TADIPUDI LIFT IRRIGATION SCHEME

Slides:



Advertisements
Similar presentations
PHOTOGRAPH OF COMPLETED SCHEME UNDER IAP UNDER PASCHIM MEDINIPUR DISTRICT. Name of the scheme Photograph of Scheme. Deep tube well with pump house for.
Advertisements

Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
NON-INT BEARING ADVANCES 1.Festival Advance 2.Flood/Drought Advance 3.Cycle Advance 4.Warmcloth Advance
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
1 1 National Highways Development Project(NHDP) Ministry of Road Transport and Highways National Highways Authority of India.
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Kindred North Motton Irrigation Scheme Landholder water sale 2 February 2012.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
2006 Technical Affairs Water Projects Department.
Presentation By Dr.Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
(POLAVARAM) (Head Works)
Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Delhi
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Hydro Electric Power Plant
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
Successful implementation of M.G.N.R.E.G.S at Rajkanika Block, Dist-Kendrapara.
Presentation Format MGNREGA PMGSY Rural Housing : IAY BRGF Integrated Action Plan.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
STANDING COMMITTEE ON APPROPRIATIONS Water Trading Entity 1 Briefing on the 4 th Quarter Expenditure Report for the Financial Year 2011/12.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System.
Erdeneburen HPP Project Implementation Unit
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
By: Vijay Shivtare Minister of state for WRD, WCD, Maharashtra, India Hanumant Dhumal Superintending Engineer, Water Resources Department, Maharashtra,
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Hyderabad city water supply system
Industrial Zone Alatau district of Almaty
City:- Corporation of City of Panaji
Review of CADWM Projects Under PMKSY
PPL1.6 Pumping Plant Project Overview
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Presentation transcript:

TADIPUDI LIFT IRRIGATION SCHEME Lift Height : 27.00 Mts Pumps : 6 Nos. of 4,000 HP each Discharge : 700 Cusecs. Agreement Date : 23-1-2004 Present Stage : work in progress Length of the canal : 80.45 Km. Ayacut : 2,06,572 Acres Power required : 28 MW Tender Amount : Rs. 302.64 Cr. PROGRESS 1st Pump House, Pressure Mains, Cistern : Progress 2nd Pump House, Pressure Mains : Progress Main Canal : Progress 2nd Lift Pumps, Pump Houses, Pres. Mains : Designs &Drawings Under Approval Utilisation : 14.40 TMC Ayacut : 2,06,600 Acres 4 Nos. of 3,000 HP each For each pump house (2 Pump houses) 0.00 KM GODAVARI RIVER GODAVARI RIVER PUMP HOUSE DELIVERY CISTERN M A I N C A N A L PSC PRESSURE MAINS (2 x 6 Nos.) 80.45 KM TADIPUDI (V) (WEST GODAVARI (DT)) KM 5 L1 L2 KM 15.90 KM 33.50 L3 L4 KM 80

TADIPUDI LIFT IRRIGATION SCHEME 1 PROJECT PROFILE : Located near Tadipudi (V) of West Godavari District about km 26.20 upstream of SACB, Dowlaiswaram 2 Administrative Sanction Rs. 295.80 Crs. : 1)Rs. 132.00 Crs.,(G. O. Ms. No. 127, Dt: 27-8-03 2) Rs. 105 Crs G., O. Ms. No. 9, Dt: 20-1-2004 3) Rs. 58.40 Crs.,G. O. Ms. No. 13, Dt: 20-1-2005 3 No. of EPC Packages (2 old packages + 2 new packages) 4 Nos 4 Agreement value of 4 packages 302.65 Crs. 5 Budget provision for 2006-07 Rs.100 Crs. 6 Expenditure of the project 2004 – 05 Rs. 48.06 Crs. 2005 – 06 Rs. 43.11 Crs. Cum. Exp. Rs. 91.17 Crs 7 Utilisation 14.47 TMC Drinking water 5.3 lakh population 8 Ayacut By gravity 1,38,000 acres By lift 68,600 acres Total 2,06,000 acres

Lift-I @ Km 5.0 Lift Height : 21.305 M No. of Pumps 1 No. Total pumps capacity 1 x 370 HPs Lift-II @ Km 30.25 23.13 M 2 Nos. 2 x 510 HPs Lift-III @ Km 39.45 24.108 M 3 No. 3 x 900 HPs Lift-IV @ Km 80.891 12 M 3 Nos. 3 x 1230 HPs Power required 23 MW

10 Land Acquisition Required : 2047 acres Acquired 733 acres 12 Estimated cost of L.A. Rs.41.51 Crs 13 Mob. Advance (Rs. in Crores.) Paid Recovered 2004-05 15.04 5.34 2005-06 3.15 -- Total 18.19 5.34

TADIPUDI LIFT IRRIGATION SCHEME PKG No. Description Agt. Value & Date Agt. Period Name of the contractor 1 Supply, commissioning of pumping machinery construction of pump house, delivery cistern, 1st pump house Rs. 30.47 Cr Dt: 23-1-2004 18 Months M/s KBL Ltd, Pune 2 Supply, commissioning of pumping machinery construction of pump house, delivery cistern, 2nd pump house Rs. 30.81 Cr Dt: 22-07-04 M/s NCC Ltd, Hyd 3 Execution of main canal from KM 0.0 to Km 80.450 to irrigate an ayacut of 1,38,000 Acres Rs. 178.36 Cr Dt: 04-10-2004 24 Months M/s Maytas Infra Ltd, Hyd 4 Construction of 4 Nos. of Lift Irrigation Schemes (II lift), commissioning of pumping machinery, construction of pump house Rs. 63.00 Cr. Dt:. 09-04-2005 M/s Unity Infra projects Ltd, Mumbai

