LEGIONELLA AWARENESS COURSE. COURSE OBJECTIVES To enable you to be aware of issues associated with Legionella within the UoP & be able to assist in the.

Slides:



Advertisements
Similar presentations
Learning Outcome 2 Working practices.
Advertisements

Engineering in business and the environment Lesson 6: Health and safety legislation.
SHE Code 37: Chemical Safety Safety, Health and Environment (SHE) Group.
HBI FEDECAI Conference Legionella – A British Perspective Presented by David Handley of Healthy Buildings International On 24th October 2002 in Valencia.
Legionella management in the hospitality industry Mrs A Ferrero Environmental Health Officer East Devon District Council.
2 3 Risks are present whenever people are in contact with:  Natural or organic materials  Substances of animal origin  Food and food products  Organic.
Assessing risk in sport
TRANSPORTATION (Farm Gate to Processing Facility).
1 Introducing.... Legionella Intelligence Temperature monitoring and compliance Medical Intelligence Temperature monitoring and compliance Boiler Intelligence.
Work In Confined Spaces
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
LEGIONELLA MANAGEMENT & CONTROL NUQPR024 V
Health and Safety Manual Section L6 Legionella. Legionella L6 is a single set of standards for the management of Legionella bacteria, based on the HSE.
Legionnaires’ disease – The hidden killer in water systems Managing the Risk presented by Karl Collingwood Wednesday 26 February 2014.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Health and safety at work
State and Local. 3 Levels of government in ensuring food safety FSANZ development of food safety standards. DHS: Implementing and enforcing food legislation.
Importance of Documentation Demonstratin g Due Diligence concept application defense.
RECORD KEEPING. AIMS OF THE TRAINING GUIDE This training guide explains:- Why we keep records Our responsibilities What records do we need to keep Penalties.
Health and Safety Act 1974 What does it mean to me and the place where I work?
Health & Safety Risk Assessments.
Legionella control in the University of Sheffield Legionella Awareness for Departmental representatives.
MAKE SURE YOUR OWN ACTIONS REDUCE RISKS TO HEALTH AND SAFETY.
WHAT’S in the PIPELINE? Tobias van Reenen CSIR
Safe Working Practices - Contents
Legionella Risk Assessment Mike Rose. Legionella Risk Assessment Identification and evaluation of sources of potential risk Means by which exposure is.
SESSION TWO LEGAL REQUIREMENTS
More information can be found on
 The Health and Safety at Work Act, 1974  UK Health and Safety Regulations UK Legislation  EC Directives EC Legislation Elma Graham.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Food Safety Act, food hygiene regulations, HACCP, HASAWA, HSE.
HEALTH & SAFETY – LONE WORKING
SHE Code 38: Control of Legionella Safety, Health and Environment (SHE) Group.
LEGIONELLA AWARENESS SEMINAR for the NORTH WEST WALES HEALTH AND SAFETY GROUP by Ken Ashley formerly HM Specialist Inspector HSE Dangerous Pathogens Section.
IOSH Essex Branch Event Event Subject: Legionella Awareness Date: 8 December 2010.
CHAPTER 7 (addition) Hygiene Objective: examining how to ensure hygiene in the hotel through efficient housekeeping operations.
IOSH Essex Branch Event Event Subject: Legionella Outbreaks Date: 8 December 2010.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Health & Safety Awareness - The basics. Sharon Currie Robert Fisher HWL Advisers (OH&S)
Health and Safety Executive Health and Safety Executive LEGIONNAIRES’ DISEASE AND GAS SAFETY: Landlords’ responsibilities Sue Matthews HM Inspector of.
Safe Learning in the Workplace – Unit 413. Learning Objectives By the end of the end of the session you will: 1.State why health and safety legislation.
LEGIONELLA MANAGEMENT & CONTROL. LEGIONELLACEAE Legionella = aquatic bacteria Naturally widespread in the environment 52 different species identified.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
MODULE ONE. AIM To understand the causes and spread of infection and be able to apply the principles of infection prevention and control.
Legionella Awareness East Anglia Construction Safety Group 23 April 2009.
New Rules on Legionella Prevention N. Bangert TS Workshop 2005, Archamps.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Legionella Control & Management by Rami E. Kremesti M.Sc.
A Health and safety law training programme for employers This programme has been set up to guide employers on some of the basic H&S legislation in the.
Legionnaires Disease – what landlords need to know! John Blackwood Chief Executive Scottish Association of Landlords.
Health and Safety Unit 3 Sophie Bevan. COSHH What does it stand for? ‘The Control of Substances Hazardous to Health’ Regulations (2002) What does it.
Legionella Awareness Phil Land H 2 O Chemicals Ltd 11 May 2011.
Health & Safety for Furze Platt Governors Presented by Phil West Health and Safety Advisor RBWM.
Kate Brierley Nurse Consultant in Health Protection Cumbria and Lancashire Health Protection Unit NW Regional Lead for HCAI March 2012 Legionella in Residential.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Questions HASAWA. 1. State the aims of the Health and Safety at Work Act. To protect employees by the law. To protect employers by the law. To increase.
Water Hygiene SH8 Lee Stuckey.
Handout 1: Health and safety at work
Health & Safety at Work Act 1974
Copyright © 2017 American Academy of Pediatrics.
Risk Assessment should include:
CHAPTER 7 (addition) Hygiene
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
Control of Legionella in hot and cold water systems
SHE Code 38: Control of Legionella
Legionnaires’ disease
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
HACCP HAZARD ANALYSIS CRITICAL CONTROL POINTS
Session 8: Risk Assessments and Water Systems
M-Learning 4 Those Who Care
Presentation transcript:

