VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac

Similar presentations


Presentation on theme: "VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac"— Presentation transcript:

1 VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
2. EMC (199 km) ,45,000 Ac 3. Udayagiri Canal ,000 Ac In fall 4. West Branch Canal ,000 Ac Regulator 5. Supplementation ,500 Ac Nallamalasagar TOTAL ,38,000 Ac FRL m Approach Cap TMC Channel 100 m PACKAGE-2 Teegaleru Canal Peddi Reddipally (27.33 cumecs) Reservoir Foreshore of Flood Flow Canal 48.15 km FRL +188m Srisailam Tunnel Sunkesula Gap 62000 Ac Cap TMC Reservoir 328 Cumecs Gottipadia Gap (PACKAGE-3) MDDL +834 ft 18.80 km FRL +885 ft 23.20 km Kakarla Gap Eastern Main Canal BL +842 ft PACKAGE-1 Link km 24.45 2,45,500 Ac Udayagiri Channel Branch Canal 9.6 km PACKAGE-4 199 km Lift I 17.5 km 0.00 Turimella Reservoir 52000 Ac FRL +235 m GB Reservoir Cap TMC FRL m Lift II Cap TMC Western Branch Canal Lift III (51,000 Ac) Under progress Racherls Tank Western FRL m 22.70 km Canal

2 VELIGONDA PROJECT 43.50 TMC 4,38,000 acres 14 TMC 4 lakh population
Project Profile: Kollamvagu foreshore on Right bank of Srisailam Reservoir near Markapur, Prakasam District 2 Administrative Sanction : G. O. Ms No. 120, Dt: for Rs. 765 Crs. and G. O. Ms. No. 164, Dt: for Rs Crs for Sunkesula & Gottipadiya Gaps. 3 No. of EPC Packages 4 No 4 Agreement value of 4 packages Rs Crs. 5 Budget provision for Rs Crs. 6 Expenditure of the project 2004 – 05 Rs Crs. 2005 – 06 Rs Crs. Cum. Exp. Rs Crs 7 Utilisation Ultimate 43.50 TMC Ayacut 4,38,000 acres Phase I 14 TMC Drinking Water 4 lakh population 8 1,19,000 acres

3 Area under Submergence of the project (in acres)
9 Land Acquisition Required : 11,453 acres Requisitioned 11,195 acres Acquired 2,920 acres 10 Forest land 3621 acres of land identified and handed over to forest department for compensatory afforestation. 11 Area under Submergence of the project (in acres) Stage I Ultimate stage Forest 6426 Govt. 9953 Patta 29990 Total 46369 No. of families likely to be displaced 12 Estimated Cost of LA (Phase I) Rs Crs. 13 Estimated Cost of R & R Rs Crs. 14 Clearances Site clearance accorded. Environmental clearance proposal submitted to CWC, New Delhi during 1/06

4 15 Mob. Advance (Rs. in Crores) : Paid Recovered Total 16 Target date of completion 8/2008

5 M/s Sabir-SEW-Prasad (JV)
VELIGONDA PROJECT CATEGORY-I PKGNO Description Name of Contractor Bid Amount Rs. in Crs. Agreement concluded Period of completion 1 Tunnel, Approach channel M/s Sabir-SEW-Prasad (JV) 624.60 36 Months 2 Feeder channel, Sunkesula Dam, tegaleru canal M/s. Gayatri-Jayaprakash (JV) 254.50 30 Months 3 Gottipadia gap, Gottipadia canal M/s Lareson & Turbo Ltd 380.00 30 months 4 Kakarla Dam, Eastern Main Canal M/s SCL-BSCPL (JV) 206.80 TOTAL

6 VELIGONDA PROJECT Pkg.No. 1 : Construction of Tunnel from TBM from Kollamvagu in the foreshore of Srisailam Reservoir up to Guntur – Kurnool road including construction of head regulator, approach channel, exit channel. Name of the Contractor : M/s. SABIR,SEW&PRASAD(JV) Agreement Amount : Rs Crs. Agreement Date : Period of completion : 36 Months (12 milestones) Target date of completion : 8/2008 Investigation : in progress Designs : yet to be started Execution : Yet to be started Expenditure : Rs Crs. (Inc. Mob. Advance) Land Acquisition : Required Acres, Acquired Acres Bottlenecks : Forest clearance is awaited

7 VELIGONDA PROJECT Pkg.No. 2 : Closing of Sunkesula Gap, excavation of feeder channel and Teegaleru canal including construction of CM & CD works and distributary system for 62,000 Ac. Name of the Contractor : M/s. Gayatri-Jayaprakash (JV) Agreement Amount : Rs Crs. Agreement Date : Period of completion : 30 Months (10 milestones) Target date of completion : 8/2007 Investigation : Completed Designs : yet to be started Execution : in progress Qty. of earth work done : 55,000 cum against 61,10,000 cum. Expenditure : Rs Crs. Rs Crs. Cum. Exp. Inc. Mob. Adv. only - Rs Crs. Land Acquisition : Required 6317 Acres, Acquired 378 Acres

8 VELIGONDA PROJECT Pkg.No. 3 : Closing of Gottipadia Gap and excavation of Gottipadia canal including construction of CM & CD works and distributary system for 9500 Ac. Name of the Contractor : M/s. Larsen & Toubro Ltd., Agreement Amount : Rs Crs. Agreement Date : Period of completion : 30 Months (10 milestones) Target date of completion : 8/2007 Investigation : Completed Designs : in progress Execution : in progress Qty. of EW done : cum against cum Qty. of concrete work done : 52,653 CuM against CuM. Expenditure : Rs Crs. Rs Crs. Cum. Exp. Inc. Mob. Adv. only - Rs Crs. Land Acquisition : Required Acres, Acquired Acres

9 VELIGONDA PROJECT Pkg.No. 4 : Closing of Kakarla Gap by construction of NOF dam, excavation of link canal and part of eastern canal together with distributary system including CM & CD works for 47,500 Ac. Name of the Contractor : M/s. SCL – BSCPL (JV) Agreement Amount : Rs Crs. Agreement Date : Period of completion : 36 Months (12 milestones) Target date of completion : 8/2008 Investigation : Km length against Km Designs : in progress Execution : Yet to be started Qty. of earth work done : 35,000 cum against 86,350 cum Expenditure : Rs Crs. (Inc. Mob. Advance) Land Acquisition : Required Ac., Acquired Ac. Tunnel : Decision has to be taken for the ultimate stage i.e, 2nd tunnel of 9.2 M dia are increasing the existing tunnel of 7 M dia to 11 M dia.