Presentation is loading. Please wait.

Presentation is loading. Please wait.

MAP : Call ITS priority area 1: ITS * Objectives * Criteria

Similar presentations


Presentation on theme: "MAP : Call ITS priority area 1: ITS * Objectives * Criteria"— Presentation transcript:

1 MAP 2007-2013: 2012 Call ITS priority area 1: ITS * Objectives * Criteria
European Commission – DG MOVE TEN-T 2012 Calls Information Day - 29 Nov 2012

2 'ITS project proposals' should
… be instrumental in achieving the objectives of the ITS Directive 2010/40/EU accelerated roll-out of services interoperable, scalable deployment bring & demonstrate benefits (to users & operators) door-to-door continuity of service pan-European harmonisation from an end-user perspective | 2

3 Objectives – cfr. Work Programme
Art 5 & 9 of TEN Guidelines Optimisation of capacities Intermodality Safety & Reliability of the networks Traffic Management & user Information priority fields: Europe-wide Traffic & Travel Information services Europe-wide Traffic Management services Europe-wide Freight & Logistics Road safety & security | 3

4 Priority Area ITS: objectives & requirements
1. Works: focused & corridor-based Separate project proposals for specific core service(s) Corridors: description of the network/ hubs/ platforms Obligatory use of standards, specs, 'deployment guidelines' (*) Clearly contribute to the objectives of the ITS Directive minimum 3 Member States priority to proposals enclosing well-committed stakeholders indication of precise state of art & anticipated outcome reporting contributing to EU harmonisation & development of specs (*) notably Easyway 2012 Deployment Guidelines | 4

5 Priority Area ITS: objectives & requirements (2)
2. Studies: exploitation or gap-addressing platform to facilitate consensus building at EU level monitor, consolidate & report on pan-european roll-out evaluation of impacts & proliferation of best practices specification development - pilot assessment (**) starting from & co-operation with implementation projects consolidation of results to foster uptake & operational use clear methodology - definition of processes demonstration of EU-wide engagement & support (**) in direct support of the ITS Directive & conform to 5-years plans reported | 5

6 Criteria & budget – cfr Work Programme
Eligibility – cfr Section 6 works: minimum 3 Member States Selection – cfr Section 7 Award – cfr Section 8 relevance – maturity – impact - quality Final selection ≈ 'overall contribution to the objectives of the ITS Directive' Budget (indicative): € 50 Mio (ITS including EETS) | 6


Download ppt "MAP : Call ITS priority area 1: ITS * Objectives * Criteria"

Similar presentations


Ads by Google