Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.

Slides:



Advertisements
Similar presentations
29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Advertisements

EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
1 EU Strategy for the Baltic Sea Region as a tool to implement the EU2020 European Commission Directorate General Regional Policy Territorial Cooperation.
Critical Infrastructure Protection Policy Priorities Sara Pinheiro European Commission DG Home Affairs.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation November 2009.
The Implementation Structure DG AGRI, October 2005
Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
TEN-T Info Day for AP and MAP Calls 2012 Multi-Modality Chris North TEN-T EA Head of Unit T3 – Air and Waterborne Transport, Logistics, Innovation and.
TEN-T Info Day for AP and MAP Calls 2012 Closing Points Dirk Beckers TEN-T Executive Agency Executive Director TEN-T Info Day November 2012.
TEN-T Info Day for AP and MAP Calls 2012 Introduction Dirk Beckers TEN-T Executive Agency Executive Director TEN-T Info Day November 2012.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
Performance Framework
Samuele Dossi DG for Regional Policy - Evaluation
TEN-T Info Day for AP and MAP Calls 2012 Roads Yiannis Argyropoulos TEN-T EA Head of Unit T2 – Road and Rail Transport TEN-T Info Day November.
The Single European Sky ATM Research (SESAR) initiative
EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013.
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
European Organisation for the Safety of Air Navigation ITEM 7 AGENCY BUSINESS PLANNING: Budget Process and Functional Budget Presented by the SCF Chairman.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
EU Strategy for the Baltic Sea Region
Mission Trajectory Step 1 From planning to deployment.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Lima, Peru, 5 December 2013 Smart-Cities: An EU-Wide approach Colette Maloney Head of Unit, Smart Cities and Sustainability, DG CONNECT European Commission.
Single European Sky 1 CAeM Technical Conference Single European Sky and the Impacts for Aeronautical Met Services Geneva 21 November 2006.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
NRC Biodiversity EEA new Strategic Cycle Copenhagen, 27&28 October 2013 Ivone Pereira Martins, Head of Group, NSV1.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Information Management The ICAO Perspective
Transport Revised Performance and Charging Regulations Key changes.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
SESAR and ASAS Opportunity
Trans-European Transport Network and the Connecting Europe Facility
SESAR Single European Sky Air traffic management Research
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
David Bowen Head of ATM Operations and Systems
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
Nigel Makins EUROCONTROL
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
The partnership principle and the European Code of Conduct on Partnership.
Session 3 Steps towards the SESAR deployment and the ATM system modernisation Moderator : Matthias Ruete Director General Mobility and Transport, European.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
The Panafrican Programme Reference Group on Infrastructure February 2016 Addis Ababa.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
An Action Plan for nature, people and the economy COM(2017) 198 final Nicola Notaro Head of Unit Unit D.3 "Nature Protection" DG Environment Tallinn.
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
OptiFrame WP1: Project Management
Critical Infrastructure Protection Policy Priorities
The Instrument for Stability Crisis Preparedness Component: Lessons learned Review of Peace-building Partnership activities to date.
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
Presentation by: Marios Miltiadou Greek Ministry of Transport
The Single European Sky Implementation Programme: SESAME
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Funding opportunities – Connected Europe Facilities
Deployment of Intelligent Transport Systems Directive 2010/40/EU
MAP : Call ITS priority area 1: ITS * Objectives * Criteria
Presentation transcript:

Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG Mobility & Transport

Transport Implementing the Single European Sky The implementation of the Single European Sky goes through five pillars with the overall objective to improve Air Traffic Management's performance Out of the five pillars, 2 connects directly with the multimodal and cross-cutting priorities of the Multi Annual Programme Call: Performance pillar: restructuration of the European airspace through the establishment of Functional Airspace Blocks (FAB) Technological pillar: modernisation of the Air Traffic Management (ATM) infrastructure through the deployment of SESAR technologies and procedures 2

Transport SES technological pillar's status An ambitious European ATM modernisation project – SESAR – which development is managed by the SESAR JU An updated European ATM Master Plan approved by the Member States and the Stakeholders which provides: A roadmap to modernise the European ATM system based on SESAR's developed and validated technologies and procedures An identification of the operational changes which are the most critical to network performance (essential) Some technologies and procedures already mature for deployment – known as SESAR baseline - with a clear potential to bring early benefits at network and FAB level An interim working arrangement to steer and monitor early deployments of the SESAR baseline – the Interim Deployment Steering Group (IDSG) – pending the establishment of the governance and funding mechanisms for SESAR deployment 3

Transport Commission's IDSG initiative The Commission has established the Interim Deployment Steering Group (IDSG) with the objective to identify, steer and monitor the implementation of essential SESAR baseline deployments which are: critical to network performance; relevant to existing regulations; mature for initial operational capability before end 2014; whilst requiring multi-stakeholders synchronisation. Through the above criteria, selected deployments are expected to bring significant early benefits at network and FABs levels 4

Transport The Interim Deployment Programme The IDSG has produced an Interim Deployment Programme (IDP), which derives from the European ATM master plan and focuses on a subset of SESAR baseline operational changes that the updated European ATM Master Plan identifies as essential. The resulting priorities are organised into 7 activity areas which are then further detailed in the programme: 1.Collaborative flight planning; 2.Airspace Management; 3.Airport Cooperative Decision Making; 4.Air Ground Data Link; 5.Automated assistance to Controller; 6.Required Navigation Performance (RNP) Approaches; 7.Continuous Descent Operation/Continuous Climb Operations 5

Transport Supporting the execution of the IDP (1/2) MAP 2012 Call for Proposals is a unique opportunity to support the execution of the IDP ATM related actions to be supported should be in line with the IDP and the ATM Master plan: addressing tasks defined in the IDP, thus ensuring alignment with agreed priorities for SESAR baseline deployment and optimum contribution to expected early benefits; implementing key enablers defined in the ATM Master Plan; complying with geographical applicability and target dates as defined in the IDP. In particular, intermediate results should be available by end 2015 at the latest. 6

Transport Supporting the execution of the IDP (2/2) MAP 2012 Call for Proposals is a unique opportunity to support the execution of the IDP ATM related actions to be supported should : Involve at least 2 Member States; Aim at synchronising between stakeholders; Favour a network level or a FAB level approach. 7

Transport Useful links The Interim Deployment Programme is available at: Or