TADIPUDI LIFT IRRIGATION SCHEME Pkg.No. : Pump house – I, supply and commissioning of pumping machinery, transformer, substation raising main including construction of pump house and delivery cistern etc., at Km 26.200 on AGRB near Tadipudi (V), Tallapudi (M), West Godavari (D). Name of the Contractor : M/s. Kirloskar Brothers Ltd. Agreement Amount : Rs. 30.48 Crs. Agreement Date : 23-01-2004 Mile stones : 9 Date of Completion : 3/2006 Investigation : Completed Designs approved : 30 Nos. against 40 Nos. Structures approved : 2 Nos. against 3 Nos. Execution (laying pressure mains) : 12 Kms length against 16 Kms Pumps : All 4 Nos. at site Pump houses : Completed Cistern : Completed Lifts : Lift Completed Pressure mains : 5 Nos completed against 6 Nos Qty. of concrete work done : 5550 cum against 6000 cum No. of Machinery : 7 Nos. (3 Cranes, 4 Tippers) Expenditure : 2004-2005 - Rs. 12.70 Crs. 2005-2006 - Rs. 12.14 Crs. Cum. Inc. Mob. Adv. only - Rs. 24.84 Crs. LA : Required 722.78 acres, acquired 434.44 acres

TADIPUDI LIFT IRRIGATION SCHEME Pkg.No. : Pump House – II, supply and commissioning of pumping machinery, transformer, substation raising main including construction of pump house and delivery cistern etc., at Km 26.250 on AGRB near Tadipudi (V), Tallapudi (M), West Godavari (D). Name of the Contractor : M/s. Nagarjuna Cont. Co., Agreement Amount : Rs. 30.81 Crs. Agreement Date : 22-07-2004 Period of completion : 24 Months (8 Mile Stones) Target date of Completion : 6/2006 Investigation : Completed Designs approved : 27 Nos. against 40 Nos. Structures approved : 2 Nos. against 3 Nos. Execution (laying Pressure mains) : 6 Kms length against 16 Kms Pumps : All 4 Nos. of pumps at site Pump house : work is in progress in 1 pump house Pressure mains : 2 Nos. against 6 Nos. laid Cistern : Completed Lifts : work commenced. Qty. of concrete work done : 2500 cum against 3500 cum. No. of Machinery : Deployed 3 Nos. of Cranes Expenditure : 2004-2005 - Rs. 9.09 Crs. 2005-2006 - Rs. 9.41 Crs. Cum. Inc. Mob. Adv. only - Rs. 18.50 Crs. Land Acquisition : Required 527.92 acres, Acquired 53.65 acres

TADIPUDI LIFT IRRIGATION SCHEME Pkg.No. : Execution of main canal Km 0.00 to 80.45 and its distributaries, FCs including CM & CD works complete to irrigate an ayacut of 1,38,000 acres (appr.) Name of the Contractor : M/s. Mytas Infra Projects Ltd. Agreement Amount : Rs. 178.36 Crs. Agreement Date : 04-10-2004 Period of completion : 24 Months (8 Milestones) Date of Completion : 10/2006 Investigation : Completed Designs (Canal) : 60.45Kms. against 80.45Kms Structures : 20 Nos. against 216 Nos. Execution (Canal) : 13 Kms length against 80.45 Kms Qty. of earth work done : 16.21 Lakh cum against 1,00,00,000 cum Qty. of concrete work done : 13,600 cum No. of Machinery : 60 Nos. (12 executers, 30 tippers, 5 tractors, 5 dozers etc) Expenditure : 2004-2005 - Rs. 26.27 Crs. 2005-2006 - Rs. 17.21 Crs. Cum. Inc. Mob. Adv. only - Rs. 43.48 Crs Land Acquisition : Required 796.33 acres, acquired 112.62 acres

TADIPUDI LIFT IRRIGATION SCHEME Pkg.No. : Construction of 4 Nos. of LI Schemes (II stage) at KM 5.00, KM 15.90, KM 33.50 and KM 80.80 of main canal of Tadipudi LIS. Supply installation, testing and commissioning of pumping machinery transforms, substations, raising mains, approach channels, construction of pump house, pressure mains one, delivery system, electrical works etc., and excavation of main canal and distributaries FCs including construction of CM & CD works etc., Name of the Contractor : M/s. Unity Infra Projects Ltd. Agreement Amount : Rs. 63.00 Crs. Agreement Date : 09-04-2005 Period of completion : 16 Months Investigation : Completed Designs : In progress Execution : 5 KM against 200 Km Laying of pipe line : Pump house 1 No. against 4 Nos., Pressure mains : 1 No. against 4 Nos., Cistern : 1 No. against 4 Nos., Lift 1 No. against 4 Nos. No. of Machinery : 5 (Crane-1 No., Tippers – 4 Nos.) Expenditure : 2005-2006 - Rs. 4.35 Crs. Inc. Mob. Adv. only Land acquisition : Required 401 acres, acquired 20 acres