LEGIONELLA AWARENESS COURSE

COURSE OBJECTIVES To enable you to be aware of issues associated with Legionella within the UoP & be able to assist in the delivery of the Management Plan.

LEGIONELLOSIS Legionella = water-borne bacteria Naturally widespread in the environment Over 50 different species identified 20 known to cause disease in man Legionella pneumophila – Legionnaire’s Disease Pontiac Fever / Lochgoilhead Fever

Legionella pneumophila Legionella sp. under UV illumination

LEGIONELLA Temperature range °C Proliferates at 37 °C Requires nutrients Slow moving / stagnant water Poorly managed water system = perfect environment

SYMPTOMS Head & muscle ache Tightness in chest Dry cough Sickness & diarrhoea Confusion / delirium Coma Death

‘AT RISK’ GROUPS

CHAIN OF EVENTS Bacteria present in water system Slow moving / stagnant water Adequate food source Temperature range 20-50°C Aerosol formed People present

RISK AREAS Hot & Cold Water Systems Cooling Towers & Air Conditioning Storage Cisterns Calorifiers Deadlegs Showers Spa pools LEV’s/ Fume Cupboards

Showers Operate at desired temps Poor hygiene Infrequently used Prone to scaling Create aerosol

Showers

Any Questions ?

Hot and cold water systems Cause the most cases

Cold Water Storage Tanks

Dirty Tanks = clean & disinfection

Types of Water Heaters

Legionella Control Regulation & Legislation

Legislation Health & Safety at Work etc Act 1974 (HSAWA) Management of Health & Safety at Work Regulations 1999 (MHSWR) Control of Substances Hazardous to Health Regulations 2002 (COSHH) The Notification of Cooling Towers and Evaporative Condensers 1992 The Control of Legionella Bacteria in Water Systems Approved Code of Practice & Guidance 2001 ACoP L8 Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995 (RIDDOR)

Approved Code of Practice Identification and assessment of risk Prepare a scheme for preventing or controlling the risk Implement, manage and monitor precautions Keep records Appoint a person to be managerially responsible

Risk Assessment & Control Measures Why does it matter ? The HSE views Legionnaires’ Disease as preventable To satisfy regulation and legislation To show due diligence To protect employees and public

When Should It Be Repeated? At least every 2 years or when NO longer valid e.g. – Changes to the use of the building. – Availability of new information. – Control measures are no longer effective. – Case of LD associated with system. – Changes to the system or its use.

Typical Written Scheme: H & C Water Systems Checks Monthly – temperature checks Quarterly - shower cleaning Six monthly - CWS Tank temperatures Annually - CWS Tank inspections, calorifier checks Other systems as required Weekly - flushing little used outlets

Management & Training Inadequate management, lack of training and poor communication have all been identified as contributory factors in outbreaks of Legionnaires Disease. Those who are appointed to carry out control measures and strategies should be suitably informed, instructed, properly trained and their competency assessed.

Appropriate Records Responsible persons Significant findings of the risk assessment Written scheme of actions and control measures Results of any monitoring, inspection, test or check carried out

Typical Log Book Records Training records Lines of communication Current state of operation Signature of person that did the work Plans or schematic drawings Visit log for engineers/contractors

Schematics Example

Why keep Records? To demonstrate compliance with the law Show what control measures are being taken Monitor water temperatures, system cleanliness, bacteria levels (if appropriate) Show trend analysis learn more about the systems Review performance Provide evidence of reducing the risk

Any Questions ?