Task Force August 2009 –Look at the threshold for submittal of data required by section and any associated issues if a recommendation to change the threshold is made. September 2009 –Continue work on the Task Force recommendation to move the threshold for the distributed generation data submission requirement to 1MW and apply this to all DG, not just DRG. October 2009 –Continue Discussions

4 NOIE DRG Settlements TF update to COPS November 10, 2009 NOIE DRG Settlements Task Force Meetings June 1 st – 9:30 am to 12:30 pm July 1 st - 9:30 am to 12:30 pm August 3 rd - 9:30 am to 12:30 pm September 4 th - 9:30 am to 12:30 pm October 5 th - 9:30 am to 3:30 pm October 14 th - 1:30 pm to 5:00 pm November 2 nd - 9:30 am to 12:00 pm Next Meeting Date - TBD

5 NOIE DRG Settlements TF update to COPS November 10, 2009 Task Force Meeting Attendance on November 2, 2009 NameCompanyName (web-ex)Company Don TuckerERCOTDarryl NelsonOncor Adrianne BrandtAustin EnergyMike TroellSTEC Calvin OpheimERCOTJack BrownGarland Eric GoffReliantMartin LozanoAustin Energy Ken RiordonLCRAKathy ScottCNP Energy Sonja MingoERCOT

6 NOIE DRG Settlements TF update to COPS November 10, 2009 Threshold Trigger Point and “Automatic” Changes Threshold trigger point – DG installed capacity –Zonal - No need to include Limited deployment of DG expected before Nodal go live –Nodal - Apply to Load Zone Any Load Zone hits 10 MW threshold - triggers Market Action Automatic changes –The registration threshold is lowered below 1 MW –New threshold is based on reducing the aggregate generation to no more than 7 MW in any Load Zone (Nodal Market) –ERCOT to issue a market notice that includes the new threshold for DG registration –New value becomes effective 9 months after the market notice is released

7 NOIE DRG Settlements TF update to COPS November 10, 2009 Communication, Analysis & Decisions on Registration Threshold ERCOT shall –Inform the appropriate TAC sub-committee (COPS) of the change in DG registration requirements at the next meeting following the market notice The appropriate TAC sub-committee (COPS) shall –Analyze data and determine impact on market reliability and settlements accuracy The appropriate TAC sub-committee (COPS) may –Take action if they determine the impacts do not warrant lowering the threshold for DG registration Initiate a NPRR –Defer action for a month to gather additional data –Take no action

8 NOIE DRG Settlements TF update to COPS November 10, 2009 TDSP Reporting Applies to unregistered DG > 50kW & <= to 1 MW that sends outflow energy to the TDSP distribution system Competitive areas –Utilize existing format for DRG less than 50 kW as required in the Load Profiling Guides NOIE Areas – still under construction –Data points from the Load Profiling Guides under discussion Generation Type Interconnection Agreement effective date If PV renewable generation is present –total PV generation capacity in kW (DC) If Wind renewable generation is present –total wind generation capacity in kW (DC) If renewable other than PV or wind is present (will need to include DG) –types of units –total generation capacity in kW (DC)

9 NOIE DRG Settlements TF update to COPS November 10, 2009 ERCOT Reporting Compile TDSP submitted data –Unregistered DG > 50kW & <= to 1 MW Produce quarterly reports –Installed capacity by Lode Zone (Nodal Market) –Final reporting parameters to be defined by the Market

10 NOIE DRG Settlements TF update to COPS November 10, 2009 Other Discussion – Creating a PRR Is there value in creating a PRR at this point in time? –If PRR is presented to COPS in January 2010 Best case has it effective in June 2010 for normal timeline Initial question brought to COPS in May 2009 by ERCOT was a Zonal Question –DRG with a design capacity > 50kW - Market discussions needed to provide direction ERCOT Protocols Section require TDSP to report this generation to ERCOT ERCOT Protocols Section 16.5 does not require registration if less than 1 MW

11 NOIE DRG Settlements TF update to COPS November 10, 2009 Other Discussion – Creating a NPRR Is there value in creating a NPRR at this point in time? –Market discussion has raised awareness on DG registration requirements in the Nodal Protocols –ERCOT Protocols (Nodal) Section 16.5 requires the Resource Entity to register each All-Inclusive Resource “The Resource Entity shall register each All-Inclusive Resource with ERCOT through ERCOT registration.” This removes the ambiguity in the nodal market for the question raised by ERCOT regarding the zonal market Discussions by Task Force members seem to indicate a desire to modify the nodal market requirement in regards to registration of DG less than 1 MW

12 NOIE DRG Settlements TF update to COPS November 10, 2009 COPS Direction on Next Steps Continue Drafting PRR language? Draft NPRR language? Other direction from COPS? Next Meeting Date Options –Must verify meeting room availability Friday November 20 th Monday December 7 th – day before COPS Tuesday December 8 th – after COPS? Wednesday December 9 th – after RMS? Friday December 11 th Other?

Questions / Discussions